Loading…
Loading…
Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
27 Jun 2026, 5:00 pm4d left
Similar tender results from the same govt authority in the past 3 years.
Chief officer ,Dahanu Municipal Council
Chief officer ,Dahanu Municipal Council, Dist Palghar
Regarding the installation of shafts (Hydraulic Isolation structures) and the installation of manifolds to ensure smooth water supply in the Dahanu Municipal Council limits.
2026_DMA_1309777_1
DMC/2026-27/water/2
Open Tender
Water Equipments/ Meter/ Drilling/ Boring
120 days
Dahanu Municipal Limits
Please refer Tender documents.
7 documents required · 7 mandatory
₹11,800
₹1.9 L
19 Jun 2026
19 Jun 2026
29 Jun 2026
19 Jun 2026
27 Jun 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Part A Hydraulic Isolation Structure (Shaft) At Dahanu Gaon 500 mm dia. Shaft 18 m height with Additional pipe line work 600 Rmt. Length and Road Restoration work 600 Rmt. Length | ||||||
| 1.01 | Clearing grass and removal of rubbish up to a distance of 50 metres out side the periphery of the area .(PWD / SSR / 2022-23 / Page No.23 / I. No. 2.07) | 400 | sqm | 4.2 | ₹1,680 | BI01010001010000000000000515BI0100001113 |
| 1.02 | Excavation for foundation / pipe trenches in Earth, soils of all types, sand, gravel and soft murum, Hard murum and boulders, W.B.M. road of strata, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. ( MJP / SSR / 2023-24 / Page No.37 / I. No. 1 ) | 11.9 | cum | 173.25 | ₹2,061.68 | BI01010001010000000000000515BI0100001118 |
| 1.03 | Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatreing, preparing the bed for foundation and excluding backfilling, etc. complete. ( MJP / SSR / 2023-24 / Page No.37 / I. No. 3 ) | 11.9 | Nos | 221.55 | ₹2,636.45 | BI01010001010000000000000515BI0100001122 |
| 1.04 | Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means. ( MJP / SSR / 2023-24 / Page No.38 / I. No. 7 ) | 49.99 | cum | 1,174.95 | ₹58,735.75 | BI01010001010000000000000515BI0100001113 |
| 1.05 | Providing dry trap/granite/soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264)(MJP/SSR/2023-24/ Secti&PE / Excavation Item No. 18/Page no.41) | 4.8 | cum | 1,381.8 | ₹6,632.64 | BI01010001010000000000000515BI0100001118 |
| 1.06 | Providing and laying in situ Cement Concrete M-15 of trap/granite/quartzite/gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 bags / cum) Spec. No. - Bd E /1 Page No. 287 and B- 7, Page No. 38 MJP/SSR/2023-24/Section G Plain, reinforced and ready mix concrete / Item No.1/ Page no.47 | 3.31 | cum | 6,175.05 | ₹20,439.42 | BI01010001010000000000000515BI0100001122 |
| 1.07 | Providing and laying in situ Cement Concrete of trap/ granite/quartzite / gneiss metal for RCC work in foundation like raft, grillage, strip foundation and footing of RCC columns and steel stanchions including normal dewatering, form work, compaction, finishing and curing, etc. complete. (By weigh batching and mix design for M250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement) MJP/ SSR/ 2023-24 / Section G Plain, reinforced and ready mix concrete/ Item No.2/ Page no.47 | 10.31 | cum | 8,602.65 | ₹88,693.32 | BI01010001010000000000000515BI0100001118 |
| 1.08 | Providing and fixing in position steel bar reinforcement of various diameters for RCC piles, caps, footings, foundations, slabs, beams, columns, canopies, staircases, newels, chajjas, lintels, pardies, copings, fins, arches, etc. as per detailed designs, drawings and schedules; including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required, etc. complete (including cost of binding wire). (Bd-F-17/306) | 0.96 | MT | 90,395.55 | ₹86,779.73 | BI01010001010000000000000515BI0100001118 |
| 1.09 | Providing rough cast cement plaster externally in two coats to concrete, brick or stone masonry surfaces in all positions with base coat of 12 to 15 mm thick in C.M. 1:4 and rough cast treatment 12 mm thick in proportion 1:11/2:3 including scaffolding and fourteen days curing complete.
PWD/SSR 2023-24 Plastering and Pointing Item No. 32.13/ Page No. 212 | 11.86 | sqm | 602.7 | ₹7,148.02 | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
tendershaft.pdf
Tender Documents • 1.02 MB
BOQ_2247055.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid