Loading…
Loading…
Tender Value
₹23.7 L
EMD Value
₹23,700
Closing Date
22 Oct 2026, 5:00 pm
Executive Officer,Baripada Municipality
Executive Officer,Baripada Municipality
Construction of Kitchen-cum-Ananda Bazar for Lord Jagannath temple at Baripada.
2026_ORULB_142702_4
BPDM 9 of 2026-2027
Open Tender
Civil Works - Others
Percentage
180 days
Baripada Municipality
As per DTCN
3 documents required · 3 mandatory
₹6,000
₹23,700
Yes
7 Oct 2026
7 Oct 2026
23 Oct 2026
7 Oct 2026
22 Oct 2026
7 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1KITCHEN | |||||
| 1.01 | Dismantling brick or stone masonry in lime or cement mortar above 3m. height incl.stacking the useful materials for reuse & removing the debris within 50m. Lead etc. complete. | 20.69 | Cum | 1,743.48 | ₹36,072.6 |
| 1.02 | Dismantling & removing cement concrete including stacking the debris within intial lead and lift 50mtr lead (Unit-1 cum) | 29.21 | Cum | 877.16 | ₹25,621.84 |
| 1.03 | Dismantling & removing cement concrete including stacking the debris within intial lead and lift 50mtr lead (Unit-1 cum) | 9.22 | Cum | 877.16 | ₹8,087.42 |
| 1.04 | Earth work in excavation of foundation trenches in hard soil including dressing and levelling the bed upto the required depth and depositing the excaveted materials with all leads & lifts T&P shoring and shuttering watering if necessary etc. complete as per directed by the Engineer-in-charge | 64.94 | Cum | 282.89 | ₹18,370.88 |
| 1.05 | Filling foundation trenches with excavated earth including watering ramming and compacting in layer not exceeding 150 mm thick including labour sundries T & P etc complete and as per direction of Engineer-in- charge | 43.29 | Cum | 197.81 | ₹8,563.19 |
| 1.06 | Supplying & filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyance, royalties, taxes of all materials and cost of all labour with T&P, sundries required for the work etc., complete (Measurement will be taken on finished compacted section) as per specification and diregtion of Engineer-in-charge. | 29.08 | Cum | 601.27 | ₹17,484.93 |
| 1.07 | Cement concrete(1:3:6 ) using 40 mm size B.H.G C.B chips laying in layers niot exceeding 150mm ramming in rammer,watering and curing etc. | 8.59 | Cum | 7,003.54 | ₹60,160.41 |
| 1.08 | Fly-Ash Brick masonary with c.m (1:6) in foundation and Plinth using Fly-Ash Bricks 250 x 120 x 80mm size watering ,curing etc complete including cost of materials, labour all comp.complete as per the direction of Engineer-In-Charge | 3.49 | Cum | 6,001.56 | ₹20,945.44 |
| 1.09 | Providing, lifting, hoisting and laying Reinforced Concrete of M-25 grade in Column base, Column Footings, Raft Foundation,Stem of the Columns, beams, chaujja, fin, lintel, stair Case, jali , shelves and slab etc as per approved designs and drawings having a minimum Compressive strength ( in work test) 20N. / Square mm. in 15cm. cubes at 28 days after mixing and test conducted in accordance with 1.S. 456 and 1.S. 516 using screened & washed sharp river sand far mertar and 18mm. to 20 mm. size black hand crusher broken granite stone chips of Spproved quality from approved quarry, washed and cleaned to be mixed in concrete mixture with approved quality of cement Including hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after {dismantfing and removing the debrises away from the work site and finishing the exposed ~ fSurface -smooth. providing grooves-or beads: wherever necessary. including: cost, conveyance, loading, unloading, royalties and taxes of all materials , cost of all labours, scaffolding, sundries,T&P required for the work etc. Complete in all respect but the excluding cost & conveyance of M.S. rods or Tor Stee! and Binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or Tor steel and binding wires and tying the grills and placing in. proper position as directed by the Engineer-in-charge. Footing | 6.62 | Cum | 7,871.1 | ₹52,106.68 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 18.19 MB
BOQ_612598.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .