| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.5 LAdmitted-Finance | -2.00% | ₹24.5 L | L1 | Admitted-Finance |
| 2 | L2₹25.2 L+₹74,914.26 (3.06%)Admitted-Finance | +1.00% | ₹25.2 L+₹74,914.26 (3.06%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹25.0 L
EMD Value
₹49,940
Closing Date
12 May 2026, 6:00 pmClosed
EO SAGWARA
NAGAR PALIKA SAGWARA
Consrtruction of library hall at block level sagwara
2026_DLB_555456_1
439
Open Tender
Civil Works
Percentage
sagwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EO SAGWARA
₹49,940
18 May 2026
2 May 2026
13 May 2026
2 May 2026
12 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. | - | Cum | 229.5 | - |
| 2 | Random rubble dry stone Kharanja (soling) under floor. | 1 | Cum | 2,270 | ₹2,267.73 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | Cum | 4,575 | - |
| 4 | Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | Cum | 4,860 | ₹4,855.14 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete (Design Mix) excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level :RCC Grade M -20 | 1 | Cum | 6,340 | ₹6,333.66 |
| 6 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete. | - | Sqm | 236.5 | - |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto two stories excluding cost of centring, shuttering, finishing and reinforcement : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar.1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mmnominal size) (As per design mix) | - | Cum | 7,380 | - |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto two stories excluding the cost of centring, shuttering, finishing and reinforcement: including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar.M-20 Grade Concrete 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mmnominal size) (As per design mix) | - | Cum | 7,740 | - |
| 9 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars | 0.6 | Kg | 83.3 | ₹49.9 |
| 10 | Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in :above plinth level upto two stories in all shapes and sizes in : | 0.4 | Cum | 6,500 | ₹2,593.5 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.86 MB
BOQ_989111.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .