Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | ₹8.4 L Quoted ₹9.9 L | L1 | Accepted-AOC L-1 |
| 2 | L2₹10.0 L+₹8,972.40 (0.91%)Rejected-Finance | ₹10.0 L+₹8,972.40 (0.91%) | L2 | Rejected-Finance L-2 |
| 3 | L3₹10.1 L+₹19,938.66 (2.02%)Rejected-Finance | ₹10.1 L+₹19,938.66 (2.02%) | L3 | Rejected-Finance L-3 |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-incomplete/wrong affidavit |
Tender Value
₹10.0 L
EMD Value
₹99,693
Closing Date
24 Dec 2025, 3:00 pmClosed
CE,KMC
motijheel
Improvement of Drain and Road By C.C From H/O Ramesh Singh to H/o Amit Awasthi At Arra Village in ward-87 Under Zone-03
2025_NNKAN_1099054_1
459/AA-2/25-26
Open Tender
Civil Works
Fixed-rate
45 days
Zone-02
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹99,693
22 Aug 2026
15 Dec 2025
24 Dec 2025
15 Dec 2025
24 Dec 2025
15 Dec 2025
E/W Cutting and Filling or ion embankment in ordinary soil exavation to be done pits not exciding 1.5 m including all completion of work.
Earth work in Excavation in trenches for foundation pipes cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in-charge with in a distance of 50 mtr.
Providing and Laying Cement Concrete(1:6:12,1 cement:6 fine sand:12 Brick ballast nominal size 40mm) and curing complete,including cost of formwork in foundation and floors.
Class-150 Brick workin (1:4) cement mortar in Foundation & Plinth including supply of all Materials Labour and Tool & Plants etc, required for proper completion of the work
12mm thick Cement plaster 1;4 in single coat on both side of single or half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not exceeding 80mm in girth and finishied even and smooth.
RCC Work with Cement Concrete 1:1.5:3, 1 Cement:1.5 Coarse Sand:3 Stone Agregate inculding all completion of work.
Mild Steel or Iron in Reinforcement including all completion of work
Supply and Laying GSB including all completion of work.
Providing and Laying 125 micron polythen sheet including all labour work.
Providing and Laying Pre moulded joints filler 12mm thick for expention including all labour work.
Providing & Laying Cement Concrete M-25 grade 1:2:4 1 Cement:2 Coarse sand:4 Stone Agregate including all completion of work.
Making of pedastal including all labour work.
Cartage of Earth up to 3Km including all completion of work.
Add 18% G.S.T
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.42 MB
BOQ_2024500.xls
BOQ • 0.28 MB
100stamp.pdf
Tender Documents • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .