Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.4 LAccepted-AOC C BLOCK 4G YUGA KALPATARU NO 18 PILLAYAR KOIL STREET PADIKUPPAM ROAD KOYAMBEDU CHENNAI 600 107 | CHENNAI | TAMIL NADU | 600107 | ₹20.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹20.5 LRejected-Finance 18 CORPORATION ROAD DEVAKOTTAI | SIVAGANGA | TAMIL NADU | 630001 | ₹20.5 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | V MEENAL AND CO L2 | SRI SELLIAMMAN AND CO L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for cutting the BT Surface to 5 to 7 cm depth using milling machine machine, conveying the milled waste materials to atleastfor 20KM distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery incuding all other incidental and unforeseen itemsetc., complete as per the direction of the departmental officers | 2,290 | M2 | 108 ₹2.5 L | 107 ₹2.5 L |
| 2.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the
WMM surface treated with primer using 7 kgs of bituminous
Emulsion (SS) for 10square meter area including cost of
bituminous binder, including labour charges for applying the
required quantity of bituminous binder as Prime coat
manually etc., complete as per 502 of MORTH Rev-5
Specifications | 3,514 | M2 | 82 ₹2.9 L | 81 ₹2.8 L |
| 3.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the
WMM surface treated with binder using 2.5 kgs of
bituminous Emulsion for 10 square meter area including cost
of bituminous binder, including labour charges for applying
the required quantity of bituminous binder as tack coat
manually etc., complete as per 503 of MORTH Specifications | 3,514 | M2 | 17 ₹59,738 | 16 ₹56,224 |
| 4.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50- 13.20mm, 0..25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20 Kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 69 | M3 | 10,200 ₹7.0 L | 10,195 ₹7.0 L |
| 5.00 | Providing and laying Bituminous concrete to 30mm thick using 0.13cum of 19.00-9.50mm graded metal 0.17 cum of 9.50-2.36mm graded metal and 0.26 cum of 2.36mm & below metal by adding the shredded plastic 10% of Bitument quantity 5.03kg (50.30 x 10%=5.03kg) shredded plastic waste over the aggregate heated to 170 degree celcious in the central hot mix plant mixed well with 45.27 kgs of hot bitumen VG30 Bitumen (160 degree celcious) 60/70 grade for premixing per 10 sqm to lay 30mm compacted thick of bituminious concrete including the cost of materials and conveyance of all materials to CMP site, heating the bitumen and aggregates to the required temperature and mixing the minimum required temperature in central hot mix plant 20-30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 80-100 KN vibratory Roller / pneumatic roller to the required density etc., including labour for loading bitumen into bitumen tank and metal to feeder unit, labour for attending to paver side etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper, trucks, paver finisher/9m paver finisher, vibratory/pneumatic rollers and all other tools and plants required, including all other incidental charges etc., complete as per specification using CMP Clause 507 of MORTH REV-5 specifications | 70.8 | M3 | 10,570 ₹7.5 L | 10,570 ₹7.5 L |
Tender Value
₹24.5 L
EMD Value
₹24,500
Closing Date
24 Oct 2025, 3:00 pmClosed
The Commissioner Tambaram City Municipal Corporati
Zone -4 Perungalathur
Providing BT Surface for Rajaji Street and Muthurangan Street in Ward No.49 at Zone4 Tambaram City Municipal Corporation
2025_DMA_616172_1
175/2024/E1
Open Tender
Civil Works
60 days
Tambaram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹24,500
9 Jan 2026
22 Oct 2025
24 Oct 2025
22 Oct 2025
24 Oct 2025
22 Oct 2025
Amount
Charges for cutting the BT Surface to 5 to 7 cm depth using milling machine machine, conveying the milled waste materials to atleastfor 20KM distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery incuding all other incidental and unforeseen itemsetc., complete as per the direction of the departmental officers
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50- 13.20mm, 0..25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20 Kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous concrete to 30mm thick using 0.13cum of 19.00-9.50mm graded metal 0.17 cum of 9.50-2.36mm graded metal and 0.26 cum of 2.36mm & below metal by adding the shredded plastic 10% of Bitument quantity 5.03kg (50.30 x 10%=5.03kg) shredded plastic waste over the aggregate heated to 170 degree celcious in the central hot mix plant mixed well with 45.27 kgs of hot bitumen VG30 Bitumen (160 degree celcious) 60/70 grade for premixing per 10 sqm to lay 30mm compacted thick of bituminious concrete including the cost of materials and conveyance of all materials to CMP site, heating the bitumen and aggregates to the required temperature and mixing the minimum required temperature in central hot mix plant 20-30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 80-100 KN vibratory Roller / pneumatic roller to the required density etc., including labour for loading bitumen into bitumen tank and metal to feeder unit, labour for attending to paver side etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper, trucks, paver finisher/9m paver finisher, vibratory/pneumatic rollers and all other tools and plants required, including all other incidental charges etc., complete as per specification using CMP Clause 507 of MORTH REV-5 specifications
V MEENAL AND CO (BID ID -1495066)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_736256.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid