| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.9 LAccepted-AOC | ₹16.9 L | 1 | Accepted-AOC lowest amount quotted |
| 2 | 2₹19.3 LRejected-AOC | ₹19.3 L | 2 | Rejected-AOC Highest amount quotted |
| 3 | 3₹19.4 LRejected-AOC | ₹19.4 L | 3 | Rejected-AOC Highest amount quotted |
| 4 | 4₹20.3 LRejected-AOC 456 1 AROOR KOOT ROAD SORAIYUR POST KALAVAI TALUK RANIPET 632318 | RANIPET | TAMIL NADU | 632318 | ₹20.3 L | 4 | Rejected-AOC Highest amount quotted |
| 5 | 5₹20.4 LRejected-AOC KUPPIDISATHAM PANCHAYAT KUPPIDISATHAM | VELLORE | TAMIL NADU | 632001 | ₹20.4 L | 5 | Rejected-AOC Highest amount quotted |
| Sl No | Description | Qty | Unit | M.MAHENDIRAN L2 | S Nithyanandham L3 | MUNIRATHINAM CONTRACTOR L5 | K Senthilkumar L4 | Thanappa a L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Construction of 30000 Lit's Capacity OHT at New ADC H/O Pattanam Panchayat in Thimiri Panchayat Union | ||||||||
| 1.01Earthwork excavation and deposition on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Board officers.Hard stiff clay, block cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B | ||||||||
| 1.02 | For Foundation | 55.13 | cum | 300 ₹16,540 | 250.59 ₹13,816 | 250 ₹13,784 Lowest | 250 ₹13,784 Lowest | 263.78 ₹14,543 |
| 1.03Sand filling with clear river sand including watering, consolidation etc.,complete for Foundation as directed by Bdo officers | ||||||||
| 1.04 | Columns | 2.3 | cum | 1,850 ₹4,255 | 1,778.81 ₹4,091 | 1,500 ₹3,450 | 1,500 ₹3,450 | 1,097.43 ₹2,524 Lowest |
| 1.05Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for fooundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Board officers. | ||||||||
| 1.06 | Columns | 3.46 | cum | 5,750 ₹19,895 | 5,269.44 ₹18,232 | 5,500 ₹19,030 | 5,500 ₹19,030 | 3,437.19 ₹11,893 Lowest |
| 1.07RCC 1:11/2:3 using 20mm HBG Metal excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing | ||||||||
| 1.08 | Items 1.50 m to 4.50m below GL | 7.58 | cum | 8,970 ₹68,028 | 8,948.97 ₹67,869 | 9,000 ₹68,256 | 9,000 ₹68,256 | 7,296.55 ₹55,337 Lowest |
| 1.09 | Items 0 m to 1.50m below GL | 1.75 | cum | 9,111 ₹15,935 | 8,835.11 ₹15,453 | 9,100 ₹15,916 | 9,100 ₹15,916 | 8,076.7 ₹14,126 Lowest |
Tender Value
Refer Docs
EMD Value
₹20,640
Closing Date
29 Jun 2026, 3:00 pmClosed
Block developement officer
Block developement office
Construction of 30000 Lits Capacity OHT at New ADC H/O Pattanam Panchayat in Thimiri Panchayat Union
2026_RDTN_680636_1
B3/1891/2015
Open Tender
Civil Works
Item Wise
180 days
Block developement office
Construction of 30000 Lits Capacity OHT at New ADC H/O Pattanam Panchayat in Thimiri Panchayat Union
2 documents required · 2 mandatory
₹0
₹20,640
Block developement office
13 Jul 2026
12 Jun 2026
29 Jun 2026
12 Jun 2026
29 Jun 2026
12 Jun 2026
12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of 30000 Lit's Capacity OHT at New ADC H/O Pattanam Panchayat in Thimiri Panchayat Union | |||||
| 1.01 | Earthwork excavation and deposition on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Board officers.Hard stiff clay, block cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B | - | - | - | - |
| 1.02 | For Foundation | - | cum | 263.78 | - |
| 1.03 | Sand filling with clear river sand including watering, consolidation etc.,complete for Foundation as directed by Bdo officers | - | - | - | - |
| 1.04 | Columns | 2.3 | cum | 1,872.43 | ₹4,306.59 |
| 1.05 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for fooundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Board officers. | - | - | - | - |
| 1.06 | Columns | 3.46 | cum | 5,546.78 | ₹19,191.86 |
| 1.07 | RCC 1:11/2:3 using 20mm HBG Metal excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing | - | - | - | - |
| 1.08 | Items 1.50 m to 4.50m below GL | 1 | cum | 9,419.97 | ₹9,410.55 |
| 1.09 | Items 0 m to 1.50m below GL | - | cum | 9,300.12 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.07 MB
tdoc.pdf
Tender Documents • 0.52 MB
BOQ_817891.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].