| Sl No | Description | Qty | Unit | Bagavathi constructions L1 |
|---|---|---|---|---|
| 1.00 | Type A - Bituminous Road
a)Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications , (Including GST 18 % ) Etc Completed …..
b)Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27kgs of 60/70 Grade Bulk bitumen and 5.03 kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 , (Including GST 18 % ) Etc Completed ….. | 446 | M2 | 502 ₹2,23,892 Lowest |
| 2.00 | Type B - Bituminous Road
a)Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications , (Including GST 18 % ) Etc Completed …..
b)Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which should consist of construction in a single course base/binder course confirming to the specfication on a previously prepared base, (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch Works) , (Including GST 18 % ) Etc Completed …..
c)Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03 Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler, tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required, including all other incidental charges etc., complete using C M P clause 507 of MORTH Rev-5 specifications. , (Including GST 18 % ) Etc Completed ….. | 433 | M2 | 1,229 ₹5,32,157 Lowest |
| 3.00 | a)Earth Work Excavation Complete direction as per the dept officers (100mm) , (Including GST 18 % ) Etc Completed …..
B)Conveyance of Excavated earth Complete Direction as per the Dept officers (5 KM) (40% of earth work qty) , (Including GST 18 % ) Etc Completed …..
c)Wet Mix Macadam, Providing, laying spreading and compacting Wet Mix Macadam with clean, crushed, graded aggregates and granular material and finised in accordance with the requirements of the specifications and thickness as per approve plans or as directed by the engineer (100mm) , (Including GST 18 % ) Etc Completed .
d)Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications , (Including GST 18 % ) Etc Completed …..
e)Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications , (Including GST 18 % ) Etc Completed.
f)Providing and laying Bituminous concrete to - using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 45.25 kgs of VG60/ VG70 bitumen, 5.03 kg plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30 mm with mechanical paver to the specified grades and cross sections and consolidated by 80-10 tonne vibratory/ pneumatic roller to the required density etc., including labvour for attending to paver site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher /9m paver finisher, vibratory / pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 (Plastic 8 %) , (Including GST 18 % ) Etc Completed . | 281 | m2 | 843.4 ₹2,36,995.4 Lowest |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
11 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Officer
Executive Officer Rudravathi Town Panchayat 24, Kovai Road Kundadam - 638702
Restoration of BT Road Patches and Photholes in Rudravathi Town Panchayat
2026_DTP_719237_1
144/2026
Open Tender
Civil Works - Roads
Works
Rudravathi Town Panchayat
As per Tender Document
2 documents required · 2 mandatory
₹0
₹20,000
23 Nov 2026
29 Oct 2026
11 Nov 2026
29 Oct 2026
11 Nov 2026
29 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Type A - Bituminous Road
a)Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications , (Including GST 18 % ) Etc Completed …..
b)Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27kgs of 60/70 Grade Bulk bitumen and 5.03 kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 , (Including GST 18 % ) Etc Completed ….. | 446 | M2 | - | - |
| 2 | Type B - Bituminous Road
a)Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications , (Including GST 18 % ) Etc Completed …..
b)Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which should consist of construction in a single course base/binder course confirming to the specfication on a previously prepared base, (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch Works) , (Including GST 18 % ) Etc Completed …..
c)Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03 Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler, tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required, including all other incidental charges etc., complete using C M P clause 507 of MORTH Rev-5 specifications. , (Including GST 18 % ) Etc Completed ….. | 433 | M2 | - | - |
| 3 | a)Earth Work Excavation Complete direction as per the dept officers (100mm) , (Including GST 18 % ) Etc Completed …..
B)Conveyance of Excavated earth Complete Direction as per the Dept officers (5 KM) (40% of earth work qty) , (Including GST 18 % ) Etc Completed …..
c)Wet Mix Macadam, Providing, laying spreading and compacting Wet Mix Macadam with clean, crushed, graded aggregates and granular material and finised in accordance with the requirements of the specifications and thickness as per approve plans or as directed by the engineer (100mm) , (Including GST 18 % ) Etc Completed .
d)Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications , (Including GST 18 % ) Etc Completed …..
e)Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications , (Including GST 18 % ) Etc Completed.
f)Providing and laying Bituminous concrete to - using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 45.25 kgs of VG60/ VG70 bitumen, 5.03 kg plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30 mm with mechanical paver to the specified grades and cross sections and consolidated by 80-10 tonne vibratory/ pneumatic roller to the required density etc., including labvour for attending to paver site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher /9m paver finisher, vibratory / pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 (Plastic 8 %) , (Including GST 18 % ) Etc Completed . | 281 | m2 | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_863764.xls
BOQ • 0.24 MB
TechnicalDocument.pdf
Tender Documents • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .