| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹85.7 LAccepted-AOC | L1 | Accepted-AOC L1 Tenderer | |
| 2 | L2₹90.4 L+₹4.6 L (5.42%)Rejected-Finance | L2 | Rejected-Finance L2 Tenderer |
Tender Value
₹89.8 L
EMD Value
₹90,000
Closing Date
3 May 2023, 3:00 pmClosed
The Project Director DRDA Chengalpattu
O/o The Project Director DRDA Chengalpattu
Strengthening of 2 Rural Roads in Kalvoy and Karanai Puduchery Village Panchayats in Kattankolathur Block of Chengalpattu District Having PKG No.07
2023_RDTN_302099_1
Rc.No.1380.2023.A9 Dated 05.04.2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Kattankolathur Block
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹90,000
O/o The Project Director DRDA Chengalpattu
22 Jun 2023
13 Apr 2023
3 May 2023
13 Apr 2023
3 May 2023
13 Apr 2023
21 Apr 2023
Amount
Part I :Strengthening of Melkalvoy Road (Km 0/0 to 0/800 ) Estimate Amount : 42.37 Lakhs, Maintenance Cost : 2.880 Lakhs
Picking the Existing BT Surface including all labour charges etc.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers 125
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion/10sqm including labour for spraying, hire charges for bitumen sprayer etc., complete
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Bituminous macadam 50 mm consolidated thickness using bitumen 60/70 grade as per clause 504 of MoRTH specification
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Filling gravel for shoulders and berms including cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete.
Supplying and fixing of HM stone of size 0.75x0.23x0.10 m including cost and conveyance and all other labour charges etc., complete
90 cm Equilateral triangle cautionary signboard
60 cm Equilateral triangle cautionary signboard
60 cm Circle(MANDATORY SIGN)
Chevron signs 90cm octogon(Curves)
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
Part II :Strengthening of Urapakkam Nallambakkam Road to Gokulam Colony Extension (Km 0/0 to 0/820 ) Estimate Amount : 41.60 Lakhs, Maintenance Cost : 2.952 Lakhs
Picking the Existing BT Surface including all labour charges etc.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers 125
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion/10sqm including labour for spraying, hire charges for bitumen sprayer etc., complete-
Providing and laying tack coat over BT surface using 2.5 kgs. of emusion for 10 sqm.area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by bitumen sprayer etc., complete as per clause 503 of MOST specification
Providing and laying Bituminious concrete 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., including using shredded plastic wastes at 8% of the weight of bitumen used complete as per specification using CMP as per clauses 507 of MORTH Part-5
Filling gravel for shoulders and berms including cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete.
Supplying and fixing of HM stone of size 0.75x0.23x0.10 m including cost and conveyance and all other labour charges etc., complete
90 cm Equilateral triangle cautionary signboard
a. 60 cm Equilateral triangle cautionary signboard
b. 60 cm Circle(MANDATORY SIGN)
Construction of 1.5m span slab culvert @ Km 0/320
Earth work Excavation and foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the size of foundation.
Supplying and filling with M. sand layers of 15cm thick including watering, raming consolidation ets., for foundation
Cement concrete 1:4:8 mix using 20mm HBG metal for foundation including watering whereever necessary and laid in layers of not more than 15cm thick, compacting etc., complete compyling with standard specification and as directed
Cement concrete 1:3:6 mix using 40mm HBG metal for foundation including watering whereever necessary and laid in layers of not more than 15cm thick, compacting etc., complete compyling with standard specification and as directed
Supply and erecting centering shuttering including necessary support for plain surface in foundation and basebent and in all floors for RCC column footing, column plinth beem, beems, roof slabs, stair case steps, bedblocks, critical pier etc., using mild steel sheets of size 90x60cm and 10 gage stiff and melded with MS angles of size 25x3mm car boarding laid over silver oak scantlings of size 10cm by 6.5cm spaced of about 90cm c/cand supported by casurina props of 10cm to 13cm dia space at 75 cm C/C completed compyling with standard specification ans as directed by departmental offices etc. completed
Upto ground level
Above ground level
Supply and fabricating and placing position MS steel for all RCC works as per the design given including cost of steel and biniding wires in all floors etc., complete compiling with standard specification
Cement concrete 1:2:4 mix using 20mm HBG metal for foundation including watering whereever necessary and laid in layers of not more than 15cm thick, compacting etc., complete compyling with standard specification and as directed
Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal for all RCC items of works excluding cost of reinforcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cm 1:3,12mm thick as directed by the departmental officers complete compyling withfoundation including watering whereever necessary and laid in layers of not more than 15cm thick, compacting etc., complete compyling with standard specification and as directed
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
A.AKBAR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .