Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5.8 L
Closing Date
2 Feb 2022, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Maintenance In Charge
Abhinandan Bhawan IIT indore Simrol Indore-453552
Construction of practice pitch and repairing of viewers gallery at IIT Indore
2022_IITI_667949_2
IITI/IDO/Maint./Practice pitch/21-22/10
Open Tender
Civil Works
Item Rate
45 days
IIT Indore Simrol Indore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
28 Feb 2022
27 Jan 2022
3 Feb 2022
27 Jan 2022
2 Feb 2022
27 Jan 2022
180 days
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete including Painting with synthetic enamel paint of approved brand and manufacture to give an even shade Two or more coats on new work
Supplying and stacking,levelling and consolidation at site: Red soil free from boulder and gravelsas approved with levelling by gradder/tractor in required gradient Complete in all respect
Filling available soil (excluding rock) in layers not exceeding 20cm in depth, consolidating( by roller) each deposited layer by ramming and watering, lead up to 1 K.m. and lift upto 1.5 m.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Demolishing R.C.C./C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Removing & Refixing of Tiles/Granite laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels.
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground
Repairing the wall\concert cracks by widening and cleaning the crack, filling cracks with filler material ready-to-use fiber based compound(approved make) with crack filling ability for both interior and exterior surfaces and as per instruction of engineer in charge.
providing and applying multi coat synthetic plaster as per approved design, pattern, texture in 2mm 9avg.) thickness on new/old plastered surface finished in proper line and level as directed by Engineer in Charge in five coats consisting of composition of four order of application given as under including all materials, labour and scaffoldings etc. 1. scrapping of the surface and applying sealer primer mixed with water in the raito 1:3(1 part sealer primer: 3part water) and applying by brush @0.25Kg/sqm. 2 . applying levelling coat of spectrum rustic fine or equivalent with trowel as a putty 3. applying third coat of synthetic plaster with trowel @2.5kg/sqm finished to generate required textured by trowel. 4. Applying two coat of exterior super fine pigmented acrylic wall coating as top coat @0.50kg/sqm in two coats and colour as approved by Engineer in Charge all upto height of 12 m above plinth level.
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : 13.99.1 One or more coats on old work
Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc
Eternal Infraheight Pvt Ltd
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .