Loading…
Loading…
Updated dates
Tender Value
₹22.1 L
EMD Value
₹26,000
Closing Date
11 Jun 2026, 1:00 pmDue tomorrow
Superintending Engineer
132 KV S/S Aurangabad Mathura
Work of Transportation Installation and Commissioning of Emergency Restoration System ERS Tower of 132 KV Chhata-Mathura -II Line between Tower no 39 and 40 Under ETD, Mathura
2026_UPTCL_1144717_1
ET-07/ETC(M)/26-27
Open Tender
Electrical Works
90 days
Under ETC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
EE ATT, ETC Mathura
₹26,000
2 May 2026
2 May 2026
12 Jun 2026
2 May 2026
11 Jun 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Execution of ERS (Emergency Restoration System) work for the construction of Chhata-Mathura-II S/C Line under ETD, Mathura . The job includes the following works. | - | - | - | - | item1 |
| 2 | ERS Material Transportation from 400 KV Substation Greater Noida store to work various locations of 132 KV Chhata-Mathura-II S/C Line under the jurisdiction of ETD, Mathura (Dist. approx 250 Km) under Transit Insurance and returning to 400 KV S/S Greater Noida under Transit Insurance as received originally.
Note-all parts of ERS system is to be returned except consumeables like conductor, fitting etc. | 8 | Nos | 26,400 | ₹2,11,200 | item2 |
| 3 | ERS Tower Erection complete in all respects with anchoring arrangement and safely Dismantling of ERS Material at site as per direction of supervising engineer. | 8 | Nos | 2,04,600 | ₹16,36,800 | item3 |
| 4 | Destringing of all 3 Phase conductors & Earthwire of 132 KV Chhata-Mathura-II S/C Line including safely Anchoring by providing of back stay on section tower no. 38 & 43 and associated works. | 1.8 | KM | 66,000 | ₹1,18,800 | item4 |
| 5 | Stringing of 3 phase Conductor & Earthwire in between tower loc of 132 KV Chhata-Mathura-II S/C Line after erection of ERS tower and jumpering at both end and associated works. | - | - | - | - | item5 |
| 6 | Destringing of all 3 Phase conductors of ERS Line section of 132 KV Chhata-Mathura-II S/C Line and safe removal of ERS Towers after restoration of main transmission through newly constructed Line and properly rolling of conductor in drums (Provided by department) and safely shifting of conductor in the store under ETD, Mathura | - | - | - | - | item6 |
| 7 | Arrangement of watch and ward round the clock with atleast 4 nos security guards secutity is each shift at ERS location and from start of ERS installation work to till the dismantling of ERS tower and conductor with hardware fittings is done at various site. | 30 | Days | 7,480 | ₹2,24,400 | item7 |
| 8 | Supply of PG Clamp | 36 | Nos | 461.23 | ₹16,604.28 | item8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
NITF.pdf
Tender Documents • 0.99 MB
BOQ_2139061.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid