Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹25.4 L+₹2.1 L (8.95%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹25.7 L+₹2.4 L (10.2%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹29.9 L+₹6.6 L (28.2%)Admitted-Finance NO 15 KANNAGI NAGAR KORATTUR CHENNAI 600 080 | CHENNAI | CHENNAI | TAMIL NADU | 600080 | L4 | Admitted-Finance | |
| 5 | L5₹31.7 L+₹8.3 L (35.6%)Admitted-Finance P NO 94 AGS NAGAR ZAMIN PALLAVARAM CHENNAI 600 117 | CHENNAI | CHENGALPATTU | TAMIL NADU | 600117 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PERUMAL.S.K L8 | D.VENKATANARAYANA L6 | JAGAN ENTERPRISES L4 | THIRUMURUGAN ENTERPRISES L3 | SCAN CONSTRUCTION L2 | ALLIRAJ CONSTRUCTION L1 | MK DHANALAKSHMI INFRASTRUCTURE PRIVATE LIMITED L7 | SP TECH ENGINEERING PVT LTD L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation soil and depositing on bank with initial lead of 10m to 100m and lift of 3m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site. | 32.67 | M3 | 952 ₹31,101.84 | 160 ₹5,227.2 | 100 ₹3,267 | 140 ₹4,573.8 | 90 ₹2,940.3 Lowest | 98 ₹3,201.66 | 300 ₹9,801 | 125 ₹4,083.75 |
| 2.00 | Supplying and filling with Sand for foundation layer not more than 15cm thick including cost of labour, transport, consolidation, lead and lift etc., complete as per standerd specification and as directed by the department at site. | 17.94 | M3 | 3,809 ₹68,333.46 | 1,700 ₹30,498 | 1,200 ₹21,528 | 800 ₹14,352 Lowest | 1,000 ₹17,940 | 1,986 ₹35,628.84 | 2,000 ₹35,880 | 1,850 ₹33,189 |
| 3.00 | Providing and laying Plain Cement Concrete 1:3:6 using 20 mm HBG stone including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site. | 17.94 | M3 | 15,583 ₹2,79,559.02 | 6,300 ₹1,13,022 | 5,500 ₹98,670 | 5,000 ₹89,700 | 6,000 ₹1,07,640 | 4,043 ₹72,531.42 Lowest | 6,000 ₹1,07,640 | 5,800 ₹1,04,052 |
| 4.00 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal for Raft including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. | 37.32 | M3 | 18,180 ₹6,78,477.6 | 9,000 ₹3,35,880 | 7,500 ₹2,79,900 | 6,500 ₹2,42,580 | 6,500 ₹2,42,580 | 5,924 ₹2,21,083.68 Lowest | 9,000 ₹3,35,880 | 6,500 ₹2,42,580 |
| 5.00 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal for Column including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. | 6.12 | M3 | 19,045 ₹1,16,555.4 | 12,600 ₹77,112 | 10,000 ₹61,200 | 8,000 ₹48,960 | 7,500 ₹45,900 | 5,924 ₹36,254.88 Lowest | 15,000 ₹91,800 | 7,500 ₹45,900 |
| 6.00 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal for Grade & plinth beam including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. | 5.29 | M3 | 19,045 ₹1,00,748.05 | 12,600 ₹66,654 | 9,000 ₹47,610 | 10,000 ₹52,900 | 8,000 ₹42,320 | 5,576 ₹29,497.04 Lowest | 15,000 ₹79,350 | 7,200 ₹38,088 |
| 7.00 | Providing steel reinforcement for all RCC works including cost of all materilas steel, binding wire, labour, lead, lift, cutting, bending, typing and binding and placing in position etc., complete as directed by the department engineer at site. | 3.41 | MT | 1,64,483 ₹5,60,887.03 | 80,000 ₹2,72,800 | 80,000 ₹2,72,800 | 92,000 ₹3,13,720 | 80,000 ₹2,72,800 | 62,730 ₹2,13,909.3 Lowest | 1,00,000 ₹3,41,000 | 72,000 ₹2,45,520 |
| 8.00 | Brick work in C M 1:5 using good quality secound class chamber burnt bricks ( 9" x 4 3/8" x 2 3/4 ") including cost of all materials labour, lead & lift etc., complete as directed by the department at site. | 44.16 | M3 | 16,448 ₹7,26,343.68 | 8,000 ₹3,53,280 | 7,000 ₹3,09,120 | 6,500 ₹2,87,040 | 6,000 ₹2,64,960 | 4,356 ₹1,92,360.96 Lowest | 8,000 ₹3,53,280 | 6,900 ₹3,04,704 |
| 9.00 | Plastering in CM 1:3 12 mm thick including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site . | 414 | M2 | 606 ₹2,50,884 | 315 ₹1,30,410 | 280 ₹1,15,920 | 270 ₹1,11,780 | 220 ₹91,080 Lowest | 314 ₹1,29,996 | 600 ₹2,48,400 | 310 ₹1,28,340 |
| 10.00 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt and including necessary plaster of paris putty, wherever required etc., including cost of all materials, lead, lift, labour, etc., complete complying with standard specification and as directed by the dept. Engineer at site. | 414 | M2 | 364 ₹1,50,696 | 215 ₹89,010 | 270 ₹1,11,780 | 240 ₹99,360 | 205 ₹84,870 | 251 ₹1,03,914 | 600 ₹2,48,400 | 175 ₹72,450 Lowest |
Tender Value
₹33.5 L
EMD Value
₹33,500
Closing Date
12 Nov 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/GCC-I/CNI
230 KV GIS SS COMPLEX, A-10, THIRU-VI-KA INDUSTRIAL ESTATE, GUINDY, CHENNAI-32.
as per NIT
2026_EB_720078_1
OT-034/26-27 of SE/GCC-I/CNI
Open Tender
Civil Works
Works
120 days
Ambattur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹33,500
Yes
23 Nov 2026
30 Oct 2026
13 Nov 2026
30 Oct 2026
12 Nov 2026
30 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation soil and depositing on bank with initial lead of 10m to 100m and lift of 3m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site. | 32.67 | M3 | - | - |
| 2 | Supplying and filling with Sand for foundation layer not more than 15cm thick including cost of labour, transport, consolidation, lead and lift etc., complete as per standerd specification and as directed by the department at site. | 17.94 | M3 | - | - |
| 3 | Providing and laying Plain Cement Concrete 1:3:6 using 20 mm HBG stone including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site. | 17.94 | M3 | - | - |
| 4 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal for Raft including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. | 37.32 | M3 | - | - |
| 5 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal for Column including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. | 6.12 | M3 | - | - |
| 6 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal for Grade & plinth beam including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. | 5.29 | M3 | - | - |
| 7 | Providing steel reinforcement for all RCC works including cost of all materilas steel, binding wire, labour, lead, lift, cutting, bending, typing and binding and placing in position etc., complete as directed by the department engineer at site. | 3.41 | MT | - | - |
| 8 | Brick work in C M 1:5 using good quality secound class chamber burnt bricks ( 9" x 4 3/8" x 2 3/4 ") including cost of all materials labour, lead & lift etc., complete as directed by the department at site. | 44.16 | M3 | - | - |
| 9 | Plastering in CM 1:3 12 mm thick including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site . | 414 | M2 | - | - |
| 10 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt and including necessary plaster of paris putty, wherever required etc., including cost of all materials, lead, lift, labour, etc., complete complying with standard specification and as directed by the dept. Engineer at site. | 414 | M2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_864720.xls
BOQ • 0.29 MB
OT034.pdf
Tender Documents • 0.92 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .