| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 CrAdmitted-Finance | ₹24.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹25.2 CrAdmitted-Finance GROUND FLOOR SAIKUNJ SAKSHI APARTMENT DANDE PLOT RAJA PETH AMRAVATI 444606 | AMRAVATI | MAHARASHTRA | 444606 | ₹25.2 Cr | L2 | Admitted-Finance |
| 3 | L3₹25.4 CrAdmitted-Finance OFFICE NO 03 SECOND FLOOR SUNIKET BUSINESS CENTER NEAR CYCLE CIRCLE KRUSHINAGAR JOGGING TRACK NASHIK TAL DIST NASHIK | ₹25.4 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical 04 VISHAKHA APARTMENT VASANT MARKET CANADA CORNER NASHIK | NASHIK | MAHARASHTRA | 422001 | - | - | Rejected-Technical Not Qualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | M/S HARSHVARDHAN ENTERPRISES L3 | ARM Infrastructure L2 | Atal Realtech Ltd L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling the Reinforced Cement Concrete Concrete Work 1:2:4 and sorting out the materials such as steel Et cetera as directed and stacking them within the specified lead as directed Et cetera complete. (Item No. 46.29)
A1) Dismantling Allied Ground Floor | 917.71 | Cubic Metre | 1,706.2 ₹15.7 L | 1,668.02 ₹15.3 L | 1,689.31 ₹15.5 L |
| 2.00 | A2) Dismantling Allied First Floor | 269.64 | Cubic Metre | 1,719.18 ₹4.6 L | 1,680.71 ₹4.5 L | 1,702.15 ₹4.6 L |
| 3.00 | A3) Dismantling Allied Second Floor | 268.59 | Cubic Metre | 1,732.14 ₹4.7 L | 1,693.38 ₹4.5 L | 1,714.99 ₹4.6 L |
| 4.00 | Dismantling brick masonry in lime or cement mortar and stacking the materils as directed with all leads, lifts Et cetera (Item No. 46.09)
A1) Dismantling Allied Ground Floor | 35.56 | Cubic Metre | 393.92 ₹14,008.58 | 385.1 ₹13,694.93 | 390.02 ₹13,869.89 |
| 5.00 | A2) Dismantling Allied First Floor | 181.42 | Cubic Metre | 396.92 ₹72,009.62 | 388.03 ₹70,396.79 | 392.99 ₹71,296.64 |
| 6.00 | A3) Dismantling Allied Second Floor | 195.58 | Cubic Metre | 399.91 ₹78,212.80 | 390.96 ₹76,462.39 | 395.95 ₹77,438.32 |
| 7.00 | Lowering down the debris obtained from breaking and removing the cement plaster/burnt brick masonry of the first floor by any means without causing dust nuisance and damage to structure, stacking the same as and where directed including cleaning the site complete. (Item No. 46.59)
A1) Dismantling Allied Ground Floor | 1,868.5 | Cubic Metre | 884.26 ₹16.5 L | 864.47 ₹16.2 L | 875.5 ₹16.4 L |
| 8.00 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20 centimetres. to 30 centimetres. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard proctor density for a lead of 300 metres to 500 metres inclusive, from the site of excavation to the site of deposition as directed. (Item No. 2.26)
A1) Dismantling Allied Ground Floor | 1,868.5 | Cubic Metre | 462.12 ₹8.6 L | 451.78 ₹8.4 L | 457.54 ₹8.5 L |
| 9.00 | Providing preconstructional antitermite treatment as per Indian Standards 6313(Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. (Item No. 21.22)
A1) Dismantling Allied Ground Floor | 794.05 | Square Metre | 125.82 ₹99,907.37 | 123.01 ₹97,676.09 | 124.58 ₹98,922.75 |
| 10.00 | Providing preconstructional antitermite treatment as per Indian Standards 6313(Part-II) treatment by treating the backfill in immediate contact with foundation at the rate of 5 litres of emulsion concentrate of 1.0 percent of clorophyrifos per square metre of vertical surface area covering 10 years guarantee on bond paper. (Item No. 21.23)
A1) Dismantling Allied Ground Floor | 2,363.41 | Square Metre | 131.69 ₹3.1 L | 128.75 ₹3.0 L | 130.39 ₹3.1 L |
Tender Value
₹23.9 Cr
EMD Value
₹11.9 L
Closing Date
21 Apr 2026, 5:00 pmClosed
Executive Engineer, Public Works Division, Nashik
Executive Engineer Public Works Division Nashik Bhandkam Bhawan Trimbak Road Nashik Tal. Dist. Nashik Tel. No.- 0253-2583761-64 2575324
Construction of Government Rest House Pratapgadh Building at Nashik Tal. Dist. Nashik (Civil and Electrical Works)
2026_PWR_1294830_1
E_Tender Notice No.68 for 2025-26 (Item Rate)
Open Tender
Civil Works - Buildings
365 days
Tal. Dist.Nashik
As Per NIT
9 documents required · 9 mandatory
₹3,540
₹11.9 L
The Chief Engineer, P.W. Region, Nashik
5 May 2026
14 Apr 2026
22 Apr 2026
14 Apr 2026
21 Apr 2026
14 Apr 2026
16 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismantling the Reinforced Cement Concrete Concrete Work 1:2:4 and sorting out the materials such as steel Et cetera as directed and stacking them within the specified lead as directed Et cetera complete. (Item No. 46.29)
A1) Dismantling Allied Ground Floor | 0.6 | Cubic Metre | - | - | 1 |
| 2 | A2) Dismantling Allied First Floor | 1 | Cubic Metre | - | - | 2 |
| 3 | A3) Dismantling Allied Second Floor | - | Cubic Metre | - | - | 3 |
| 4 | Dismantling brick masonry in lime or cement mortar and stacking the materils as directed with all leads, lifts Et cetera (Item No. 46.09)
A1) Dismantling Allied Ground Floor | 1 | Cubic Metre | - | - | 4 |
| 5 | A2) Dismantling Allied First Floor | 0.4 | Cubic Metre | - | - | 5 |
| 6 | A3) Dismantling Allied Second Floor | 0.4 | Cubic Metre | - | - | 6 |
| 7 | Lowering down the debris obtained from breaking and removing the cement plaster/burnt brick masonry of the first floor by any means without causing dust nuisance and damage to structure, stacking the same as and where directed including cleaning the site complete. (Item No. 46.59)
A1) Dismantling Allied Ground Floor | 0.2 | Cubic Metre | - | - | 7 |
| 8 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20 centimetres. to 30 centimetres. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard proctor density for a lead of 300 metres to 500 metres inclusive, from the site of excavation to the site of deposition as directed. (Item No. 2.26)
A1) Dismantling Allied Ground Floor | 0.2 | Cubic Metre | - | - | 8 |
| 9 | Providing preconstructional antitermite treatment as per Indian Standards 6313(Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. (Item No. 21.22)
A1) Dismantling Allied Ground Floor | - | Square Metre | - | - | 9 |
| 10 | Providing preconstructional antitermite treatment as per Indian Standards 6313(Part-II) treatment by treating the backfill in immediate contact with foundation at the rate of 5 litres of emulsion concentrate of 1.0 percent of clorophyrifos per square metre of vertical surface area covering 10 years guarantee on bond paper. (Item No. 21.23)
A1) Dismantling Allied Ground Floor | - | Square Metre | - | - | 10 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.35 MB
BOQ_2224806.xls
BOQ • 0.71 MB
PDF6801.pdf
Tender Documents • 10.58 MB
Download all tender documents and submit your bid