Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹74.4 LAccepted-Finance | 1 | Accepted-Finance value less than put to tender value | |
| 2 | 2₹77.2 L+₹2.8 L (3.73%)Accepted-Finance | 2 | Accepted-Finance value higher than put to tender value |
Tender Value
₹75.0 L
EMD Value
₹47,600
Closing Date
15 Dec 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Officer/Fit person
A/m Kasivisvanathar temple at Karuveppampundi village,Uthiramerur Taluk and Kancheepuram District
Construction of Ambal Sannathi,mahamadapam and Reconstruction of Moolavar sannathi in A/m Kasivisvanathar temple at Karuveppampundi village,Uthiramerur Taluk and Kancheepuram District
2023_HRCE_388444_1
45559/2023/G1
Open Tender
Civil Works - Others
Lump-sum
270 days
A/m Kasivisvanathar temple
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹47,600
Yes
19 Dec 2023
13 Nov 2023
15 Dec 2023
13 Nov 2023
15 Dec 2023
13 Nov 2023
Amount
Labour charges for removing weathering course and pressed tiles from the sannathi roof and including removing all debris from the site of work.
Removing the undulated and disloged stone elements like stone flooring, stone walls, stone kodungai and stone parapet from Mooalvar sannathi and stocking it for refixing including cost and conveyance labour, handling and etc., all complete.
Flooring
Earthwork excavation for foundation in all soils except hard rock requiring blasting to a full depth with initial lead of 10 m and lift of 2m etc., complete (SS 20B) as directed by the Dept, Officers.
Supplying and filling in foundation and basement with filling sand in layers of 150mm thickness well watered rammed and consolidated complying with relevant std specification including cost of supplying filling sand.
Supplying and filling with gravel including cost and conveyance of gravel and all labour charges for filling ramming etc. complete with standard specifications
Cement concrete 1:5:10 (One of cement five of M-sand and ten of HBG jelly )for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming curing etc.,complete as per Std, Specification and as directed by the Dept, Officers
Refixing the removed stone elements like stone flooring, stone walls, stone kodungai and stone parapet from Mooalvar sannathi as same as it exists that’s including labour charges for fixing, handling and etc., all complete
Cleaning the stone surfaces by water washing the stone elements like, wall nilaikal and pavukkal, including cost of material and labour charges etc,.
Supplying new stones for moolavar, amabal sanathi and mahamandapam of two leaf wall and parapet portions including cost and conveyance etc., all complete.
Dressing and fixing charges for new stones on sannathi and mahamandapam of two leaf wall and parapet wall portion including labour and all complete.
Wall stones inner sides (Ulvari)
Adhistanam
Sthambam
Uthiram (Thani Uthiram)
Pavukkal
Kodungai
Viyalvari
Nilaikkal
Wall stone outer stones
Labour charge for pointing the cut stone masonry work with lime mortar 1:2 excluding cost and conveyance of cut stone but including all labour charges scaffolding etc., complete with standard specifivation. The lime used should be sourced from pollachi which is highly iron fortified and suitable for structural and masonry works.
Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With lime mortar 1:2 etc complete.
Filling of core wall for two leaf stone wall dismantling and re-fixing portion with brick work in lime mortar 1:2 using Second Class Ground Moulded Chamber Burnt Bricks of size 9" x 43/8" x 23/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification.
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work1 sq,ft. Upto 15'
Brick masonry lime mortar 1:2 using Stock bricks including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram
Vimanam/ Gopuram height upto 15'-0"
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with lime mortar 1:1.5 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with lime mortar 1:1.5 and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram
Vimanam/ Gopuram height upto 15'-0"
Providing new sudhai vigrahams in the vimanams and Rajagopurams with Copper rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in LM 1:2 finishing the same with LM 1:2 bringing to the correct shape (Lakshana) in conformist with silpa sastra inclusive of special ornaments, weapons, peedam etc., complete and providing L.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and Copper rods. binding wire all labour for working in heights, curing lifting of materials etc., complete including Exterior Emulsion painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is provided the rate with peetam may be adopted as detailed hereunder)
Sudhai size above 1'-0" below 2'-6"
Sudhai size above 2'-6" to below 3'-6"
Plastering with lime mortar 1:1.5 (One Lime and Five Plastering sand) ,12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.
Providing and laying position,Standardised concrete mi M-20 Grade in accordance with IS :456-2000,using 20mm and down graded hard brocken granite stone jelly for all Rcc items of works with minimum cement content of 3250 kg/cum and maximum water cement ratio of 0.55,inculding admiture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retart setting of concrete, improve workablity without imparing strengh and durability with about (5 cum)7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m)5156 kg of 10-12 mm machine crushed stone jelly and with about(4.79 cu.m)7670 kg of M-sand ,but eculding cost of reinforcement grill and fabricating charges,centering and shuttering and also inculding laying, vibrating with mechanical vibrtors,finishing,curing,etc,complete complying with standred specification and ass directed by the departmentel officers.the coarse and fine aggregates to be used shoul comply with the requirments of IS standreds.(No separate payment will be made by the Department for the excess usage of materials.)
Centering for sides and soffits of Rcc slabs of plain surface like lintels, beams, etc., including strutting 3M hight using MS sheets of size 90cmx60cm and BG 10 stiffened with MS angles of size 25x25x3mm laid over silver oak (C.W) joists of size 10x6.5cm (spaced at about 90cm c/c) and supported by casurina prop. 10cm to 13cm dia ( spaced of 75cm c/c) complying with standard specification and directed by the Dept, Officers. 10sqm.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc.complete complying with standard specification(Contractor has to make his own arrangements for the supply of steel and binding wire).
Special plastering for R.C.C. slab beam and sunshades with Cement mortar 1:3, 10mm thick including cost and conveyance of all materials and labour charges, curing etc. complete complying with standard specifications.
Painting two coat with approved water based Exterior Emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface curing in all floors including brushes etc., complete as per specification. -10 m2
Weathering course concrete with broken jelly 20mm size and pure slaked lime over pavukkal, the proportion being 32:12.5 for required depth of 80mm for giving required slope and thickness of roof on required, well beaten with wooden beater etc, complete with standard specifications.
Finishing the top of roof with one course of machine pressed tiles 20cmx 20cmx20mm of approved quality laid in lime mortar 1:3,12mm thick mixed with water proofing compound 2% by weight of cement used etc, complete with standard specifications.
Supplying and fixing teak wood stem for gopuram kalasam including required materials, labour charges for making and etc., all complete.
Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications
Polishing the teak wood door with two coats of best rfnch (Lac) polsih with approved quality and brand over a coat of bee's waxing including prepareing wooden surface to receive polishing, etc., complete complying as per the standard specifications. (The make, quality and colour of french polish, bees vax should be got approved by the Executive Engineer before use on works.)
Painting new wood work with two coats of synthetic enamel paint of approved quality and color over one coat of white primer in all floors the rate is to include cost of all materials, brushes scaffolding charges etc, complete complying with standard specifications.
Supply and making copper kalasam at the top of all sannathi vimanam for various dia and height including required material, handling charges, labour charges, poilishing ad fixing charges., all complete.
For height upto 3'-3"
For height upto 2'-0"
Sub Total
V.RAJAVELU
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_462833.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .