Loading…
Loading…
Tender Value
₹30.8 L
EMD Value
₹38,500
Closing Date
10 Sept 2026, 5:00 pmDue tomorrow
Staff Officer (Civil)
GM office SECL Bishrampur Area
Construction of a primary settling tank to improve the quality of filtered water at the filter plant of Bishrampur TA of Bishrampur Area
2026_SECL_364528_1
GM/BSPR/Civil/ e-tender/2026-27/39 dt 29.08.2026
Open Tender
Civil Works - Others
Percentage
90 days
Bishrampur Area
As per NIT and GCC
3 documents required · 3 mandatory
₹38,500
31 Aug 2026
31 Aug 2026
11 Sept 2026
31 Aug 2026
10 Sept 2026
1 Sept 2026
31 Aug 2026 - 7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.All kinds of soil | 122.32 | cum | 127.4 | ₹15,583.57 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 13.23 | cum | 1,145.95 | ₹15,160.92 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 23.18 | cum | 5,724.55 | ₹1,32,695.07 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 32.33 | cum | 6,602.2 | ₹2,13,449.13 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 64.64 | cum | 7,717.7 | ₹4,98,872.13 |
| 6 | Reinforced cement concrete work in beams, suspended foors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 7.54 | cum | 8,102.65 | ₹61,093.98 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 194.16 | sqm | 273.6 | ₹53,122.18 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 779.16 | sqm | 563.1 | ₹4,38,745 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | 59.1 | sqm | 619.55 | ₹36,615.41 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | 7,583.81 | kg | 89.75 | ₹6,80,646.95 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Tendernotice_2.pdf
PDF • 1.35 MB
Tendernotice_3.pdf
PDF • 0.46 MB
BOQ_377447.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .