| 1 | L1₹4.0 CrAccepted-AOC SUNDERPURA SUNDERPURA 126116 | PANCHKULA | PANCHKULA | HARYANA | 126116 | ₹4.0 Cr | L1 | Accepted-AOC Lowest rates after negotiation |
| 2 | L2₹4.4 Cr+₹35.0 L (8.68%)Rejected-Finance | ₹4.4 Cr+₹35.0 L (8.68%) | L2 | Rejected-Finance Rates are on higher side |
| 3 | L3₹4.4 Cr+₹40.8 L (10.1%)Rejected-Finance | ₹4.4 Cr+₹40.8 L (10.1%) | L3 | Rejected-Finance Rates are on higher side |
| 4 | L4₹4.5 Cr+₹41.8 L (10.4%)Rejected-Finance | ₹4.5 Cr+₹41.8 L (10.4%) | L4 | Rejected-Finance Rates are on higher side |
| 5 | Rejected-Technical 1425 SECTOR 7 SONIPAT HARYANA | SONIPAT | SONIPAT | HARYANA | - | - | Rejected-Technical The bid validity has expired as the agency declined to extend the bid validity. |
| Sl No | Description | Qty | Unit | Sh. Ashutosh, Contractor L2 | pankaj kumar goyal L3 | M S CONSTRUCTION L4 | M/S S.S. BUILDERS L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | P/F No smoking board 2`X1` on ACP sheet with vinyl pasting on it fixed with rawl plugs at site complete as per DNIT | 27 | Each | 540 ₹14,580 Lowest | 540 ₹14,580 Lowest | 2,000 ₹54,000 | 540 ₹14,580 Lowest |
| 2.00 | Supply and Fixing of Street Light 90/100 watt Crompton Make. (Havells/Crompton/Philips) complete as per DNIT..... | 74 | Each | 3,939 ₹2,91,486 Lowest | 3,939 ₹2,91,486 Lowest | 4,500 ₹3,33,000 | 3,939 ₹2,91,486 Lowest |
| 3.00 | S/E of 3-Pin top for LED street light connection(Anchor/SSK/Bajaj) complete as per DNIT..... | 52 | Each | 39 ₹2,028 Lowest | 39 ₹2,028 Lowest | 250 ₹13,000 | 39 ₹2,028 Lowest |
| 4.00 | P/F of LED bulb 14/15-watt complete as per DNIT (Syska/Havells and Philips) ..... | 36 | Each | 249 ₹8,964 | 249 ₹8,964 | 200 ₹7,200 Lowest | 249 ₹8,964 |
| 5.00 | P/F of LED tube light fitting 40 w 1X4’ with tube 40w(Havells/Philips complete as per DNIT)..... | 36 | Each | 431 ₹15,516 | 431 ₹15,516 | 350 ₹12,600 Lowest | 431 ₹15,516 |
| 6.00 | Providing and fixing 45 to 50mm x 18mm thick marble stone (Raj nagar plain white) strips in flooring in cement sand mortar 1:3. | 13,278.92 | Rmt. | 43 ₹5,70,993.56 Lowest | 43 ₹5,70,993.56 Lowest | 50 ₹6,63,946 | 43 ₹5,70,993.56 Lowest |
| 7.00 | Recovery of old steel as scrap(Sub Divsion Rohtak) | 69,935.89 | Kg. | 35 ₹-24,47,756.15 Lowest | 35 ₹-24,47,756.15 Lowest | 35 ₹-24,47,756.15 Lowest | 35 ₹-24,47,756.15 Lowest |
| 8.00 | Recovery of old bricks recovered from dismantling of brick work in cement/mud. (Sub Division Sirsa) | 352.44 | 1000 Nos. | 4,000 ₹-14,09,760 Lowest | 4,000 ₹-14,09,760 Lowest | 4,000 ₹-14,09,760 Lowest | 4,000 ₹-14,09,760 Lowest |
| 9.00 | Mechanical Floater for finishing the floor surface complete in all respects (Sub Division Palwal) | 4,051.25 | Sqm | 17.5 ₹70,896.88 Lowest | 17.5 ₹70,896.88 Lowest | 70 ₹2,83,587.5 | 17.5 ₹70,896.88 Lowest |
| 10.00 | concertina coil for panipat circle | 451.1 | Rmt. | 615.6 ₹2,77,697.16 | 615.6 ₹2,77,697.16 | 450 ₹2,02,995 Lowest | 615.6 ₹2,77,697.16 |
Tender Value
₹4.2 Cr
EMD Value
₹8.3 L
Closing Date
22 Feb 2026, 5:00 pmClosed
Naresh Kumar
Bays No 15-18 Sector 2 Panchkula
Reconstruction and raising of Godowns and campus at SWH Safidon.
2026_HBC_502158_1
2026260A57A7 9F81 4EE9 A481 9E5B3AADAD0C1135HWC
Open Tender
Civil Works
Works
210 days
Safidon
2 documents required · 2 mandatory
₹11,800
₹8.3 L
Yes
20 Aug 2026
12 Feb 2026
22 Feb 2026
12 Feb 2026
22 Feb 2026
12 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | P/F No smoking board 2`X1` on ACP sheet with vinyl pasting on it fixed with rawl plugs at site complete as per DNIT | 27 | Each | - | - |
| 2 | Supply and Fixing of Street Light 90/100 watt Crompton Make. (Havells/Crompton/Philips) complete as per DNIT..... | 74 | Each | - | - |
| 3 | S/E of 3-Pin top for LED street light connection(Anchor/SSK/Bajaj) complete as per DNIT..... | 52 | Each | - | - |
| 4 | P/F of LED bulb 14/15-watt complete as per DNIT (Syska/Havells and Philips) ..... | 36 | Each | - | - |
| 5 | P/F of LED tube light fitting 40 w 1X4’ with tube 40w(Havells/Philips complete as per DNIT)..... | 36 | Each | - | - |
| 6 | Providing and fixing 45 to 50mm x 18mm thick marble stone (Raj nagar plain white) strips in flooring in cement sand mortar 1:3. | 13,278.92 | Rmt. | - | - |
| 7 | Recovery of old steel as scrap(Sub Divsion Rohtak) | 69,935.89 | Kg. | - | - |
| 8 | Recovery of old bricks recovered from dismantling of brick work in cement/mud. (Sub Division Sirsa) | 352.44 | 1000 Nos. | - | - |
| 9 | Mechanical Floater for finishing the floor surface complete in all respects (Sub Division Palwal) | 4,051.25 | Sqm | - | - |
| 10 | concertina coil for panipat circle | 451.1 | Rmt. | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_580814.xls
BOQ • 0.26 MB
AD0151584.pdf
Additional Documents • 0.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .