Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹5.2 L+₹414.69 (0.08%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹5.2 L+₹1,347.73 (0.26%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹5.2 L
EMD Value
₹51,800
Closing Date
11 Mar 2026, 4:00 pmClosed
EO Kharela
NP Kharela
PUCHHA SAVDAHGRH GET PAR NALA NIRMAD KAVAR SAHIT
2026_DOLBU_1120073_4
53/nppk/2025-26 dt-23-02-2026
Open Tender
Civil Works
Percentage
90 days
NP Kharela
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
EO
₹51,800
Yes
12 Mar 2026
26 Feb 2026
12 Mar 2026
26 Feb 2026
11 Mar 2026
26 Feb 2026
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge within a distance of 60metres.
Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches.
Cement concrete with gauge approved stone ballast, approved coarse sand. cement in the proportion 8:4:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work.
RCC work with cement approved coarse sand and 2cm. (3/4'') gauge approved stone ballast in the proportion 1:2:4 for slab excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost. (as per S.I. No. 284)
Mild steel of iron in plain work such as reinforced concrete/ brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks and authorised over lapping shall be measured. (S.I. No. 504)
Add 18% GST
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_2083397.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .