Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹98.9 L+₹10,927.12 (0.11%)Rejected-Finance | L2 | Rejected-Finance l2 |
| Sl No | Description | Qty | Unit | VENKADA BALASUBRAMANIAYN CONTRACTOR L1 | KURUSAMY SOUNDARAPANDIAN L2 |
|---|---|---|---|---|---|
| 1.00Name of Work: PROVIDING PAVER BLOCK PAVEMENT WITH RCC CULVERT AT KARAIYUE REFUGEE CAMP IN KARAIYUE PANCHAYAT (LENGTH1038m) | |||||
| 2.00 | Earthwork excavation in all classes of soil with initial lead & lift as per SS 20B for Pavement etc complete | 101.72 | M3 | 131 ₹13,325.32 Lowest | 132 ₹13,427.04 |
| 3.00 | CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete | 72.66 | M3 | 5,804 ₹4,21,718.64 Lowest | 5,805 ₹4,21,791.3 |
| 4.00 | Providing centering & shuttering charges for pcc plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete | 1,660.8 | M2 | 273 ₹4,53,398.4 Lowest | 274 ₹4,55,059.2 |
| 5.00 | CC 1:3:6mix using 20mm metal including all cost & conveyance of all materials to site & all labour charges etc complete | 249.12 | M3 | 6,560 ₹16,34,227.2 Lowest | 6,561 ₹16,34,476.32 |
| 6.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 560.52 | M3 | 790 ₹4,42,810.8 Lowest | 791 ₹4,43,371.32 |
| 7.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 560.52 | M3 | 2,491 ₹13,96,255.32 Lowest | 2,492 ₹13,96,815.84 |
| 8.00 | Flooring with Paver block with Interlocking precast cc blocks of 60 mm thickness as per standard specification | 3,736.8 | M2 | 781 ₹29,18,440.8 Lowest | 782 ₹29,22,177.6 |
| 9.00 | Earthwork excavation in all classes of soil with initial lead & lift as per SS 20B for Pavement etc complete | 200.94 | M3 | 263 ₹52,847.22 Lowest | 264 ₹53,048.16 |
| 10.00 | CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete | 7.5 | M3 | 5,804 ₹43,530 Lowest | 5,805 ₹43,537.5 |
Tender Value
Refer Docs
EMD Value
₹99,900
Closing Date
28 Oct 2025, 3:00 pmClosed
Thiruppathur Block BDO
Thiruppathur Block BDO
providing paver block pavement with RCC Culvert at Karaiyur Refugees Camp in Karaiyur Panchayat(length 1038m)
2025_RDTN_614472_1
PAVERBLOCKINKARAIYURPANCHAYAT
Open Tender
Civil Works
Item Rate
Thiruppathur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹99,900
Yes
Thiruppathur union
22 Nov 2025
16 Oct 2025
28 Oct 2025
16 Oct 2025
28 Oct 2025
16 Oct 2025
16 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.39 MB
BOQ_734195.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .