Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Finance | -1.01% | ₹1.3 L | L1 | Admitted-Finance |
| 2 | L2₹1.3 L+₹588.05 (0.46%)Admitted-Finance | -0.55% | ₹1.3 L+₹588.05 (0.46%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 L+₹1,163.32 (0.92%)Admitted-Finance | -0.10% | ₹1.3 L+₹1,163.32 (0.92%) | L3 | Admitted-Finance |
Tender Value
₹1.3 L
EMD Value
₹12,785
Closing Date
16 May 2026, 9:00 amClosed
DOODA PRATAPGARH
DOODA PRATAPGARH
NAGAR PANCHAYAT ANTU MEIN NO. JOLHATI MEIN SABHASAD KE GHAR SE NAIM KE GHAR TAK INTERLOCKING NIRMAN KARYA
2026_SUDA_1145171_4
632/DOODA/NIVIDA/2025-26
Open Tender
Civil Works - Others
Percentage
WORK
Please refer Tender documents.
2 documents required · 2 mandatory
₹550
DOODA
₹12,785
25 May 2026
7 May 2026
16 May 2026
7 May 2026
16 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, ackfilling the excavation earth to the extent required and utilising the remaining earth locally for road work as per cluase 3.13 (304) | 8.38 | Cum | 81.79 | ₹685.4 |
| 2 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 days | 1.97 | Cum | 6,357.59 | ₹12,524.45 |
| 3 | Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications as per Sl No-13.1 | 8.15 | Cum | 6,400 | ₹52,160 |
| 4 | Plastering with cement mortar (1:3) on brick work in sub-structure as per Technical Specifications as per Sl No-13.03 | 24.6 | Sqm | 141.64 | ₹3,484.34 |
| 5 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. as per Sl No-12.8 | 1.01 | Cum | 6,688.38 | ₹6,755.26 |
| 6 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | 4.92 | Cum | 2,150 | ₹10,578 |
| 7 | Zig-Zag interlocking providing and laying of rubber moulded reflective zig-zag 80 mm thick tiles of precoat compressed C.C. Passing 30 mpa compressive strength ISI marked concrete thickness 80 mm as per technical specification clause 1504 | 49.2 | Cum | 750 | ₹36,900 |
| 8 | Supply and fixing sign and display board | 1 | Nos | 4,750 | ₹4,750 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.77 MB
BOQ_2140531.xls
BOQ • 0.28 MB
NOTICE.pdf
Tender Documents • 8.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .