Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 LAccepted-Finance | ₹1.4 L | 1 | Accepted-Finance Price Bid is evaluated |
| 2 | 2₹1.5 LAccepted-Finance | ₹1.5 L | 2 | Accepted-Finance Price Bid is evaluated |
| Sl No | Description | Qty | Unit | BHARATHI ENTERPRISES L1 | SELVA MEENA ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling front pedestal cover, overhauling of main oil pump, intermediate pilot valve, Speed load control assembly, Differentiator, EGPV, turbine trip switch, CVSM feed pack pilot Control pilot & over speed striker. Dismantling of front bearing pedestal top cover, disconnecting the oil pipe lines, dismantling the gear coupling inspection & rectification dismantling of main oil pump, rotor float checking, side and top oil clearance checking. Inspection of impeller, wear ring clearance checking inspection of bearings and doing correction works, replacement of bearings, gear coupling if required. MOP & HP rotor alignment checking and correcting the same and assembling the gear coupling and MOP cover. Dismantling the MOP NRV, lapping and blue matching and assembling, Dismantling, cleaning, inspection and assembling of follow pilot, summation pilot, load/speed control pilot, speeder gear assembly, EGPV, intermediate pilot, differentiator, CVSM feedback pilot etc., Speed governor sleeve to nozzle, EGPV lever to over speed striker to rubber. | 1 | No | 1,43,088 ₹1.7 L | 1,45,690 ₹1.7 L |
Tender Value
Refer Docs
EMD Value
₹1,300
Closing Date
2 Mar 2026, 2:00 pmClosed
CE/ TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin 628004
TTPS Mech II TM I Unit I Inspection of governing elements Checking H gap MOP float renewal of MOP Bearings if Necessary Overhauling of CVSM Pilot feed back pilot and Intermediate Pilot valves MOP NRV etc during forthcoming overhaul
2026_EB_656520_1
CE/TTPS/SE/M-II/No.460/2025-26
Open Tender
Miscellaneous Works
40 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹1,300
Yes
5 Mar 2026
13 Feb 2026
3 Mar 2026
13 Feb 2026
2 Mar 2026
13 Feb 2026
Dismantling front pedestal cover, overhauling of main oil pump, intermediate pilot valve, Speed load control assembly, Differentiator, EGPV, turbine trip switch, CVSM feed pack pilot Control pilot & over speed striker. Dismantling of front bearing pedestal top cover, disconnecting the oil pipe lines, dismantling the gear coupling inspection & rectification dismantling of main oil pump, rotor float checking, side and top oil clearance checking. Inspection of impeller, wear ring clearance checking inspection of bearings and doing correction works, replacement of bearings, gear coupling if required. MOP & HP rotor alignment checking and correcting the same and assembling the gear coupling and MOP cover. Dismantling the MOP NRV, lapping and blue matching and assembling, Dismantling, cleaning, inspection and assembling of follow pilot, summation pilot, load/speed control pilot, speeder gear assembly, EGPV, intermediate pilot, differentiator, CVSM feedback pilot etc., Speed governor sleeve to nozzle, EGPV lever to over speed striker to rubber.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_787291.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid