Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹12.4 LAccepted-AOC | ₹12.4 L | L-1 | Accepted-AOC Work Completed as on dtd. 07.08.2025 |
| 2 | L-2₹15.5 L+₹3.1 L (25.4%)Rejected-Finance A 76 SURENDRA NAGAR ISMAILGANJ FAIZABAD ROAD LUCKNOW UTTAR PRADESH 226016 UDYAM UP 50 0018139 | LUCKNOW | UTTAR PRADESH | 226016 | ₹15.5 L+₹3.1 L (25.4%) | L-2 | Rejected-Finance L-2 bidder. |
| 3 | L-3₹16.8 L+₹4.5 L (36.1%)Rejected-Finance 146 CP COLONY 7 NO CHOURAHA KALPANA NAGAR MORAR GWALIOR 474006 | GWALIOR | MADHYA PRADESH | 474006 | ₹16.8 L+₹4.5 L (36.1%) | L-3 | Rejected-Finance L-3 bidder. |
| 4 | Rejected-Technical G 4 106 107 1ST FLOOR SECTOR 11 ROHINI NEW DELHI 110085 | NORTH WEST | DELHI | 110085 | - | - | Rejected-Technical Not submitted Shortfall documents |
| Sl No | Description | Qty | Unit | Prostarm Info Systems Ltd(Prostar Micronova Power Systems Pvt Ltd) L1 | SUN POWER CONVERSION PVT LTD L2 | Manish Electricals L3 |
|---|---|---|---|---|---|---|
| 1.00SH-I : Supply Part | ||||||
| 1.01 | Supply, Installation, Testing & Commissioning (SITC) of 40KVA online UPS, 3 Phase input, 3 Phase output, PWM IGBT based online double conversion type with inbuilt isolation transformer suitable to Terminal Building emergency Lighting System with 100% unbalanced load at output at full load condition with standard features like 100% rated static bypass, maintenance bypass facilities active input power factor correction, phase sequence corrector,sine wave output, compatibility of generator supply, user friendly LCD display and having provision of upgrading UPS to run in load sharing mode in future, battery management features integrated with main UPS controller, operating condition 415 ±10%, 3 phase 50 Hz AC supply and as per the enclosed technical specifications complete as required.
(Defect Liability period Shall be 02 years) | 2 | Each | 3,50,000 ₹7,00,000 Lowest | 4,44,000 ₹8,88,000 | 4,79,808 ₹9,59,616 |
| 1.02 | Supply, Installation, Testing & Commissioning (SITC) of individual battery bank Set for each 40KVA UPS, 12 Volt & sufficient VAH (as per approved design / calculation) rating for minimum 30 minute backup from each UPS i/c suitable rating battery circuit breakers, interconnection between the batteries, between battery bank and UPS, glanding & termination along with battery rack etc. cabling by copper conductor. | 2 | JOB | 2,00,000 ₹4,00,000 Lowest | 2,45,000 ₹4,90,000 | 2,68,000 ₹5,36,000 |
| 2.00SH-II : AICMC Part All Inclusive Comprehensive Maintenance Contract of 40 KVA UPS for Five years after defect Liability Period of 02 years including preventive and breakdown maintenance from OEM/authorized service dealer of OEM complete as required and as per special conditions of contract. (Battery Bank will not included in the CAMC) | ||||||
| 2.01 | 1st year after Defect Liability Period (3.5 % of SITC cost of UPS (BOQ Item No.01) ) | 2 | JOB | 12,250 ₹24,500 Lowest | 15,540 ₹31,080 | 16,793.28 ₹33,586.56 |
| 2.02 | 2nd year after Defect Liability Period ( 5 % escalation on first year cost ) | 2 | JOB | 12,862.5 ₹25,725 Lowest | 16,317 ₹32,634 | 17,632.94 ₹35,265.88 |
| 2.03 | 3rd year after Defect Liability Period (5 % escalation on second year cost | 2 | JOB | 13,505.63 ₹27,011.26 Lowest | 17,132.85 ₹34,265.7 | 18,514.59 ₹37,029.18 |
| 2.04 | 4th year after Defect Liability Period (5 % escalation on Third year cost | 2 | JOB | 14,180.91 ₹28,361.82 Lowest | 17,989.49 ₹35,978.98 | 19,440.32 ₹38,880.64 |
| 2.05 | 5th year after Defect Liability Period (5 % escalation on Fourth year cost | 2 | JOB | 14,889.96 ₹29,779.92 Lowest | 18,888.96 ₹37,777.92 | 20,412.34 ₹40,824.68 |
Tender Value
₹16.0 L
EMD Value
₹32,052
Closing Date
15 Jan 2025, 6:00 pmClosed
Asstt. Gen. Mgr(Engg-E)
Asstt. General Manager (Engg.-Elect), AAI, RHQ-NR, New Delhi
Provision of 40kVA UPS for New Terminal Building along with AICMC at Khajuraho Airport.
2024_AAI_219320_1
AAI/RHQ/NR/E-E/KHAJ/NIT3/24-25
Open Tender
Electrical Works
Item Rate
60 days
Khajuraho Airport
As per NIT
20 documents required · 20 mandatory
₹1,180
₹32,052
3 Sept 2026
19 Dec 2024
17 Jan 2025
19 Dec 2024
15 Jan 2025
19 Dec 2024
19 Dec 2024 - 23 Dec 2024
Amount
SH-I : Supply Part
Supply, Installation, Testing & Commissioning (SITC) of 40KVA online UPS, 3 Phase input, 3 Phase output, PWM IGBT based online double conversion type with inbuilt isolation transformer suitable to Terminal Building emergency Lighting System with 100% unbalanced load at output at full load condition with standard features like 100% rated static bypass, maintenance bypass facilities active input power factor correction, phase sequence corrector,sine wave output, compatibility of generator supply, user friendly LCD display and having provision of upgrading UPS to run in load sharing mode in future, battery management features integrated with main UPS controller, operating condition 415 ±10%, 3 phase 50 Hz AC supply and as per the enclosed technical specifications complete as required. (Defect Liability period Shall be 02 years)
Supply, Installation, Testing & Commissioning (SITC) of individual battery bank Set for each 40KVA UPS, 12 Volt & sufficient VAH (as per approved design / calculation) rating for minimum 30 minute backup from each UPS i/c suitable rating battery circuit breakers, interconnection between the batteries, between battery bank and UPS, glanding & termination along with battery rack etc. cabling by copper conductor.
SH-II : AICMC Part All Inclusive Comprehensive Maintenance Contract of 40 KVA UPS for Five years after defect Liability Period of 02 years including preventive and breakdown maintenance from OEM/authorized service dealer of OEM complete as required and as per special conditions of contract. (Battery Bank will not included in the CAMC)
1st year after Defect Liability Period (3.5 % of SITC cost of UPS (BOQ Item No.01) )
2nd year after Defect Liability Period ( 5 % escalation on first year cost )
3rd year after Defect Liability Period (5 % escalation on second year cost
4th year after Defect Liability Period (5 % escalation on Third year cost
5th year after Defect Liability Period (5 % escalation on Fourth year cost
SUN POWER CONVERSION PVT LTD (BID ID -808085)
Manish Electricals (BID ID -809049)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .