Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical VILLAGE DALOG P O NARAIN TEHSIL RAMPUR BUSHAHR DISTT SHIMLA H P | SHIMLA | HIMACHAL PRADESH | 171001 | Accepted-Technical Responsive |
| 2 | Accepted-Technical | Accepted-Technical Responsive |
Tender Value
₹8.8 L
EMD Value
₹18,000
Closing Date
23 Jul 2026, 9:00 amClosed
EE Rampur
EE B and R Division HPPWD Rampur
SH C.O unlined drain and repair to Km. and maintenance of gravel road etc. in Km. 36.000 to 45.000
2026_PWD_139198_1
PW/RMP/TA/2026-4724 dated 25.06.2026
Open Tender
Civil Works - Roads
Percentage
EE B and R Division HPPWD Rampur
Please refer Tender documents.
10 documents required · 10 mandatory
₹350
Yes
₹18,000
Yes
26 Aug 2026
17 Jul 2026
23 Jul 2026
17 Jul 2026
23 Jul 2026
17 Jul 2026
17 Jul 2026 - 23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Unlined sorface drain of avarage cross section area of 0.40 square metre in all kind of soil such as oridinary soil ,ordinary rock and hard rock including blating( if required) in specified lines,grades, levels and diamension excavated matrail to be used in embankment with a lift upto 3.00 mtr and lead of 50mtr (avarge lead 25m) as per tehancial specification clause 307 including the cost of form work and hauling of matrial through all modes of transportion with in all leads and lifts as per entire satisfactions and direction of the Engineer- in- Charge. | 5,000 | Per cubic meter | 88.1 | ₹4,40,500 |
| 2 | Providing and laying reinforced cement concrete 1:1.5:3 ( 1 Cement: 1.5 sand: 3 graded stone aggregate 20mm nominal size compacting the concrete with mechanical mixure and vibrator and curing complete excluding cost of orm work and reinforcement for reinforce concrete work in: including carriage of materials through all modes of transportation with in all leads and lifts and as per HP PWD specification of 1990 volume-1 and as per direction of Engineer in Charges suspended floor roos, landing and sheleves and their supports balconies beams, girders, bressumers and contilever in super structure for all floor and all level | 2 | Per cubic meter | 4,340.5 | ₹8,681 |
| 3 | Maintenance of km stone maintenance of Km stone by way of refting of tiled stones repairing with cement mortar cleaning repairing and lettering on 200 mtr. km stone and 5th km stone as pe drawing including all leads and lifts and as per HP PWD specification of 1990 volume-1 and as per direction of Engineer in Charges | 7 | Per cubic meter | 853.8 | ₹5,976.6 |
| 4 | Maintenance of gravel road including making up the loss of profile rectifying corrugated surface filling up of depressions pot holes and eroison gulles by adding fresh material and compacting it with appropriate equipmment or to strip excess of material from the road surface as per drawing and technical specification clauses 1905 | 600 | Per cubic meter | 172.25 | ₹1,03,350 |
| 5 | Maintenance of Earthen Shoulder (Stripping of excess soil) stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawing and Technical Specification clause 1915 including hauling hauling of matrial through all modes of transportion with in all leads and lifts as per entire satisfactions and direction of the Engineer- in- Charge. | 8,100 | Per cubic meter | 19.8 | ₹1,60,380 |
| 6 | White washing two coats in parapet walls, white pati on hill side rock and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications clause 1915 including carriage of material within all leads and lifts and as per HPPW Specification of 1990 volume-I and as per direction of Engineer-in-Charge. | 1,215 | Each | 40.71 | ₹49,462.65 |
| 7 | Clearing Jungle including uprooting of rank vegitarian grass brush wood trees and saplings of girthupto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. including carriage of material within all leads and lifts and as per HPPW Specification of 1990 volume-I and as per direction of Engineer-in-Charge. | 16,200 | Per cubic meter | 7.2 | ₹1,16,640 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
SBD.pdf
Tender Documents • 2.72 MB
BOQ_206224.xls
BOQ • 12.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .