Loading…
Loading…
Tender Value
₹6.8 Cr
EMD Value
₹10.2 L
Closing Date
2 Sept 2026, 3:00 pm6d left
General Manager (Contracts)
Bangalore Metro Rail Corporation Limited, BMTC Complex, 3rd Floor, KH Road, Shantinagar, Bangalore-560027, Karnataka, India
Construction of Wayside ASS / TSS Building and other miscellaneous works at Chikkajala on Airport Line (Ch. Km 26.20) for Bangalore Metro Rail Project, Phase-2B.
2026_BMRCL_287417_1
BMRCL/Ph2B/WayASSTSS/2026/155
Open Tender
Civil Works
Percentage
213 days
Bangalore
Please refer Tender documents.
9 documents required · 9 mandatory
₹11,800
Bangalore Metro Rail Corporation Limited
₹10.2 L
Bangalore
13 Aug 2026
13 Aug 2026
3 Sept 2026
13 Aug 2026
2 Sept 2026
28 Aug 2026
13 Aug 2026 - 20 Aug 2026
19 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Wayside ASS/ TSS Building & other miscellaneous works at Chikkajala on Airport Line (Ch. Km 26.20) for Bangalore Metro Rail Project, Phase-2B.
( total of Schedule-A and Schedule-B of BoQ) | - | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Vol5_Finproposal_155.pdf
Tender Documents • 1.17 MB
Vol4_Techproposal_155.pdf
Tender Documents • 1.94 MB
Vol3_Techproposal_155.pdf
Tender Documents • 15.44 MB
Vol2_Techproposal_155.pdf
Tender Documents • 3.22 MB
Vol1_Techproposal_155.pdf
Tender Documents • 6.08 MB
BOQ_335348.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].