Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
29 Sept 2026, 1:00 pm2d left
EXECUTIVE ENGINEER
IRRIGATION DIVISION FIROZABAD
SILT CLEARANCE/SCRAPPING OF FIROZABAD DY. FROM KM. 43.500 TO KM. 48.880 AND ATIPUR MINOR FROM KM. 0.000 TO KM. 1.760
2026_UPIDC_1188447_7
05/EE/2026-27
Open Tender
Civil Works
Item Wise
20 days
SILT CLEARANCE/SCRAPPING OF FIROZABAD DY. FROM KM.
Please refer Tender documents.
2 documents required · 2 mandatory
₹856
₹6,000
23 Sept 2026
23 Sept 2026
29 Sept 2026
23 Sept 2026
29 Sept 2026
23 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning thick bushes and thorny jungle without uprooting.. | 3,696 | sqm | - | - |
| 2 | Earth work in silt with slush and lehal excluding dewatering of clearance including 1.50m lift and 150 m lead by manual labour or machine. The earth from cutting to be used in making embankement or to be deposited as spoil bank as directed by Engineer-in- charge4. | 1,409.65 | cum | - | - |
| 3 | Scraping internal section of existing channel with silt upto 5 cm complete in all respect as directed by engineer -in-charge. | 5,113.6 | sqm | - | - |
| 4 | VRB or Bridge clearance during silt clearance work complete in all resepct as directed by engineer-in charge. | 6 | nos | - | - |
| 5 | Brick work in 1:4 ( 1 cement :4 sand) mortar upto 3m lift and 60 m lead of material including cost of material, labour and T & P complete in all respect as directed by engineer-in charge | 6.89 | cum | - | - |
| 6 | 12 mm thick cement Plaster with 1:3 Cement, Coarse sand mortar including all cost of labour, material, T & P etc. for porper completion of work. | 48.73 | sqm | - | - |
| 7 | Finishing wall two coats with exterior emulsion paint (apex) of approved brand and manufature of required shade on undecorated wall surface to give even shade @ 1.25 lift/10 sem one coat of primer applied @ 0.75/sqm curing, cost of material, labour T & P etc. Proper completion of work. | 56.31 | sqm | - | - |
| 8 | Painting & Priting of Sign Board including cost of material, labour and T & P etc. complete in all respect as directed by engineer-in charge | 2 | sqm | - | - |
| 9 | Printing of Gauge upto 25 cm witdh including cost of material including cost of material labour and T & P etc complete in all respect as directed by engineer in- charge | 3 | R.M. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.71 MB
BOQ_2239416.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .