| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹29.3 L+₹1.9 L (6.77%)Admitted-Finance 60 MADHUVAN BANK COLONY ALWAR | L2 | Admitted-Finance | |
| 3 | L3₹30.3 L+₹2.8 L (10.4%)Admitted-Finance A 46 ARYA NAGAR ALWAR RAJ 301001 | ALWAR | RAJASTHAN | 301001 | L3 | Admitted-Finance | |
| 4 | L4₹30.9 L+₹3.5 L (12.7%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | shiva construction L4 | M/S JINDAL ENTERPRISES L2 | M/s ASK Enterprises L3 | AARSINFRATECH L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brick/stone masonry built in cement/lime mortar of any mix including all quoins pillar ashlars masonry and removal complete all as specified & directed by Engr-in-Charge. | 3.5 | Cum | 200 ₹700 | 140 ₹490 | 300 ₹1,050 | 111 ₹388.5 Lowest |
| 2.00 | Demolition of cement concrete (un-renforced) in ground floor and paving. Exc n' 15 cm thickness (below or above ground level.) & removal of rubbish material complete all as specified & directed by Engr-in-Charge. | 10 | Cum | 200 ₹2,000 | 140 ₹1,400 Lowest | 300 ₹3,000 | 147 ₹1,470 |
| 3.00 | Dismantling of stone slab and tiles of any description or thickness in floors, aprons etc laid, beded and pointed in any mortar including removing the dismantled material complete all as specified and as directed. | 2.1 | 10 sqm | 200 ₹420 | 500 ₹1,050 | 50 ₹105 Lowest | 246 ₹516.6 |
| 4.00 | Taking down Chowkatts or frames with shutters ( without taking off shutters from the frame exc 1.5 sq. m but n exc 4 sq m each & removing to store complete all as specified & directed. | 14 | Each | 50 ₹700 Lowest | 50 ₹700 Lowest | 100 ₹1,400 | 57 ₹798 |
| 5.00 | Taking down Chowkatts or frames with shutters (without taking off shutters from the frame n. exc 1.5 sq. m each & removing to store complete all as specified & directed. | 18 | Each | 50 ₹900 Lowest | 50 ₹900 Lowest | 100 ₹1,800 | 57 ₹1,026 |
| 6.00 | Dismantling floor hearth or wall tiling including cement mortar bedding but not backing removing serviceable tiles to store and rubbish of the premises complete all as specified & directed. | 87.5 | Sqm | 20 ₹1,750 | 35 ₹3,062.5 | 15 ₹1,312.5 Lowest | 25 ₹2,187.5 |
| 7.00 | Taking down cement plaster any description on brick or stone any description complete all as specified & directed by Engr-in-Charge. | 295 | Sqm | 15 ₹4,425 Lowest | 15 ₹4,425 Lowest | 15 ₹4,425 Lowest | 21 ₹6,195 |
| 8.00 | Taking up or down 15mm steel tubing and connections, complete all as specified & directed by Engr-in-Charge. | 63 | RM | 15 ₹945 | 15 ₹945 | 15 ₹945 | 7 ₹441 Lowest |
| 9.00 | Taking up or down 20mm steel tubing and connections, complete all as specified & directed by Engr-in-Charge. | 45 | RM | 20 ₹900 | 15 ₹675 | 20 ₹900 | 7 ₹315 Lowest |
| 10.00 | Dismantling/demolition water tanks of capacity exc 250ltr but not exc 500ltr and removing from site complete all as specified & directed by Engr-in-Charge. | 2 | Each | 100 ₹200 Lowest | 250 ₹500 | 100 ₹200 Lowest | 111 ₹222 |
Tender Value
₹32.5 L
EMD Value
₹65,000
Closing Date
7 Aug 2026, 6:00 pmClosed
GE Alwar
Alwar
SPL REPAIR TO BLDG NO P-335/01 TO 02 (JCO MD ACCN) OF STN HQ, PROVN OF LAUNGEWALA BP 638 SMARAK AND PROVN OF TOILET BLOCK ALONGWITH SEPTIC TANK AND SOAKAGE WELL NEAR BLDG NO P-1811 (MATASYA AUDITORIUM) AT MIL STN, ALWAR
2026_MES_769104_2
8521/E8
Open Tender
Civil Works
Item Rate
180 days
Alwar
As per NIT
6 documents required · 6 mandatory
₹500
GE Alwar
₹65,000
Yes
17 Aug 2026
16 Jul 2026
14 Aug 2026
16 Jul 2026
7 Aug 2026
24 Jul 2026
16 Jul 2026 - 23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of brick/stone masonry built in cement/lime mortar of any mix including all quoins pillar ashlars masonry and removal complete all as specified & directed by Engr-in-Charge. | 3.5 | Cum | 1.25 | ₹4.38 |
| 2 | Demolition of cement concrete (un-renforced) in ground floor and paving. Exc n' 15 cm thickness (below or above ground level.) & removal of rubbish material complete all as specified & directed by Engr-in-Charge. | 10 | Cum | 100 | ₹1,000 |
| 3 | Dismantling of stone slab and tiles of any description or thickness in floors, aprons etc laid, beded and pointed in any mortar including removing the dismantled material complete all as specified and as directed. | 2.1 | 10 sqm | 53 | ₹111.3 |
| 4 | Taking down Chowkatts or frames with shutters ( without taking off shutters from the frame exc 1.5 sq. m but n exc 4 sq m each & removing to store complete all as specified & directed. | 14 | Each | 10 | ₹140 |
| 5 | Taking down Chowkatts or frames with shutters (without taking off shutters from the frame n. exc 1.5 sq. m each & removing to store complete all as specified & directed. | 18 | Each | 11 | ₹198 |
| 6 | Dismantling floor hearth or wall tiling including cement mortar bedding but not backing removing serviceable tiles to store and rubbish of the premises complete all as specified & directed. | 87.5 | Sqm | 1.25 | ₹109.38 |
| 7 | Taking down cement plaster any description on brick or stone any description complete all as specified & directed by Engr-in-Charge. | 295 | Sqm | - | - |
| 8 | Taking up or down 15mm steel tubing and connections, complete all as specified & directed by Engr-in-Charge. | 63 | RM | - | - |
| 9 | Taking up or down 20mm steel tubing and connections, complete all as specified & directed by Engr-in-Charge. | 45 | RM | 100 | ₹4,500 |
| 10 | Dismantling/demolition water tanks of capacity exc 250ltr but not exc 500ltr and removing from site complete all as specified & directed by Engr-in-Charge. | 2 | Each | 100 | ₹200 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_872661.xls
BOQ • 5.77 MB
Tender8521.pdf
Tender Documents • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .