Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
16 Jun 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
BUILDING
14 conditions · 2 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Non submission of the documents shall lead to summarily rejection of the offer.
(a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfillment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract.
Defination of Similar Work :- Any Civil Engineering work.
13 conditions · 2 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Indian Railways Standard General Conditions of Contract, April 2022 (IRGCC, April 2022) with correction slips issued up to date of inviting tender will be applicable for this tender.
Maintenance period is 06 months or one monsoon whichever is later from the date of actual completion date
As per Advance Correction Slip No. 5 dated 20.10.2023 "The Original Bank Guarantee should be delivered in person in this office (i.e in Receive and Dispatch Section of DRM office, Engineering Branch, West Central Railway, Jabalpur) before closing date for submission of bids (i.e. excluding the last date of submission of bids).
Part 1 - Improvement to existing infrastructure to Jabalpur at coaching depot under Assistant Divisional Engineer (HQ) Jabalpur sub division. Part 2 - Repair of leakage and maintenance of coaching depot and CDO building under Assistant Divisional Engineer (HQ) Jabalpur sub division. (Part of work - Improvement to existing infrastructure at Jabalpur & Rewa).
DRMW-JBP-77-2026
DRMW-JBP-77-2026
Open
Works - General
12 Months
Jabalpur, Madhya Pradesh
₹0
₹3.6 L
16 Jun 2026
22 May 2026
2 Jun 2026
227 items across 3 schedules · ₹1,16,17,846.95 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| EARTH WORK | — | — | — | — | |
| Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | — | — | — | — | |
| 1 | All kinds of soil | cum | 366 | 205.45 | 75,194.7 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | cum | 241 | 253.95 | 61,201.95 |
| Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. | — | — | — | — | |
| 3 | All kinds of soil | cum | 121 | 104.5 | 12,644.5 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | cum | 33 | 2,161.2 | 71,319.6 |
| Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. | — | — | — | — | |
| 5 | All kinds of soil | Sqm | 90 | 28.15 | 2,533.5 |
| Supplying chemical emulsion in sealed containers including delivery as specified. | — | — | — | — | |
| 6 | Chlorpyriphos emulsifiable concentrate of 20% | Litre | 161 | 200.9 | 32,344.9 |
| Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : | — | — | — | — | |
| Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: | — | — | — | — | |
| 7 | With Chlorpyriphos E.C. 20% with 1% concentration | Sqm | 291 | 256.15 | 74,539.65 |
| CONCRETE WORK | — | — | — | — | |
| CEMENT CONCRETE (CAST IN SITU) | — | — | — | — | |
| Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | — | — | — | — | |
| 8 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 61 | 7,365.15 | 4,49,274.15 |
| 9 | 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 41 | 6,833.4 | 2,80,169.4 |
| REINFORCED CEMENT CONCRETE | — | — | — | — | |
| CAST IN SITU | — | — | — | — | |
| Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | — | — | — | — | |
| 10 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 131 | 8,364.2 | 10,95,710.2 |
| Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | — | — | — | — | |
| 11 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 1 | 10,185.05 | 10,185.05 |
| 12 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | cum | 16 | 10,719.3 | 1,71,508.8 |
| FORM WORK | — | — | — | — | |
| Centering and shuttering including strutting, propping etc. and removal of form for | — | — | — | — | |
| 13 | Foundations, footings, bases of columns, etc. for mass concrete | Sqm | 106 | 307.95 | 32,642.7 |
| 14 | Suspended floors, roofs, landings, balconies and access platform | Sqm | 43 | 766.55 | 32,961.65 |
| 15 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | Sqm | 141 | 608.35 | 85,777.35 |
| 16 | Columns, Pillars, Piers, Abutments, Posts and Struts | Sqm | 211 | 804.25 | 1,69,696.75 |
| 17 | Small lintels not exceeding 1.5 m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like | Sqm | 3 | 307.95 | 923.85 |
| Edges of slabs and breaks in floors and walls | — | — | — | — | |
| 18 | Above 20 cm wide | Sqm | 3 | 772.1 | 2,316.3 |
| 19 | Weather shade, Chajjas, corbels etc., including edges | Sqm | 31 | 814.95 | 25,263.45 |
| PRE-CAST RCC | — | — | — | — | |
| 20 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | cum | 8 | 9,673.5 | 77,388 |
| STEEL REINFORCEMENT | — | — | — | — | |
| Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | — | — | — | — | |
| 21 | Thermo-Mechanically Treated bars of grade Fe- 500D or more. | Kg | 13991 | 89.65 | 12,54,293.15 |
| Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | — | — | — | — | |
| 22 | Thermo-Mechanically Treated bars of grade Fe- 500D or more. | Kg | 3491 | 89.65 | 3,12,968.15 |
| MASONRY WORK | — | — | — | — | |
| Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: | — | — | — | — | |
| 23 | Cement mortar 1:4 (1 cement : 4 coarse sand) | cum | 11 | 6,882 | 75,702 |
| EXPOSED BRICK WALL | — | — | — | — | |
| Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in superstructure above plinth level up to floor five level in : | — | — | — | — | |
| 24 | Cement mortar 1:4 (1 cement : 4 coarse sand) | cum | 71 | 8,414.65 | 5,97,440.15 |
| STEEL WORK | — | — | — | — | |
| Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters. | — | — | — | — | |
| 25 | 80x0.90 mm M.S. laths with 0.90 mm thick top cover | Sqm | 21 | 2,718.9 | 57,096.9 |
| 26 | Providing and fixing ball bearing for rolling shutters. | Each | 1 | 424.2 | 424.2 |
| Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. | — | — | — | — | |
| 27 | Hot finished welded type tubes | Kg | 4491 | 154.9 | 6,95,655.9 |
| Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. | — | — | — | — | |
| 28 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | Kg | 4991 | 142.3 | 7,10,219.3 |
| FLOORING | — | — | — | — | |
| TILE FLOORING | — | — | — | — | |
| Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). | — | — | — | — | |
| 29 | Dark shade pigment using ordinary cement | Sqm | 51 | 983.95 | 50,181.45 |
| KOTA STONE FLOORING | — | — | — | — | |
| Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : | — | — | — | — | |
| 30 | 25 mm thick | Sqm | 291 | 1,706.6 | 4,96,620.6 |
| ROOFING | — | — | — | — | |
| Providing, fixing and embedding sand cast iron accessories for rain water pipes in the masonry surrounded with 12 mm thick cement mortar of the same mix, as that of masonry (lead caulking will be paid for separately): | — | — | — | — | |
| Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. | — | — | — | — | |
| 31 | 110 mm diameter | Metre | 81 | 319.75 | 25,899.75 |
| Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion. | — | — | — | — | |
| Bend 87.5 degrees | — | — | — | — | |
| 32 | 110 mm bend | Each | 1 | 132 | 132 |
| Providing and fixing unplasticised -PVC pipe clips of approved design to unplasticised - PVC rain water pipes by means of 50x50x50 mm hard wood plugs, screwed with M.S. screws of required length, including cutting brick work and fixing in cement mortar 1:4 (1 cement : 4 coarse sand) and making good the wall etc. complete. | — | — | — | — | |
| 33 | 110 mm | Each | 23 | 309.5 | 7,118.5 |
| 34 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in- charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. | Sqm | 250 | 671.55 | 1,67,887.5 |
| Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete : | — | — | — | — | |
| 35 | Ridges plain (500 - 600mm) | Metre | 11 | 450.6 | 4,956.6 |
| 36 | Gutter (600 mm over all girth) | Metre | 27 | 1,110.6 | 29,986.2 |
| FINISHING | — | — | — | — | |
| CEMENT PLASTER (IN FINE SAND) | — | — | — | — | |
| 15 mm cement plaster on the rough side of single or half brick wall of mix : | — | — | — | — | |
| 37 | 1:4 (1 cement: 4 fine sand) | Sqm | 750 | 339.7 | 2,54,775 |
| Extra for plastering: | — | — | — | — | |
| 38 | Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete. | Sqm | 750 | 214.3 | 1,60,725 |
| Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade : | — | — | — | — | |
| 39 | Two or more coats on new work | Sqm | 750 | 137.85 | 1,03,387.5 |
| Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : | — | — | — | — | |
| 40 | Two or more coats on new work | Sqm | 191 | 131.45 | 25,106.95 |
| DISMANTLING AND DEMOLISHING | — | — | — | — | |
| Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | — | — | — | — | |
| 41 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | cum | 11 | 2,007.1 | 22,078.1 |
| 42 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | cum | 16 | 2,928.1 | 46,849.6 |
| Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | — | — | — | — | |
| 43 | In lime mortar | cum | 41 | 701.95 | 28,779.95 |
| 44 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | Kg | 1490 | 4.65 | 6,928.5 |
| 45 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer- in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | cum | 241 | 219.35 | 52,863.35 |
| ROAD WORK | — | — | — | — | |
| MISCELLANEOUS | — | — | — | — | |
| 46 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. | Sqm | 350 | 951 | 3,32,850 |
| 47 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). | cum | 1 | 8,613.55 | 8,613.55 |
| Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in- charge. | — | — | — | — | |
| 48 | Made of G.I. wire of dia 4 mm | Sqm | 61 | 859.5 | 52,429.5 |
| WATER SUPPLY | — | — | — | — | |
| C.P.V.C. PIPES | — | — | — | — | |
| Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc.-External work | — | — | — | — | |
| 49 | 50 mm dia nominal bore | Metre | 51 | 654.2 | 33,364.2 |
| BRASS FITTINGS | — | — | — | — | |
| Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) : | — | — | — | — | |
| 50 | 50 mm nominal bore | Each | 2 | 878.25 | 1,756.5 |
| DRAINAGE | — | — | — | — | |
| Providing and fixing square-mouth S.W. gully trap class SP-1 complete with C.I. grating brick masonry chamber with water tight C.I. cover with frame of 300 x300 mm size (inside) the weight of cover to be not less than 4.50 kg and frame to be not less than 2.70 kg as per standard design: | — | — | — | — | |
| Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : | — | — | — | — | |
| 51 | 150 mm dia. R.C.C. pipe | Metre | 36 | 493.1 | 17,751.6 |
| ALUMINIUM WORK | — | — | — | — | |
| Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing, paneling and dash fasteners to be paid for separately) : | — | — | — | — | |
| For fixed portion | — | — | — | — | |
| 52 | Anodised aluminium (anodised transparent or dyed to required shade according to IS: 1868, Minimum anodic coating of grade AC 15) | Kg | 140 | 433.95 | 60,753 |
| For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately) | — | — | — | — | |
| 53 | Anodised aluminium (anodised transparent or dyed to required shade according to IS: 1868, Minimum anodic coating of grade AC 15) | Kg | 140 | 531.8 | 74,452 |
| Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge . (Cost of aluminium snap beading shall be paid in basic item): | — | — | — | — | |
| 54 | With float glass panes of 4.0 mm thickness (weight not less than 10kg/sqm) | Sqm | 20 | 1,019.8 | 20,396 |
| Schedule total | ₹85,54,039.1 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tender document
ATTACHMENT
special conditions
ATTACHMENT
Annexure-VIB.pdf
ATTACHMENT
SGCCApril22ACSNo.8to11.pdf
ATTACHMENT
letterforcredit.pdf
ATTACHMENT
JPO for cable cutting
ATTACHMENT
Tenderdocument-Coachingdepot.pdf
ATTACHMENT
Spl.condition-coachingdepot_compressed1.pdf
ATTACHMENT
RlyBdsletterdated03.6.24JPO-CableCut1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .