| 1 | L1₹5.9 CrAccepted-AOC | ₹5.9 Cr Quoted ₹6.0 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹6.2 Cr+₹16.5 L (2.73%)Rejected-AOC UNIT NO 17 GROUND FLOOR RECTANGLE 1 DISTRICT CENTRE SAKET NEW DELHI 110017 | NEW DELHI | SOUTH DELHI | DELHI | 110017 | ₹6.2 Cr+₹16.5 L (2.73%) | L2 | Rejected-AOC Rejected |
Tender Value
₹5.9 Cr
EMD Value
₹11.8 L
Closing Date
19 Jan 2024, 3:00 pmClosed
AMIT KUMAR SANDILA
EE PHE Division No. 3 Palwal
Rough cost estimate for strengthening of existing 600 mm i/d RCC Pipe Sewer line by providing CIPP technology from Sohna road near the house of Sanjay Parshad to Bhawankund via Jaindipura in Palwal town. Distt Palwal.
2024_HRY_341993_1
202487705FAF F013 4CA5 B46B F35C8EE55BEE561PUH
Open Tender
Civil Works
Works
180 days
Palwal
Refer to Tender Document
3 documents required · 3 mandatory
₹20,000
₹11.8 L
Yes
14 Mar 2024
5 Jan 2024
19 Jan 2024
5 Jan 2024
19 Jan 2024
5 Jan 2024
Amount
(A) Desilting of existing sewer by installation of adequate number of over – pumping system, prov. and laying temporary rising main from upstream sides of working length for the smooth flow/ bye-pass of the sewerage system to avoid flood in the adjoining area, desilting of sewer line with mechanical device like Super Sucker Machine, taking out rubbish debris, silt etc. including leak proof stacking arrangement as per technical specification and its safe disposal with in municipal limits as directed by the Engineerin Charge. Scope of work includes supply of all material, labour, tools and plants, making diversion of traffic during execution, repair/ renovation of existing sewer manhole, repair of existing damaged sewer line, temporary power connection with stand by generator set of sufficient capacity, Gas Detector, Forced Air Ventilators etc. and provision of safety equipments as guidelines laid in IS -11972 (1987)/ international standards, Traffic Control Arrangements and proper lighting at night, barricading, display of sign boards, insurance of work men, cleaning of site, disposal of surplus earth/ Malba as directed by Engineer-in-Charge, Removal of all hindrances/ obstructions and other unforeseen items. (B) Designing, manufacture of suitable type of liner (CIPP liner) and its installation, dewatering , washing with clear water/ suitable chemical, preparation of surface including dismantling of plaster wherever required, repair of brick work including stabilizations of earth near alignment of existing sewer where repairing work to be carried out as required as per site condition wherever necessary as per standard specification. Maintenance of proper gradient, grouting with adequate pressure including raising / constructing Manholes alongwith PVC footrest as per relevant ISI Specification inclusive of supply of material, labour, tools and plants and after completion f repair/ strengthening of existing sewer line, the inspection should be carried out through CCTV ( Camera) by the agency to the satisfaction of Engineer-incharge. (a) 500 mm i/d RCC pipe sewer from Committee Chowk to Patli Gate in Palwal town...
(A) Desilting of existing sewer by installation of adequate number of over – pumping system, prov. and laying temporary rising main from upstream sides of working length for the smooth flow/ bye-pass of the sewerage system to avoid flood in the adjoining area, desilting of sewer line with mechanical device like Super Sucker Machine, taking out rubbish debris, silt etc. including leak proof stacking arrangement as per technical specification and its safe disposal with in municipal limits as directed by the Engineerin Charge. Scope of work includes supply of all material, labour, tools and plants, making diversion of traffic during execution, repair/ renovation of existing sewer manhole, repair of existing damaged sewer line, temporary power connection with stand by generator set of sufficient capacity, Gas Detector, Forced Air Ventilators etc. and provision of safety equipments as guidelines laid in IS -11972 (1987)/ international standards, Traffic Control Arrangements and proper lighting at night, barricading, display of sign boards, insurance of work men, cleaning of site, disposal of surplus earth/ Malba as directed by Engineer-in-Charge, Removal of all hindrances/ obstructions and other unforeseen items. (B) Designing, manufacture of suitable type of liner (CIPP liner) and its installation, dewatering , washing with clear water/ suitable chemical, preparation of surface including dismantling of plaster wherever required, repair of brick work including stabilizations of earth near alignment of existing sewer where repairing work to be carried out as required as per site condition wherever necessary as per standard specification. Maintenance of proper gradient, grouting with adequate pressure including raising / constructing Manholes alongwith PVC footrest as per relevant ISI Specification inclusive of supply of material, labour, tools and plants and after completion f repair/ strengthening of existing sewer line, the inspection should be carried out through CCTV ( Camera) by the agency to the satisfaction of Engineer-in charge. (a) 600 mm i/d RCC pipe sewer from Patli Gate to Sohna road near the house of Sanjay Parshad to Bhawankund via Jaindipura in Palwal town.
V N ENGINEERING COMPANY
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .