Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹7,100
Closing Date
26 Feb 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE VGTPS
VGTPS, Ramanathapuram - 623536
Periodical and breakdown maintenance of 2Nos.IA/PA Compressors
2021_EB_195547_1
SE/VGTPS/RMD/WC.NO.173/20-21
Open Tender
Miscellaneous Works
Works
180 days
VGTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,100
Yes
1 Mar 2021
12 Feb 2021
1 Mar 2021
12 Feb 2021
26 Feb 2021
12 Feb 2021
180 days
Amount
A. Periodical maintenance(IA/PA) Compressors, ACC, CCCW System
Instrument Air Compressor System: Charges for Periodical inspection of Instrument Air Compressor systems and its drier units, IA/PA Cooling water system, associated pipe lines, valves etc., for attending air/water/oil leaks, maintaining lube oil level of IA/PA Compressors and its cooling water pumps, topping up if necessary, lubricating of hand operated valves, external cleaning of related equipments and its auxiliaries and keeping clean and tidy and attending any minor defects as per the direction of Engineer - in -charge.
Process Air & Nitrogen generation System: Charges for Periodical inspection of Process Air system, Nitrogen generation system, Nitrogen storage tank , Inspection &associated pipe lines, valves etc., attending gas leaks, maintaining Carbon molecular sieves level of PSA system, topped up if necessary, external cleaning of related equipments and its auxiliaries and keeping clean & tidy and attending any minor defects as per the direction of Engineer in-charge.
Closed Circuit Cooling Water System (CCCW): Charges for Periodical inspection of Closed Cooling Water Pumps (CCCW) for any abnormal sound, temperature, and mechanical seal/Gland leaks, Gland rope packing, Gland Plate Changing, any water leaks in the pipe lines, attending valve leaks, Expansion rubber bellow leak, vibration of piping and general checks and CCCW PUMP & Motor Coupling fasteners inspection, Checking the expansion tank DM water level, cleaning and attending minor defects and visual inspection of Radiator Cooler (RC) Fan for any abnormal Sound, Vibration, belt visual inspection, Fins Visual inspection, RC Fan guard fasteners visual inspection, Grease Packing of RC Fan shaft bearings as required. RC Fan leaf & Bottom supporting plates Cleaning as per the direction of Engineerin-Charge.
Air Cooled Condenser (ACC) system: Charges for Periodical inspection of Air-Cooled Condenser system, including ACC Fans, ACC Gear Boxes, ACC Heat Exchanger Bundles etc., observation for any abnormal sound, temperature, vibration, leaks etc., in the above system, external cleaning of ACC Gear Boxes etc., attending leaks and minor defects in the above system, checking the oil level in all ACC gear boxes and topped up if necessary as per the direction of Engineer in-charge.
Air Cooled Condenser Fin Tubes : Charges for Periodical inspection & to carry out the following preventive maintenance of ACC fin tube bundles & fin cleaning as per the direction of Engineerin-charge. 1. The tube radiator fins of ACC bundles must be kept free of bugs, links and other debris. 2. Periodical cleaning of the ACC cooling bundles with service water using fin tube cleaning pump.
B. Breakdown maintenance of (IA/PA) Compressors, ACC, CCCW System
Inter Cooler / After Cooler (IA/PA) : Disassembly of IA/PA Compressor Inter cooler/After cooler and taking out tube nest from the shell, inspection, cleaning, leak checking by hydraulic testing, renewal of O rings, gaskets,(O rings, gasket etc., all be provided by the TANGEDCO) reassembling and normalizing as per the direction of Engineerin-charge.
IA/PA Compressor Belt changing: Removal of IA/PA Compressor Belt, replacing new belt (belt will be supplied by the TANGEDCO)if necessary, checking alignment and normalizing as per the direction of Engineer in - charge
Oil Replacement work (IA/PA) : Draining of oil from the oil sump of IA / PA Compressor, inspection, cleaning of the sump and filter element, replacing of filter element if necessary (oil filter will be provided by the TANGEDCO) filling with lube oil and normalizing as per the direction of Engineer in - charge.
IA/PA compressor Suction Air filter cleaning work : Disassembly of suction air filter of IA/PA Compressor, disassembly of suction pipe line from LP cylinder, inspection, thorough cleaning of suction air filter and suction pipe line, replacement of suction filter (suction filter will be supplied by the TANGEDCO) if necessary, reassembling and normalizing as per the direction of Engineer in-charge.
IA/PA LP & HP side water jacket cleaning work: Disassembly of LP and HP water jacket inspection covers of IA/PA Compressor, cleaning the water jacket, renewal of gasket packing, reassembling and normalizing as per the direction ofEngineer in - charge
IA/PA Suction & Discharge valve work : Disassembly of suction side and discharge side valve covers, valve plates of LP and HP cylinder of IA/PA Compressor, inspection, cleaning, Renewal / Rectification of valve plates assembly, re-assembly and normalizing as per the direction of Engineer in - charge.
IA/PA Compressors Emergency Breakdown work:Emergency Breakdown maintenance of IA/PA Reciprocating compressors - 2 stage Horizontal KIRLOSKAR PNEUMATIC CO.LTD.Model: T-BTD-LM( 255mm&160mm, FAD 8.87 m3/min) comprising of disassembly of LP&HP internals such as cylinder suction & discharge valve plates assembly, piston rod, piston rings, wearing rings inspection, cleaning, rectification/replacement of spares if necessary (O rings, gaskets & spares will be supplied by the TANGEDCO) and normalizing as per the direction of Engineer in - charge
Cooling water pump of IA/PA system: Disassembly of cooling water pump for ( Make:MatherPlant Pumps Ltd., Q = 20 m3/hr) IA/PA Compressor system, inspection of internal parts, cleaning, rectification / renewal of parts, re-assembly (gaskets, spares will be supplied by the TANGEDCO), normalizing as per the direction of Engineerin - charge
IA/PA Cooling Tower: Inspection of IA/PA cooling tower fans, Strainer, cleaning the towers, basin and its valves and normalizing as per the direction of Engineer in - charge.
IA/PA LP & HP side renewal of piston rings & clearance checking work : Disassembly of HP or LP cylinder outer cover and removal of piston and pressure packing rings cleaning and renewal of pressure packing rings, assembling piston, adjusting the piston clearances, assembling the cylinder outer cover, normalizing as per the direction of Engineer in - charge.
IA/PA Lube Oil Tank Cleaning & Gear pump Inspection work: Disassembly of lube oil gear pump, inspection cleaning, renewal of spares if necessary reassembling and normalizing as per the direction of Engineer - in - charge.
IA/PA NRV servicing work : Disassembly of 100NB NRV in the discharge air line of the compressor, Inspection, cleaning, lapping and blue matching, reassembling and normalizing as per the direction of Engineer in-charge.
Air Dryer Unit (IA/PA): Disassembly of Inspection cover of Instrument Air dryer unit desiccant tower, removal of desiccant, cleaning of internals, refilling of new desiccant and closing of inspection cover, disassemblyof prefilter and after filter, inspection, cleaning, assembly of filters supplied by TANGEDCO, disassembly and cleaning of purge control valve and change over valve and normalizing the operation of Instrument Air dryer unit as per the direction of Engineer in-charge.
Breakdown maintenance work of PSA system : Disassembly of inspection cover for Process Air Nitrogen gas unit Carbon molecular sieves tower, removal of Carbon molecular sieves, cleaning of internals, refilling of new Carbon molecular sieves and closing of inspection cover, disassembly of prefilter, inspection, cleaning, assembly of filters supplied by TANGEDCO, disassembly and cleaning of Pressure control valve and change over valve and normalizing the operation of Process Air Nitrogen gas unit as per the direction of Engineer in-charge.
CCCW System / Various Valves / Bellow Work/Motor Alignment work: 400 NB New Butterfly valve, 400 NB New Return Valves Replacement work/attending any other unforeseen minor defects related to mechanical maintenance work (or) replacing old 400 NB Expansion Rubber bellows (or) de-coupling and coupling of motor incase of failure to co-ordinate electrical maintenance work, Alignment checking and coupling with the motor, completion and normalizing as per the direction of Engineer in-charge.
RC Fan Driven Motor Work: Motor and Fan Alignment checking at the time of Electrical motor replacement or attending any unforeseen minor defects related to mechanical maintenance work and normalizing as per the direction of Engineer in - charge.
ACC Gear Box and motor pulley coupling & decoupling work : Removing ACC Gear Box and motor pulley from the motor shaft and inspection of the pulley bolt with Bushes and replacing the damaged Bushes by new bushes and inserting the coupling with bolt, coupling with motor and normalizing as per the direction of Engineer in - charge.
ACC Fans break down maintenance work : Dismantling the ACC fan after disconnecting from the motor, checking the gear box bearings, oil seals and inspection of gears and replace the failed bearings by new ones as required, which will be supplied by the TANGEDCO, reassembled the fan, alignment checking and coupling with the motor all complete as per the direction of Engineer in - charge.
ACC fin tube cleaning pump emergency breakdown: Dismantling the ACC fin tube cleaning pump(Make:KSB Pumps Ltd., Q = 6 m3/hr) into its parts. Cleaning of the parts, replace the failed Bearing, Mechanical Seals, Gland packing etc., If require reassembling alignment checking and coupling as per the direction of Engineer in–charge.
Rc Fan Driven End / Non Driven End Bearing Break Down Work : 1) Removing Fly Wheel Guard & Decouple the gear teeth Belt from Motor Pulley. 2)Disassemble the Fly wheel, Fan Shaft, Top & Bottom Bearing,Oil seal, Circlip, Fan Leaf Bush, Fan Leaf Hub, etc., 3) Replacing DE/NDE Bearings, Oil seal, Circlip, Greasing for bearing. 4) Assemble all parts, Alignment Checking between motor and Fan pulley and Normalizing the System. , etc., as per the direction Engineerin-charge.
Minor welding works : Charges for attending any minor weld defects in lube oil, air and water lines and support structures by welding as per the direction of Engineer in-charge.
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .