Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹6.7 L+₹13,523.57 (2.05%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹6.9 L+₹26,717.29 (4.05%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹15,560
Closing Date
20 Jul 2026, 4:00 pmClosed
Er. Mohammad Waseem
Office of the Executive Engineer RnB Ang
Construction of Drainage System in Reshi Colony Lane No. 05 (Ph-2nd) Anantnag.
2026_PWDJK_315602_1
NIT 43 of RnB/Ang/2026-27/3857-66 Dt 11/07/26
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
4 documents required · 4 mandatory
₹300
Executiver Engineer rnB Division Anantnag
₹15,560
23 Jul 2026
11 Jul 2026
21 Jul 2026
11 Jul 2026
20 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying of stone soling of tightly hand packed in bed including carriage | 15.25 | Cum | - | - |
| 2 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using M7.5 mix. (1:4:8) and by using 20 mm down aggregates incl carriage | 17.94 | Cum | - | - |
| 3 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using M15 mix. (1:2:4) and by using 20 mm down aggregates incl carriage | 9.03 | cum | - | - |
| 4 | Providing and laying in position reinforced cement concrete of specified grade excluding the cost of centering & shuttering using ( 1:1.5:3and by using 20 mm aggregates incl carriage | 15.08 | cum | - | - |
| 5 | Reinforcement for RCC work incl cutting bending fixing complte job FE 550 D TMT Bars | 1,812.26 | kgs | - | - |
| 6 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete | 225 | kgs | - | - |
| 7 | Centering and shuttering , incl strutting propping etc. and removal of form work for Suspended floors | 44.61 | sqm | - | - |
| 8 | Providing and laying PVc pipe , incl all costs and carriages complte 6" dia | 20 | Rm | - | - |
| 9 | Providing and laying of MS steel pipe incl earthwork , levelling of bed laying of pipe incl cusion all carriages complete | 30 | Rm | - | - |
stage.html
html • 0.02 MB
finance_1024404.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_1024404.xls
BOQ • 0.28 MB
CORRIGENDUMDATE43.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .