| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | ₹2.0 L | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L2₹2.1 L+₹5,923.49 (2.97%)Rejected-Finance 36 1 1 H 2 PULAN KHATIK ROAD KOLKATA 15 KOLKATA KOLKATA 700015 | KOLKATA | WEST BENGAL | 700015 | ₹2.1 L+₹5,923.49 (2.97%) | L2 | Rejected-Finance FINANCIAL BID IS OPENED |
| 3 | L3₹2.2 L+₹19,924.45 (9.99%)Rejected-Finance | ₹2.2 L+₹19,924.45 (9.99%) | L3 | Rejected-Finance FINANCIAL BID IS OPENED |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
30 May 2026, 2:00 pmClosed
EX-ENG-IX
THE KOLKATA MUNICIPAL CORPORATION 11,BELVEDERE ROAD KOLKATA-700027
REMOVAL OF CHOKAGE BY REPAIRING S.W PIPE LINE AND ANCILLARY WORK AT DIFFERENT PLACES IN WARD NO 74
2026_KMC_1025142_2
KMC/IX/074/2025-2026(2ND CALL)
Open Tender
CIVIL WORKS
Percentage
365 days
BR-IX
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹4,000
10 Sept 2026
22 May 2026
2 Jun 2026
22 May 2026
30 May 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(16.)Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(ii) 225 mm | 9.6 | MTR | 528 | ₹5,068.8 |
| 2 | SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(16.)Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(iii) 150 mm | 7.2 | MTR | 334 | ₹2,404.8 |
| 3 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 0.25 | %M3 | 11,927 | ₹2,981.75 |
| 4 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring | 0.12 | %M3 | 19,238 | ₹2,308.56 |
| 5 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1) | 21.16 | SQM | 361 | ₹7,638.76 |
| 6 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (b) 1:4:8 proportion. ( 3rd Corrigenda & addenda dated 04.06.2018) | 3.24 | M3 | 4,566 | ₹14,793.84 |
| 7 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth. ( 3rd Corrigenda & addenda dated 04.06.2018) | 10.34 | M3 | 5,682 | ₹58,750 |
| 8 | BUILDING WORKS(P) SOLING, EDGING AND METALLING??(1)Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction.(e) Soling or dry pavement with one brick-on-edge (thickness 125 mm.) | 3.38 | SQM | 564 | ₹1,906.32 |
| 9 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36...Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%. | 3.38 | SQM | 335 | ₹1,132.3 |
| 10 | ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES (BASED ON PWD SCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDA DT.04.06.2018) | 1.36 | M3 | 6,216 | ₹8,453.76 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
ROAD.pdf
Additional Documents • 2.42 MB
TF_74_187.pdf
Tender Documents • 0.72 MB
BOQ_2519098.xls
BOQ • 0.28 MB
74_186_187.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .