Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance PERAMBALUR | TAMIL NADU | 621101 | Admitted-Finance |
| 2 | Admitted-Finance NO 2 325 SOUTH STREET Z KULATHUR POST ANDIMADAM TALUK ARIYALUR DISTRICT | ARIYALUR | TAMIL NADU | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹11,000
Closing Date
23 Nov 2022, 3:00 pmClosed
The Block Development Officer(VP)
Panchayat Union, Thirumanur
Desilting of Ponnankulam at Malathankulam Panchayat in Thirumanur Block of Ariyalur District Under AGAMT II / 2022-23
2022_RDTN_264573_1
R.C.No. B2/980/2022, Date.09.11.2022
Open Tender
Civil Works - Others
Item Rate
90 days
Thirumanur
As per tender document
4 documents required · 4 mandatory
₹0
₹11,000
26 Nov 2022
17 Nov 2022
23 Nov 2022
17 Nov 2022
23 Nov 2022
17 Nov 2022
Amount
Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100m by deploying earth moving machineris and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment developed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill including extra earth filling, breaking clods, watering of OMC and compaction of each layer to 95% of proctor density throudh deployment of appropriate compaction equipment 8 -10 tonne power roller - vibratary power roller short width (+/- 0.90m width durm) power roller or vibratory roller ensuring compaction of designed bund section and also ensuring compaction of earth fill and side slopes through the deploment of hydraulic excavaters with steel plate fixtures attached to their booms / heavy power roller capable of climbing 1:5 (Horizontal) 1:10 (Vertical) slope including side slopes as directed by the eninner in charge of works and as per technical specification (Main pond)
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100m by deploying earth moving machineris and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment developed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill including extra earth filling, breaking clods, watering of OMC and compaction of each layer to 95% of proctor density throudh deployment of appropriate compaction equipment 8 -10 tonne power roller - vibratary power roller short width (+/- 0.90m width durm) power roller or vibratory roller ensuring compaction of designed bund section and also ensuring compaction of earth fill and side slopes through the deploment of hydraulic excavaters with steel plate fixtures attached to their booms / heavy power roller capable of climbing 1:5 (Horizontal) 1:10 (Vertical) slope including side slopes as directed by the eninner in charge of works and as per technical specification (Inlet channel)
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Cement concrete 1:3:6 mix (one cement three sand and six hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Supplying and erecting steel centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, roof slab, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (Country wood) scantings of size 10cm x 6.50cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete. complying with satndard specification and as directed by departmental officers including conveyance of all materilas to site and proper centering etc complete
Supply and fixing of NP3 class 900mm dia
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Shuruthi Engineering
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .