Loading…
Loading…
Tender Value
₹22.7 L
EMD Value
₹46,000
Closing Date
27 Aug 2026, 5:00 pm2d left
BHUPENDER SINGH
DIV 1 Hissar
Rough cost estimate for providing and laying of 150mm Rising main and construction of Temporary disposal in LPMT Bhiwani and laying of Sewerage line in SPMT Bhiwani
2026_HBC_542732_1
2026E6CDDC60 13DF 49F8 BB57 313ABB2ACCB8259HSV
Open Tender
Civil Works
Works
120 days
Bhiwani
Providing and laying of 200mm SW pipe and 150mm dia DI pipe with specials including construction of manholes, sumpwell and chamber room, providing, fixing and installation of 2 Nos. 5 HP 700 LPM submersible motor pumping set non clog for sewerage hav
2 documents required · 2 mandatory
₹250
Yes
₹46,000
Yes
21 Aug 2026
21 Aug 2026
28 Aug 2026
21 Aug 2026
27 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.1.1.1]Providing and laying of base course of floors consisting of 100 mm thick cement 1:8:16 and 100 mm sand or stone filling. 1.1. Re-compacting excavated soil in plinth under floors, including watering, ramming, consolidating and dressing complete. [Through Rate] | 5 | cum | 73 | ₹365 |
| 2 | [10.10.1]Providing and laying Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 1. 40 mm thick with 20 mm nominal size stone aggregate [Through Rate] | 5 | Sqm | 268 | ₹1,340 |
| 3 | [11.5.1]12 mm cement plaster of mix : 1. 1:2 (1 cement: 2 fine sand) [Through Rate] | 247.8 | Sqm | 139 | ₹34,444.2 |
| 4 | [11.5.4]12 mm cement plaster of mix : 4. 1:6 (1 cement: 6 fine sand) [Through Rate] | 25 | Sqm | 104 | ₹2,600 |
| 5 | [11.6.2]15 mm cement plaster on the rough side of single or half brick wall of mix : 2. 1:6 (1 cement: 6 fine sand) [Through Rate] | 20 | Sqm | 127 | ₹2,540 |
| 6 | [11.61.1]White washing with lime to give an even shade : 1. New work (three or more coats) [Through Rate] | 45 | Sqm | 13 | ₹585 |
| 7 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 300 | Kg. | 83 | ₹24,900 |
| 8 | [13.6.1]Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. 1. Using M.S. angels 40x40x6 mm for diagonal braces [Through Rate] | 2 | Sqm | 2,738 | ₹5,476 |
| 9 | [15.1.2.1]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications
Ordinary soil 2.1. Mechanical Means
Depth up to 3 m [Through Rate] | 387 | cum | 79 | ₹30,573 |
| 10 | [20.10.3]Extra for fixing sluice valves/flap valves socketed or flanged including cartage from stores or nearest Railway Station to site of works 3. 150 mm i/d [Through Rate] | 1 | Each | 5,818 | ₹5,818 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_622227.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].