| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹34.7 LAccepted-AOC 4988 ARORIAN STREET PATIALA | Ist | Accepted-AOC First lowest | |
| 2 | 2nd₹40.7 LRejected-AOC | 2nd | Rejected-AOC Second lowest | |
| 3 | 3rd₹42.2 LRejected-AOC | 3rd | Rejected-AOC Third lowest |
Tender Value
Refer Docs
EMD Value
₹70,000
Closing Date
8 Nov 2023, 11:00 amClosed
Managing Director
Police Complex, Phase-VII, SAS Nagar.
Design and Construction of RCC OHSR of 100000 ltrs. Capacity providing and fixing of CI pipes, expansion joints, bell mouth puddle collars, duck foot bend, sluice valves etc. at Police Lines, Sangrur and other allied works
2023_DHA_111498_1
14/2023-24
Open Tender
Civil Works - Water Works
Item Rate
180 days
Sangrur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
₹70,000
Yes
22 Dec 2023
25 Oct 2023
9 Nov 2023
25 Oct 2023
8 Nov 2023
25 Oct 2023
Amount
Design and Construction of RCC OHSR of 100000 ltrs. Capacity having height 25.00 mtr. upto FSL complete with external RCC staircase with landing slabs, RCC roof ventilator, water level indicator, lightening conductor, including providing & fixing of CI pipes, expansion joints, bell mouth puddle collars, duck foot bend, sluice valves etc. at at in Police Lines Sangrur and all other works contingent like plinth protection, flooring between columns and haudies etc. (NS)
Earth work excavation in ordinary soil, exclusive of compensation of earth: CSR 6.2(a)
Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods.
Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% excavated from foundation and taken only from outside the building plinth in 15cm layers including ramming, watering and consolidating lead upto 30 metres.CSR 6.8(a)(i)
Cement concrete 1:5:10 with stone aggregate 40 mm gauge using concrete mixer volumatric type. CSR 10.9(b) (ii)
First class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth.CSR 11.3(i)
First class burnt brick work laid in cement sand mortar 1:6 in first storey upto 4 mtr above the plinth level.CSR 11.4(i)
12.5mm thick cement plaster 1:5 on walls.CSR 15.10
Preparation of plastered or concrete surface for painting (including sand papering the surface) using ready mixed cement based wall putty by applying two coats to get required finish .CSR 16.65
Finishing walls with Premium Acrylic smooth exterior paint with silicon additives of required shade with two coats applied @ 1.67litre/10 sqm over and including base coat of water proofing Cement Paint applied @ 2.20 Kg/10 sqm CSR 16.59
Wrought iron and mild steel ladders, framed grills, grating etc.with ends of bars, rivetted or welded or forged, framed window guards, barred iron doors, stair case, iron railing including cost of bolts and nuts or screws or welding rod, complete fixed in position including priming coat with genuine red lead and painting two coats with ready mixed paint for metallic surface in all shades on new steel work or iron work complete in all respects as per Architectural drawings and to the entire satisfaction of Engineer-in-charge.CSR18.4+NS
Providing and fixing hot dip barbed wire weighing 9.34kg per 100 meter (minimum ) and fixed with GI staples tied to 6 mm bar nib,with binding wire of by providing cut,including drilling holes in the post complete(excluding the cost posts,struts which is payable extra ) as per architectural drawing & to the entire satisifaction onf Engineer-In-Charge. NS
Providing, Stringing out, cutting, Jointing and testing of ISI Marked C.I. Pipes Class-LA per IS:1536 and laying the same in trenches to correct alignment and gradients,jointed with rubber tyton joints fitted complete including all cartage. CSR 28.7 A
80mm i/d pipe lines laid complete
100mm i/d pipe lines laid complete
Providing, Stringing out, cutting, Jointing and testing of ISI Marked D.I. Pipe (S&S) as per IS 8329 and laying the same in trenches to correct alignment and gradients, jointed with rubber tyton joints fitted complete including all cartage, cost of rubber ring. CSR 28.7 B
D.I. Pipe as per IS 8329 DI-K7
80mm i/d pipe lines laid complete
100mm i/d pipe lines laid complete
150mm i/d pipe lines laid complete
Extra for fixing of double flanged pipes in vertical position for over head reservoir & stand pipes, scaffolding, derricks, Jim poles, tools and plants, ropes, guys, etc. Complete as desired by Engineer-in- Charge.28.8
80mm i/d pipe lines laid complete
100mm i/d pipe lines laid complete
150mm i/d pipe lines laid complete
Providing & fixing C.I/D.I Flanged end, stem of SS (AIS 1410) and Bronze(gunmetal) working parts Sluice Valves ISI marked 14846-2000, including jointing , testing & cost of Nut, Bolt & insertion sheet, all carriage complete (with the approval of Engineer incharge).CSR 28.27
Class PN-1 as per ISI
80mm i/d Sluice Valves flanged
100mm i/d Sluice Valves flanged
Proving & fixing ISI Marked Non-return valves flanged end class PN-1.0 as per IS:5312/2004 in pipe lines including jointing & cost of Nut Bolt , rubber insertion etc. complete. Note: If Non-return valves class PN-1.6 is used instead of class PN-1.0, than 5% will be paid extra. CLass i) PN. 1.00 as per ISI with rubber Flap CSR 28.31
80mm i/d Non-return valve
100mm i/d Non-return valve
ms kulwant singh sandhu
GURWINDER SINGH DHILLON
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .