| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹49.7 LAccepted-Finance | L-1 | Accepted-Finance 1 | |
| 2 | L-2₹50.2 L+₹49,239 (0.99%)Rejected-Finance HOUSE NO 214 WARD NO 2 TEHSIL SUJANPUR DISTT HAMIRPUR HP | HAMIRPUR | HIMACHAL PRADESH | 174304 | L-2 | Rejected-Finance 2 |
Tender Value
₹47.3 L
EMD Value
₹94,683
Closing Date
16 Jun 2026, 6:00 pmClosed
Executive Engineer
Rohru
10185-10284 dated 3-6-26Additiitonal alteration
2026_PWD_136254_6
10185-10284 dated 3-6-26
Open Tender
Civil Works - Roads
Percentage
120 days
sub
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,000
₹94,683
6 Oct 2026
10 Jun 2026
17 Jun 2026
10 Jun 2026
16 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation,trenches etc,in earth work,lift up to 1.50mtrs stacking the excavated soil not more then 3 mtr clear from the edge of the excavation and then returning the stacked soil in 15 cm layers,when required in to plinths side of foundations etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavatedearth as directed with in a lead of 20 mtrs. | 40.5 | Cum | 407 | ₹16,483.5 |
| 2 | Providing and laying Cement Concrete 1:6:12 (1Cement:6Sand:12Graded Stone aggregate 40 MM Nominal Size)and curring complete excluding complete excluding cost of form work in foundation and plinth. | 4.05 | Cum | 5,109.04 | ₹20,691.61 |
| 3 | Providing from work with steel plates 3.15 mm thick welded with angel iron in frame 30X30X5mm so as to give a fair finish including centering shuttering strutting propping and centring below suporting floor to ceiling not exceeding 4mtrs.and removal of the same for instu-reinforced conc.and plain concrete in a) Foundations footings basis of columns etc. and mass concrete including all leads and lifts, as per HPPWD, specification of 1990 volume-I as directed by the Engineer-In-Charge | 112.5 | sqm | 290.93 | ₹32,729.63 |
| 4 | Providing from work with steel plates 3.15 mm thick welded with angel iron in frame 30X30X5mm so as to give a fair finish including centering shuttering strutting propping and centring below suporting floor to ceiling not exceeding 4mtrs.and removal of the same for instu-reinforced conc.and plain concrete in :-Flat surfaces such as soffits of suspended,roofs,landings and the like.Floor etc up to 200mm in thickness. | 138.6 | sqm | 683.63 | ₹94,751.12 |
| 5 | Providing from work with steel plates 3.15 mm thick welded with angel iron in frame 30X30X5mm so as to give a fair finish including centering shuttering strutting propping and centring below suporting floor to ceiling not exceeding 4mtrs.and removal of the same for instu-reinforced conc.and plain concrete in :-Sides and soffits of beams, beam haunchings, cantilevers, bressumers and lintels not exceeding 1 meter in depth in all heights from floor.Sides,Soffits,Beam,haunchings,cantilevers,bressumers etc | 146.88 | sqm | 566.46 | ₹83,201.64 |
| 6 | Providing from work with steel plates 3.15 mm thick welded with angel iron in frame 30X30X5mm so as to give a fair finish including centering shuttering strutting propping and centring below suporting floor to ceiling not exceeding 4mtrs.and removal of the same for instu-reinforced conc.and plain concrete in :-edges of slabs and breaks in floors and walls;-under 20cm wide | 47.4 | sqm | 173 | ₹8,200.2 |
| 7 | Providing and laying Cement Concrete 1:1.5:3 (1Cement:1.5Sand:3Graded Stone aggregate 20 MM Nominal Size)and curring complete excluding cost of form work and reinforcement in reinforced concrete in Suspended floors roofs, landings and shelves and their supports, balconies,beams, girders, bressumers and cantilevers upto floor two level. | 51.4 | Cum | 11,000 | ₹5,65,400 |
| 8 | Providing mild steel tor steel etc. for rcc work including bending binding and placing in position complete etc. | 5,654.88 | kg | 110 | ₹6,22,036.8 |
| 9 | Brick work using common burnt clay building bricks in cement mortar 1:6 (1cement6sand) in foundation and plinth II nd class bricks. | 60.41 | Cum | 15,000 | ₹9,06,150 |
| 10 | Half Brick masomnry usinbg common burent clay building bricks in cement m,ortar 1:4 ( 1 cment :4 sand ). 2ND Class bricks | 75.42 | Sqm | 1,700 | ₹1,28,214 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
SBD6.pdf
Tender Documents • 4.45 MB
BOQ_201668.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .