| Sl No | Description | Qty | Unit | M/S GHULAM MOHI UD DIN RATHER L1 | M/S SUHEEL CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | M&L scarifying or picking graveled, macadam or bituminous macadam surfaces in area exceeding 400 sqm, exceeding 50 mm but not exceeding 100mm deep and removing there of as accounted under credit, complete all as specified and as directed. | 10 | XSqm | 50 ₹500 | 10 ₹100 |
| 2.00 | M&L 75mm thick (Compacted thickness) WBM with coarse aggregate of grading 2 (63 to 40mm size) or of grading 3 (50 to 20mm size) spread, rolled and consolidated to gradient and camber required with 10 to 12 tonne power roller complete all as specified and directed. | 10 | XSqm | 2,300 ₹23,000 | 2,800 ₹28,000 |
| 3.00 | M&L rolling and consolidating road formation surfaces in cutting with power roller of capacity exceeding 10 tonne and not exceeding 12 tonne watering as necessary including filling hollows and depression to required gradient and camber complete all as specified and directed. | 10 | XSqm | 200 ₹2,000 | 110 ₹1,100 |
| 4.00 | M&L Preparation of unsurfaced WBM surfaces by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags or mechanical air compressors to remove loose dirt etc. complete all as specified and directed. | 10 | XSqm | 60 ₹600 | 20 ₹200 |
| 5.00 | M&L applying evenly a priming/tack coat with bituminous primer of grade VG-10 at the rate of 10 kg per 10 sqm using paving bitumen on WBM surfaces, complete all as specified and as directed. | 10 | XSqm | 600 ₹6,000 | 500 ₹5,000 |
| 6.00 | M&L preparing existing black top surfaces by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surfaces with gunny bags , air compressor etc to remove all loose dirt etc, complete all as specified and directed. | 210 | XSqm | 50 ₹10,500 | 20 ₹4,200 |
| 7.00 | M&L applying evenly a priming/tack coat with bituminous primer of grade VG-10 at the rate of 5 kg per 10 sqm using paving bitumen on existing black top surfaces, complete all as specified and as directed. | 210 | XSqm | 250 ₹52,500 | 200 ₹42,000 |
| 8.00 | M&L Premix bituminous, macadam with paving bitumen binder VG-30 not less than 4% by weight of total mix (the exact quantity of binder shall be determined by design mix by Marshal method) laid/rolled and compacted to required gradient and camber (consolidated thickness 75mm or less) using 10 to 12 Tonne power roller vibrating roller to acheive uniform smooth surface, complete all as specified and directed.
Notes :-
(a) Premixed Bituminuous Macadam shall be laid using self propelled hydrostatic paver finisher and preparation of mix shall be using hot mix plant and transporting the mix in tipper.
(b) The exact bitumen content required shall be determined follwing the Mix Design procedure contained in the Asphalt Institute Manual MS-2 (Sixth Edition) as referred in case 3.5.3 of IRC 111:2009. The adjustment in rate due to variation in quantity of bitumen if any shall be priced at the rate of Rs. 60.00 Per KG of bitumen. | 40 | Cum | 7,000 ₹2,80,000 | 7,000 ₹2,80,000 |
| 9.00 | M&L bituminous premix asphaltic semi dense concrete (SDAC) 30mm thick (consolidated thickness) with 5.5% binder content of paving bitumen of Grade VG-30 by weight of total mix, rolled and compacted to required camber and gradient using 10 to 12 tonne power roller and laying with mechanical paver, complete all as specified and directed.
Notes :-
(a) Bituminous premix semi dense asphaltic concrete shall be prepared in central computerised hot mix plant.
(b) Design mix shall be got done by the contractor at his own expenses from NABL laboratory as decided by GE.
(c) Contractor shall quote his rates by considering binder content @ 5.5% of total mix by weight, however in case of any variation in weight of binder contents on lower side as per actual mix design, the same shall be ajusted @ Rs. 60.00 Per Kg of bitumen.
(d) The SDAC will be provided on existing road also. | 220 | XSqm | 4,200 ₹9,24,000 | 5,300 ₹11,66,000 |
| 10.00 | M&L preparing bituminous surfaces of road and marking 2.5mm thick centre lines, stop lines, dashes, arrows etc. and the like not exceeding 10cm wide on roads pavements with hot applied thermo plastic road marking paint of approved colour confirming to BS 3262-1989 with special applicator machine all as per manufacturer's instructions including traffic diversion arrangement complete all as specified and directed. | 1,100 | RM | 100 ₹1,10,000 | 85 ₹93,500 |
Tender Value
₹19.5 L
EMD Value
₹38,929
Closing Date
13 Jun 2026, 6:00 pmClosed
Col Gaurav Kinha CWE
HQ 134 WE C/o 56 APO PIN-914134
Special repair to internal road in Haft Chinar under GE 970 EWS
2026_MES_756546_2
134WE-123(T)/2025-26
Open Tender
Civil Works - Roads
180 days
GE 970 EWS
As per tender documents
8 documents required · 8 mandatory
₹500
GE 970 EWS
₹38,929
1 Jul 2026
22 May 2026
15 Jun 2026
22 May 2026
13 Jun 2026
1 Jun 2026
22 May 2026 - 27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L scarifying or picking graveled, macadam or bituminous macadam surfaces in area exceeding 400 sqm, exceeding 50 mm but not exceeding 100mm deep and removing there of as accounted under credit, complete all as specified and as directed. | 10 | XSqm | - | - |
| 2 | M&L 75mm thick (Compacted thickness) WBM with coarse aggregate of grading 2 (63 to 40mm size) or of grading 3 (50 to 20mm size) spread, rolled and consolidated to gradient and camber required with 10 to 12 tonne power roller complete all as specified and directed. | 10 | XSqm | - | - |
| 3 | M&L rolling and consolidating road formation surfaces in cutting with power roller of capacity exceeding 10 tonne and not exceeding 12 tonne watering as necessary including filling hollows and depression to required gradient and camber complete all as specified and directed. | 10 | XSqm | - | - |
| 4 | M&L Preparation of unsurfaced WBM surfaces by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags or mechanical air compressors to remove loose dirt etc. complete all as specified and directed. | 10 | XSqm | - | - |
| 5 | M&L applying evenly a priming/tack coat with bituminous primer of grade VG-10 at the rate of 10 kg per 10 sqm using paving bitumen on WBM surfaces, complete all as specified and as directed. | 10 | XSqm | - | - |
| 6 | M&L preparing existing black top surfaces by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surfaces with gunny bags , air compressor etc to remove all loose dirt etc, complete all as specified and directed. | 210 | XSqm | - | - |
| 7 | M&L applying evenly a priming/tack coat with bituminous primer of grade VG-10 at the rate of 5 kg per 10 sqm using paving bitumen on existing black top surfaces, complete all as specified and as directed. | 210 | XSqm | - | - |
| 8 | M&L Premix bituminous, macadam with paving bitumen binder VG-30 not less than 4% by weight of total mix (the exact quantity of binder shall be determined by design mix by Marshal method) laid/rolled and compacted to required gradient and camber (consolidated thickness 75mm or less) using 10 to 12 Tonne power roller vibrating roller to acheive uniform smooth surface, complete all as specified and directed.
Notes :-
(a) Premixed Bituminuous Macadam shall be laid using self propelled hydrostatic paver finisher and preparation of mix shall be using hot mix plant and transporting the mix in tipper.
(b) The exact bitumen content required shall be determined follwing the Mix Design procedure contained in the Asphalt Institute Manual MS-2 (Sixth Edition) as referred in case 3.5.3 of IRC 111:2009. The adjustment in rate due to variation in quantity of bitumen if any shall be priced at the rate of Rs. 60.00 Per KG of bitumen. | 40 | Cum | - | - |
| 9 | M&L bituminous premix asphaltic semi dense concrete (SDAC) 30mm thick (consolidated thickness) with 5.5% binder content of paving bitumen of Grade VG-30 by weight of total mix, rolled and compacted to required camber and gradient using 10 to 12 tonne power roller and laying with mechanical paver, complete all as specified and directed.
Notes :-
(a) Bituminous premix semi dense asphaltic concrete shall be prepared in central computerised hot mix plant.
(b) Design mix shall be got done by the contractor at his own expenses from NABL laboratory as decided by GE.
(c) Contractor shall quote his rates by considering binder content @ 5.5% of total mix by weight, however in case of any variation in weight of binder contents on lower side as per actual mix design, the same shall be ajusted @ Rs. 60.00 Per Kg of bitumen.
(d) The SDAC will be provided on existing road also. | 220 | XSqm | - | - |
| 10 | M&L preparing bituminous surfaces of road and marking 2.5mm thick centre lines, stop lines, dashes, arrows etc. and the like not exceeding 10cm wide on roads pavements with hot applied thermo plastic road marking paint of approved colour confirming to BS 3262-1989 with special applicator machine all as per manufacturer's instructions including traffic diversion arrangement complete all as specified and directed. | 1,100 | RM | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
PS123.pdf
Tender Documents • 0.96 MB
BOQ_859238.xls
BOQ • 7.36 MB
Download all tender documents and submit your bid