| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC 14 SURI LANE KOLKATA 700 014 | KOLKATA | KOLKATA | WEST BENGAL | 700014 | ₹5.0 L | L1 | Accepted-AOC Submitted documents are in order and the quoted rate is lowest. |
| 2 | L2₹5.1 L+₹9,604 (1.93%)Rejected-Finance | ₹5.1 L+₹9,604 (1.93%) | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹5.1 L+₹12,631 (2.54%)Rejected-Finance | ₹5.1 L+₹12,631 (2.54%) | L3 | Rejected-Finance 3rd. Lowest |
| 4 | L4₹5.1 L+₹15,917 (3.20%)Rejected-Finance NICHUPATY BOLPUR P WEST BENGAL BIRBHUM PIN 731204 | BOLPUR | BIRBHUM | WEST BENGAL | 731204 | ₹5.1 L+₹15,917 (3.20%) | L4 | Rejected-Finance 4th. Lowest |
| Sl No | Description | Qty | Unit | T.D.K. ENTERPRISE L1 | JAYBEECO L2 | PARTHA SARKAR L3 | NARAYAN CHANDRA DAS L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of LT & HT Cable end termination, conservator tank and breather by skilled workmen using special type tools & tackles to enable the transformer taken out from the transformer room as per direction of EIC | 1 | job | 3,150 ₹3,150 Lowest | 3,470 ₹3,470 | 3,260 ₹3,260 | 3,540 ₹3,540 |
| 2.00 | Hiring charge for Hydra required for lifting and taken out the Transformer from its position and putting the transformer back to its original position after acomplishment of the overall servicing work for the transformer as per direction of EIC | 2 | days | 10,700 ₹21,400 Lowest | 11,770 ₹23,540 | 11,000 ₹22,000 | 12,950 ₹25,900 |
| 3.00 | Charge for draining out the existing transformer oil having high acidity from the transformeras per direction of EIC | 1 | job | 1,780 ₹1,780 Lowest | 1,960 ₹1,960 | 1,840 ₹1,840 | 2,150 ₹2,150 |
| 4.00 | Dismantling the top cover of transformer after draining the damaged transformer oil & taken out the core by using special loader, Chain Pully with required instrument as per direction of EIC. | 1 | job | 5,000 ₹5,000 Lowest | 5,500 ₹5,500 | 5,167 ₹5,167 | 5,610 ₹5,610 |
| 5.00 | Charges for servicing of transformer by hot jet wash after opening 4 sets of bushing and stud rods properly, cleaning the same by CTC oil and re-instaling the same after servicing as per direction of EIC | 1 | job | 10,550 ₹10,550 Lowest | 11,610 ₹11,610 | 10,907 ₹10,907 | 11,840 ₹11,840 |
| 6.00Supply & Replacement of Special type Gasket and other accessories incl. all utilization of suitable adhesive etc. for following as per direction of EIC : | |||||||
| 6.01 | Transformer Top | 1 | set | 5,540 ₹5,540 Lowest | 6,090 ₹6,090 | 5,723 ₹5,723 | 6,210 ₹6,210 |
| 6.02 | Inspection Cover | 1 | set | 4,350 ₹4,350 Lowest | 4,790 ₹4,790 | 4,500 ₹4,500 | 4,880 ₹4,880 |
| 6.03 | Conservator Tank | 1 | set | 2,480 ₹2,480 Lowest | 2,730 ₹2,730 | 2,563 ₹2,563 | 3,000 ₹3,000 |
| 6.04 | Bushing HT and LT | 2 | sets | 2,350 ₹4,700 Lowest | 2,590 ₹5,180 | 2,433 ₹4,866 | 2,800 ₹5,600 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
30 May 2026, 4:00 pmClosed
Assistant Engineer
West Bengal Legislative Assembly South Annex Building Gr Floor Kolkata 700 001
Overhauling and Servicing of transformer (Transformer No. 2, East India Electrical Make, HV 6000, LV-440, Sl. No. 142/2, rating - 500 kVA), installed at West Bengal Legislative Assembly, Kolkata, under Assembly House Electrical Sub-Division, PWDte.
2026_WBPWD_5014271_1
eNIQ No. - 01 /WBPWD/AE/AHESD of 2026-27
Open Tender
ELECTRICAL WORKS ORG
Item Rate
15 days
Assembly House
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
Yes
24 Sept 2026
20 May 2026
2 Jun 2026
20 May 2026
30 May 2026
22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of LT & HT Cable end termination, conservator tank and breather by skilled workmen using special type tools & tackles to enable the transformer taken out from the transformer room as per direction of EIC | 1 | job | - | - |
| 2 | Hiring charge for Hydra required for lifting and taken out the Transformer from its position and putting the transformer back to its original position after acomplishment of the overall servicing work for the transformer as per direction of EIC | 2 | days | - | - |
| 3 | Charge for draining out the existing transformer oil having high acidity from the transformeras per direction of EIC | 1 | job | - | - |
| 4 | Dismantling the top cover of transformer after draining the damaged transformer oil & taken out the core by using special loader, Chain Pully with required instrument as per direction of EIC. | 1 | job | - | - |
| 5 | Charges for servicing of transformer by hot jet wash after opening 4 sets of bushing and stud rods properly, cleaning the same by CTC oil and re-instaling the same after servicing as per direction of EIC | 1 | job | - | - |
| 6Supply & Replacement of Special type Gasket and other accessories incl. all utilization of suitable adhesive etc. for following as per direction of EIC : | |||||
| 6.01 | Transformer Top | 1 | set | - | - |
| 6.02 | Inspection Cover | 1 | set | - | - |
| 6.03 | Conservator Tank | 1 | set | - | - |
| 6.04 | Bushing HT and LT | 2 | sets | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
Tendernotice_2.pdf
PDF • 1.11 MB
BOQ_5082275.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .