Tender Value
₹24.7 L
EMD Value
₹49,393
Closing Date
27 Nov 2023, 10:00 amClosed
EE, MID, APWD, Hut Bay
EE, MID, APWD, Hut Bay
Construction of road from PHC main gate to Mortuary building for a length of 230 mtrs at RK Pur under SD III MID APWD Hut Bay
2023_APWD_12210_1
NIT No. 17/MID/DB/2023-24
Open Tender
Civil Works - Roads
Item Rate
90 days
R.K. Pur, Little Andaman
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹49,393
Yes
4 Dec 2023
6 Nov 2023
27 Nov 2023
7 Nov 2023
27 Nov 2023
11 Nov 2023
8 Nov 2023 - 10 Nov 2023
Amount
Banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m :
All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.
All kinds of soil
Preparation and consolidation of sub grade with power road roller of8 to 12 tonne capacity after excavating earth to an average of 22.5cm depth, dressing to camber and consolidating with road rollerincluding making good the undulations etc. and re-rolling the subgrade and disposal of surplus earthwith lead upto 50 metres.
Providing and applying tack coat using hot straight run bitumen ofgrade VG - 10, including heating the bitumen, spraying the bitumenwith mechanically operated spray unit fitted on bitumen boiler,cleaning and preparing the existing road surface as perspecifications :
On W.B.M. @ 0.75 Kg / sqm
2 cm premix carpet surfacing with 1.8 cum and 0.90 cum of stonechippings of 13.2 mm size and 11.2 mm size respectively per 100sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippingsof 13.2 mm and 11.2 mm size respectively, including a tack coatwith hot straight run bitumen, including consolidation with road rollerof 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately).
With paving Asphalt grade VG - 10 heated and then mixedwith solvent at the rate of 70 grams per kg of asphalt
Providing and laying seal coat of premixed fine aggregate ( passing2.36 mm and retained on 180 micron sieve) with bitumen using 128kg of bitumen of grade VG - 10 bitumen per cum of fine aggregateand 0.60 cum of fine aggregate per 100 sqm of road surface, includingrolling and finishing with road roller all complete.
Supplying, stacking aggregate and laying sub-Base and spreading stone aggregate of specified sizes to WBM in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density.
Base course with stone aggregate 90mm to 45mm including stone screening 13.20mm.
Base course with stone aggregate 63mm to 45mm including stone screening 13.20mm (Type-A) 1 cum.
Base course with stone aggregate 53mm to 22.4mm including stone screening 11.20mm (Type-B) 1 cum.
Extraction of earth including carriage the Extraction of white moorum/earth from Govt. quarry at 19km including loading and carriage the same from quarry to work site by mechanical transportation for an average lead of 3.00 km etc all complete including royalty as per the direction of Engineer-in-charge.
Routine Maintenance after completion of work
Routine maintenance cost for 1st Year
Routine maintenance cost for 2nd Year
Routine maintenance cost for 3rd Year
Routine maintenance cost for 4th Year
Routine maintenance cost for 5th Year
ROBIN MAZUMDER
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .