| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical R O BOGDANG | Accepted-Technical Responsive |
| 2 | Accepted-Technical HANUTHANG | HANUMAKONDA | TELANGANA | 505101 | Accepted-Technical Responsive |
| 3 | Accepted-Technical | Accepted-Technical Responsive |
| 4 | Accepted-Technical R O LAMAYURU | LAMAYURU | LEH | LADAKH | Accepted-Technical Responsive |
Tender Value
₹53.6 L
EMD Value
₹1.3 L
Closing Date
1 Aug 2026, 2:00 pmClosed
Executive Engineer PWD RnB Nubra
Executive Engineer PWD RnB Nubra
Construction of Helipad at Bogdang Nubra. (under SDP)
2026_PWD_19186_1
16 of PWD RnB Nubra 2026-27
Open Tender
Civil Works - Others
Percentage
180 days
Nubra
Please refer Tender documents.
3 documents required · 3 mandatory
₹650
Executive Engineer PWD RnB Nubra.
₹1.3 L
16 Oct 2026
11 Jul 2026
3 Aug 2026
11 Jul 2026
1 Aug 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30cm in depth,1.5m in width as well as10 sqm on plan) including getting out and disposa lof excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.All kinds of soil @90% | 375.84 | Cum | 208.42 | ₹78,332.57 |
| 2 | Ordinary Rock @10% | 41.76 | Cum | 383.88 | ₹16,030.83 |
| 3 | Dry stone pitching (any thickness) excluding cost of stones. On Horizontal | 135.15 | Cum | 537.71 | ₹72,671.51 |
| 4 | Providing and laying in position cement concrete1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 90.1 | Cum | 5,725.33 | ₹5,15,852.23 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm
nominal size) | 15.37 | Cum | 11,102.28 | ₹1,70,642.04 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 180.98 | Cum | 11,551.66 | ₹20,90,619.43 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 10,799 | Kg | 109.33 | ₹11,80,654.67 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form
work for : A)Foundations, footings, bases of columns, etc. for mass concrete | 38.16 | Sqm | 306.15 | ₹11,682.68 |
| 9 | B)Columns, Pillars, Piers, Abutments, Posts and Struts | 13.5 | Sqm | 769 | ₹10,381.5 |
| 10 | D)Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 6 | Sqm | 602.33 | ₹3,613.98 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_45674.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .