Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹82.5 L A/R and M/O to Revenue Pool Buildings (Non GPRA) at S.M.Plot, Phase-II, Sector-VII, Antop Hill, Mumbai-37 during 2023-24. SH:Minor Structural Repairs with external painting to building No.(1,2,3,4,11,14,15,16,17,47,49,51) 12 Nos. at Sector-VII, Phase-II, Antop Hill, Mumbai-400037. | A/R and M/O to Revenue Pool Buildings (Non GPRA) at S.M.Plot, Phase-II, Sector-VII, Antop Hill, Mumbai-37 during 2023-24. SH:Minor Structural Repairs with external painting to building No.(1,2,3,4,11,14,15,16,17,47,49,51) 12 Nos. at Sector-VII, Phase-II, Antop Hill, Mumbai-400037. | L1 | |
| 2 | L2₹90.1 L+₹7.7 L (9.30%) A/R and M/O to Revenue Pool Buildings (Non GPRA) at S.M.Plot, Phase-II, Sector-VII, Antop Hill, Mumbai-37 during 2023-24. SH:Minor Structural Repairs with external painting to building No.(1,2,3,4,11,14,15,16,17,47,49,51) 12 Nos. at Sector-VII, Phase-II, Antop Hill, Mumbai-400037. | A/R and M/O to Revenue Pool Buildings (Non GPRA) at S.M.Plot, Phase-II, Sector-VII, Antop Hill, Mumbai-37 during 2023-24. SH:Minor Structural Repairs with external painting to building No.(1,2,3,4,11,14,15,16,17,47,49,51) 12 Nos. at Sector-VII, Phase-II, Antop Hill, Mumbai-400037. | L2 | |
| 3 | L3₹96.3 L+₹13.9 L (16.8%) A/R and M/O to Revenue Pool Buildings (Non GPRA) at S.M.Plot, Phase-II, Sector-VII, Antop Hill, Mumbai-37 during 2023-24. SH:Minor Structural Repairs with external painting to building No.(1,2,3,4,11,14,15,16,17,47,49,51) 12 Nos. at Sector-VII, Phase-II, Antop Hill, Mumbai-400037. | A/R and M/O to Revenue Pool Buildings (Non GPRA) at S.M.Plot, Phase-II, Sector-VII, Antop Hill, Mumbai-37 during 2023-24. SH:Minor Structural Repairs with external painting to building No.(1,2,3,4,11,14,15,16,17,47,49,51) 12 Nos. at Sector-VII, Phase-II, Antop Hill, Mumbai-400037. | L3 | |
| 4 | - | - |
| Sl No | Description | Qty | Unit | Arjun Singh Rathore L2 | K.P.Enterprises L1 | Ms Shiv Shakthi Enterprises L3 |
|---|---|---|---|---|---|---|
| 1 | Civil Work | - | - | -0.83 ₹90,13,647.58 | -9.27 ₹82,46,528.64 Lowest | 6 ₹96,34,432.22 |
Tender Value
₹90.9 L
EMD Value
₹1.8 L
Closing Date
14 Feb 2024, 3:20 pmClosed
EE-Mumbai-IV
Vikrant Verma
EXECUTIVE ENGINEER, MUMBAI-IV, CPWD, MUMBAI
A/R and M/O to Revenue Pool Buildings (Non GPRA) at S.M.Plot, Phase-II, Sector-VII, Antop Hill, Mumbai-37 during 2023-24. SH:Minor Structural Repairs with external painting to building No.(1,2,3,4,11,14,15,16,17,47,49,51) 12 Nos. at Sector-VII, Phase-II, Antop Hill, Mumbai-400037.
67660
148/EE/Mumbai-IV/2023-24Recall
OPEN
Civil Works - Buildings
NCB
3 months
Mumbai, Maharashtra
5 documents required · 5 mandatory
₹1.8 L
Not Applicable
14 Feb 2024
7 Feb 2024
14 Feb 2024
14 Feb 2024
12 Feb 2024
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT+148+Recall.pdf
document • 1.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .