| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹99.2 LAdmitted-Finance 607 6TH FLOOR PRATEEK CENTRE SANJAY PLACE AGRA 282002 | AGRA | UTTAR PRADESH | 282002 | L1 | Admitted-Finance | |
| 2 | L2₹1.0 Cr+₹1.7 L (1.71%)Admitted-Finance SAI DHAM VICTORIA PARK MEERUT UTTAR PRADESH 250001 | MEERUT | UTTAR PRADESH | 250001 | L2 | Admitted-Finance | |
| 3 | Rejected-Technical CHAMBER NO 1 SHIVALIK TOWER KAUSHAMBI GHAZIABAD SHIVALIK TOWER GHAZIABAD UTTAR PRADESH 201010 | GHAZIABAD | UTTAR PRADESH | 201010 | - | Rejected-Technical document not as per requirement |
| Sl No | Description | Qty | Unit | INVENTIVE SOFTWARE SOLUTIONS PRIVATE LIMITED L1 | Sai Computers Ltd. L2 |
|---|---|---|---|---|---|
| 1.00 | Visit to consumer with acknowledgement | 45,282 | nos | - | - |
| 2.00 | MRI of main meter | 41,911 | nos | - | - |
| 3.00 | MRI of Double Meter | 13,143 | nos | - | - |
| 4.00 | If MRI cannot be done then reading of main meter | 8,500 | nos | - | - |
| 5.00 | If MRI cannot be done then reading of double meter | 4,000 | nos | - | - |
| 6.00 | Bill generation and handing over the printed bills to EE (Dist.) for signature and approval. | 8,500 | nos | - | - |
| 7.00 | Bill distribution with acknowledgement, uploading the bill on consumers' email | 40,000 | nos | - | - |
| 8.00 | Single meter analysis MRI data analysis & submission of detailed report in soft & hard copy for consumers having main meter but no double pole meter. | 20,000 | nos | - | - |
| 9.00 | MRI data analysis & submission of detailed report in soft & hard copy for consumers main meter with double pole meter and substation meter if any(maximum up to four meters). The comparison of the energy & demand of main meter. Double pole meter & substation meter shall be submitted to concerned distribution division and test division. | 13,143 | nos | - | - |
| 10.00Note: Quantity mentioned above are approximate quantities for one month only All statuary taxes and levies will be borne by the bidder except GST which will be reimbursed by MVVNL on production of vouchers for actual payment thereof. Note:- 1. The bidder shall quote the rates for the work mentioned above in the bill of quantity taking penalties incentive/disincentive of payment into account. 2. The rates quoted shall be firm & shall remain firm throughout the currency of the contract. | |||||
Tender Value
₹24.8 Cr
EMD Value
₹30 L
Closing Date
20 Jan 2020, 1:00 pmClosed
Superintending Engineer (Commercial)
Room No. 2(B), 4 A, Gokhale Marg, Lucknow, U.P. -226001
For MRI based billing (From 10 HP/KW/KVA and above) in MVVNL, Lucknow for 6 Distribution Zones (LESA-CIS Gomti, LESA Trans Gomti, Lucknow, Faizabad, Bareilly, Devipatan) for two years.
2020_MVVNL_422612_1
MEDCO/2464/2019
Open Tender
Miscellaneous Works
Fixed-rate
720 days
(LESA-CISGomti, LESA.T/Gomti, LKO, FZD.BLY.Devipatan)
As per tender document
2 documents required · 2 mandatory
₹11,800
EE To MD MVVNL A/c.No.10101985738,IFSC.SBIN0003347
₹30 L
10 Feb 2020
10 Jan 2020
21 Jan 2020
10 Jan 2020
20 Jan 2020
10 Jan 2020
Amount
Visit to consumer with acknowledgement
MRI of main meter
MRI of Double Meter
If MRI cannot be done then reading of main meter
If MRI cannot be done then reading of double meter
Bill generation and handing over the printed bills to EE (Dist.) for signature and approval.
Bill distribution with acknowledgement, uploading the bill on consumers' email
Single meter analysis MRI data analysis & submission of detailed report in soft & hard copy for consumers having main meter but no double pole meter.
MRI data analysis & submission of detailed report in soft & hard copy for consumers main meter with double pole meter and substation meter if any(maximum up to four meters). The comparison of the energy & demand of main meter. Double pole meter & substation meter shall be submitted to concerned distribution division and test division.
Note: Quantity mentioned above are approximate quantities for one month only All statuary taxes and levies will be borne by the bidder except GST which will be reimbursed by MVVNL on production of vouchers for actual payment thereof. Note:- 1. The bidder shall quote the rates for the work mentioned above in the bill of quantity taking penalties incentive/disincentive of payment into account. 2. The rates quoted shall be firm & shall remain firm throughout the currency of the contract.
Sai Computers Ltd.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .