| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1 Rank₹2.7 LAccepted-AOC | 1 Rank | Accepted-AOC L1 | |
| 2 | 2 Rank₹2.9 L+₹19,296 (7.13%)Rejected-AOC | 2 Rank | Rejected-AOC L2 | |
| 3 | 3 Rank₹3.4 L+₹65,110 (24.1%)Rejected-AOC | 3 Rank | Rejected-AOC L3 | |
| 4 | 4 Rank₹3.4 L+₹69,010 (25.5%)Rejected-AOC | 4 Rank | Rejected-AOC L4 |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
30 Dec 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle-I, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj
69-ETC-I(A)/ 2020-2021
2020_UPTCL_540319_1
69-ETC-I(A)/ 2020-2021
Open Tender
Electrical Works
Item Rate
60 days
Malwan
Please refer Tender documents.
2 documents required · 2 mandatory
₹472
SE,ETC,PRAYAGRAJ
₹4,000
3 Sept 2021
24 Dec 2020
31 Dec 2020
24 Dec 2020
30 Dec 2020
24 Dec 2020
120 days
Amount
Following works is to be carried out for replacement of complete gasket including other associated work in 40 MVA T/F-III (Alstom Make) installed at 132 KV Substation Malwan under Electy. Trans. Division-Fatehpur
Dismantling of accessories of 40 MVA Transformer-III at 132 KV Substation Malwan including radiator, bushing, buchhoiz relay, oil pipe line to OLTC, surge relay, conservastor tank etc and if any required work for satisfactory dismantling.
Complete drain out of transformer oil from the existing 40 MVA transformer-III into empty oil drums or oil tanker.
Replacement of all the gaskets including the top cover of transformer by providing and fixing of new gaskets as per existing size made of Rubberized Cork sheet Kotika/ Turboze/cork brand garde 07 after due fabrication.
Creating vacuum inside the main tank for period of 12 Hrs. and filling of centrifusing oil top up to core, tank, radiator and winding conservator etc.
Complete erection of 40 MVA transformer-III by erection of radiator, conservator tank, HV/LV, neutral bushing, connection of all oil pipe line, erection of cooling fans and all other associated work to complete the job satisfactory.
Centrifuging of complete transformer oil of 40 MVA transformer-III by connecting centrifuging pipe, circulating the transformer oil through centrifuging machine to be provided by the contractor and taking the BDV value periodically till the required value is achieved as per direction of supervising engineer, with all associated work to complete the work satisfactory.
Shifting of oil tank 20 KL from 220 KV Substation Malwan to 132 KV Substation Malwan.
TAJ ENTERPRISES
Omurmila Constructions
Preeti Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .