| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1ST₹16.5 LAccepted-AOC AT PO SINDURPANK PS SADAR DIST SAMBALPUR PIN 768005 | SAMBALPUR | ODISHA | 768005 | ₹16.5 L | 1ST | Accepted-AOC SUCCESSFUL |
| 2 | Rejected-Technical AT KAINDHARI PO SAHADA DIST BALASORE | - | - | Rejected-Technical UNSUCCESSFUL |
Tender Value
₹16.5 L
EMD Value
₹16,530
Closing Date
18 Dec 2025, 5:00 pmClosed
COMMISSIONER, SMC
SAMBALPUR MUNICIPAL CORPORATION, DURGAPALI, SAMBALPUR, 768006
Development and Maintenance of Pothole-free roads and covered drains in WN-38 Of SMC
2025_ORULB_122591_39
22/SMC_SBP/2025-26
Open Tender
Civil Works - Others
90 days
SAMBALPUR MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹16,530
Yes
6 Jun 2026
9 Dec 2025
19 Dec 2025
9 Dec 2025
18 Dec 2025
9 Dec 2025
Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50M lead.
Earth work in all kinds of soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth & as per direction of the engineer –in –charge
Filling in foundatin and plinth with sand watered and rammed including cost of material with tax
Removal of excavated dismantled materials away from work site by mechanical means within 5km lead including loading unloading etc complete.
Cement concrete (1:3:6) with 4cm. Size crusher broken hard Granite metal including cost of all labour ,materials with all taxes,lead ,T & P etc all complete .
Cement concrete (1:2:4) with 12mm size crusher broken hard granite metal including cost of all labour, materials with all taxes, lead, T & P etc all complete.
R.C.C / Unreinforced C.C work M-20 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete but excluding centring , shuttering cost of st
COVER SLAB
Supplying, fitting, fixing and placing un coated HYSD bar reinforcement in proper position as per design including cutting, bending, binding and tying the grills including cost of steel , binding wire 18 to 20 Gauge and labour required for the work.. assuming steel @0.62 qtl/cum of total RCC qty of slabs
Rigid smooth centring and shuttering for R.C.C. works including false work and dismantling then after casting including cost of materials complete in R.C.C. foundation , plinth band , guard wall of lesser height and footings bases of columns mass conc
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_570302.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_570302.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid