| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC 2ND FLOOR SHOP NO 303 MARUTI PLAZA RONCHI BANGAR TOWNSHIP MATHURA | MATHURA | UTTAR PRADESH | 281001 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹2.0 L+₹6,600 (3.34%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹3.6 L+₹1.6 L (82.4%)Rejected-AOC | L3 | Rejected-AOC Rejected |
Tender Value
₹2.0 L
EMD Value
₹4,200
Closing Date
2 Apr 2022, 11:00 amClosed
SUPERINTENDING ENGINEER
ELECTRICITY TRANSMISSION CIRCLE-II, PANKI, KANPUR.
YEARLY MAINTENANCE OF SCADA SYSTEM (SIEMENS MAKE) INSTALLED AT 220KV SUBSTATION, SAIFAI UNDER ETD-ETAWAH.
2022_UPTCL_674838_1
E-Tender No.79/ETC-II(K)/2021-22
Open Tender
Electrical Works
Fixed-rate
365 days
ETAWAH
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
Executive Engineer ETD-II Kanpur
₹4,200
30 Oct 2022
18 Jan 2022
2 Apr 2022
18 Jan 2022
2 Apr 2022
18 Jan 2022
Amount
Monthly SCADA Maintenance of 220kv s/s Saifai. 1. SCADA IEC 61850 client-Server topology testing for smooth operation of equipment. 2. IEC-60870-5-101 SCADA over serial communication protocol for SLDC for SLDC Data needs to be checked for data packets sending with real time and its remote tripping from SLDC. 3. IEC-60870-5-104 SCADA over RJ45 communication protocol for SLDC Data needs to be checked for data packets sending with real time and its remote tripping form SLDC. 4. Modbus RTU communication testing for metering parameters from energy meters. 5. DNP-3 over RJ45 communication protocol for SLDC data needs to be checked for data packets sending with real time and its remote tripping from SLDC. 6. IEC61850 Relay healthiness/communication link testing rom SCADA HMI. 7. Testing and rectification of CRP signals to SCADA HMI like, equipment isolators, earth switch, circuit breakers. BCU operation healthiness checking from IEDs to primary equipment’s. 8. SCADA operation healthiness checking of primary equipment like isolators, earth switch, circuit breakers BCU operation healthiness checking from IEDs to primary equipment’s. 9. SCADA HMI soft interlocks and its logic from BCU to each feeder in local/ Remote mode and its healthiness checking for smooth operation for future. 10. Checking of buffered/ unbuffered reports of SCADA. 11. To avoid interruption in SCADA system and its backup storage of hot and standby SCADA HMI-1/2 will be recovered .
2. Communication system architecture and fiber optics path between IEDS/BCUs to SCADA HMI-1/2 healthiness checking. 13. 13 Replacing the damaged /faulty fiber patch cables for smooth operation of the system. 14. Checking of events , alarms, SOE and reports of integrating system with time stamping. 15. 15 GPS synchronization healthiness checking with BCUs/relays .
M/s S.S. Refregeration
SATKAR TRADERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .