Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
10 Dec 2019, 3:00 pmClosed
THE PROJECT DIRECTOR DRDA DINDIGUL
THE PROJECT DIRECTOR DRDA DINDIGUL
Renovation of MI Tanks Ponds and Ooranies under SFC Grants for the year 2019-2020 at Vedasandur block TN-05-153
2019_RDTN_149973_1
Roc.No.6271-A11-2019 TN-05-153
Open Tender
Civil Works - Water Works
Item Rate
180 days
THE PROJECT DIRECTOR DRDA DINDIGUL
Renovation of MI Tanks Ponds and Ooranies under SFC Grants for the year 2019-2020 at Vedasandur block TN-05-153
4 documents required · 4 mandatory
₹0
₹50,000
Yes
THE PROJECT DIRECTOR DRDA DINDIGUL
14 Jan 2020
2 Dec 2019
10 Dec 2019
2 Dec 2019
10 Dec 2019
4 Dec 2019
4 Dec 2019
Amount
Part 1 : Renovation of Vadamalayankulam in Nagampatty panchayat Estimate Amount : Rs 3.48 Lakhs
Clearing the Juliflora jungle with uprooting and disposing by the engineer incharge of the works as per technical
Eathwork in all expacted hard rock requirng blasting and conveying earth by deploying earth moving mechinaries and tippers for formation of bund in layer of suitable thickness for formation of bund in layer of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compaction of each layer to 95% proctor density using power/vibrator roller etc complete
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 2 : Renovation of Mungilkulam in Nathapatty panchayat Estimate Amount : Rs 6.65 Lakhs
Clearing the Juliflora jungle with uprooting and disposing by the engineer incharge of the works as per technical
Eathwork in all expacted hard rock requirng blasting and conveying earth by deploying earth moving mechinaries and tippers for formation of bund in layer of suitable thickness for formation of bund in layer of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compaction of each layer to 95% proctor density using power/vibrator roller etc complete
Repairs of Wier
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm
For Centering without strutting(up to basement)
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 3 : Renovation of Rayappapillaikulam in Ammapatty panchayat Estimate Amount : Rs 5.25 Lakhs
Clearing the Juliflora jungle with uprooting and disposing by the engineer incharge of the works as per technical
Eathwork in all expacted hard rock requirng blasting and conveying earth by deploying earth moving mechinaries and tippers for formation of bund in layer of suitable thickness for formation of bund in layer of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compaction of each layer to 95% proctor density using power/vibrator roller etc complete
Repairs to Wier
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm
For Centering without strutting(up to basement)
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 4 : Renovation of Nochikulam in Ammapatty panchayat Estimate Amount : Rs 4.64 Lakhs
Clearing the Juliflora jungle with uprooting and disposing by the engineer incharge of the works as per technical
Eathwork in all expacted hard rock requirng blasting and conveying earth by deploying earth moving mechinaries and tippers for formation of bund in layer of suitable thickness for formation of bund in layer of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compaction of each layer to 95% proctor density using power/vibrator roller etc complete
Repairs to Wier
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm
For Centering without strutting(up to basement)
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 5 : Renovation of Maalaikulam in E.Chithur panchayat Estimate Amount : Rs 6.66 Lakhs
Clearing the Juliflora jungle with uprooting and disposing by the engineer incharge of the works as per technical
Eathwork in all expacted hard rock requirng blasting and conveying earth by deploying earth moving mechinaries and tippers for formation of bund in layer of suitable thickness for formation of bund in layer of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compaction of each layer to 95% proctor density using power/vibrator roller etc complete
Construction of Wier
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Supply and filling of river sand including all cost and conveyance and all charges etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm
For Centering without strutting(up to basement)
For Centering with strutting
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 6 : Renovation of Panikalnkulam in Ammapatty panchayat Estimate Amount : Rs 4.03 Lakhs
Clearing the Juliflora jungle with uprooting and disposing by the engineer incharge of the works as per technical
Eathwork in all expacted hard rock requirng blasting and conveying earth by deploying earth moving mechinaries and tippers for formation of bund in layer of suitable thickness for formation of bund in layer of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compaction of each layer to 95% proctor density using power/vibrator roller etc complete
Repairs to Wier
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm
For Centering without strutting(up to basement)
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 7 : Renovation of Pachalagaoundanur Oorani in Koovakkapatty panchayat Estimate Amount : Rs 2.80 Lakhs
Clearing the Light jungle with uprooting and disposing by the engineer incharge of the works as per technical
Eathwork in all expacted hard rock requirng blasting and conveying earth by deploying earth moving mechinaries and tippers for formation of bund in layer of suitable thickness for formation of bund in layer of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compaction of each layer to 95% proctor density using power/vibrator roller etc complete
Repairs to Wier
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm
For Centering without strutting(up to basement)
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 8 : Renovation of Nallur Alagarkovilkulam Oorani in Kovilur panchayat Estimate Amount : Rs 2.60 Lakhs
Clearing the light jungle with uprooting and disposing by the engineer incharge of the works as per technical
Eathwork in all expacted hard rock requirng blasting and conveying earth by deploying earth moving mechinaries and tippers for formation of bund in layer of suitable thickness for formation of bund in layer of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compaction of each layer to 95% proctor density using power/vibrator roller etc complete
Repairs to Wier
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm
For Centering without strutting(up to basement)
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 9 : Renovation of Kalkulam Oorani in Nagayakottai panchayat Estimate Amount : Rs 5.51 Lakhs
Clearing the light jungle with uprooting and disposing by the engineer incharge of the works as per technical
Eathwork in all expacted hard rock requirng blasting and conveying earth by deploying earth moving mechinaries and tippers for formation of bund in layer of suitable thickness for formation of bund in layer of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compaction of each layer to 95% proctor density using power/vibrator roller etc complete
Construction of Wier
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Supply and filling of river sand including all cost and conveyance and all charges etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm
For Centering without strutting(up to basement)
For Centering with strutting
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 10 : Renovation of Rajapuram Karungal anai in Nagayakottai panchayat Estimate Amount : Rs 4.90 Lakhs
Clearing the Juliflora jungle with uprooting and disposing by the engineer incharge of the works as per technical
Eathwork in all expacted hard rock requirng blasting and conveying earth by deploying earth moving mechinaries and tippers for formation of bund in layer of suitable thickness for formation of bund in layer of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compaction of each layer to 95% proctor density using power/vibrator roller etc complete
Construction of Wier
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Supply and filling of river sand including all cost and conveyance and all charges etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm
For Centering without strutting(up to basement)
For Centering with strutting
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 11 : Renovation of Pudhukulam Oorani in Usilampatty panchayat Estimate Amount : Rs 2.70 Lakhs
Clearing thelight jungle with uprooting and disposing by the engineer incharge of the works as per technical
Eathwork in all expacted hard rock requirng blasting and conveying earth by deploying earth moving mechinaries and tippers for formation of bund in layer of suitable thickness for formation of bund in layer of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compaction of each layer to 95% proctor density using power/vibrator roller etc complete
Repairs to Wier
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm
For Centering without strutting(up to basement)
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sugan K
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .