Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹15.1 LAccepted-Finance | ₹15.1 L | l1 | Accepted-Finance low |
| 2 | l2₹15.1 LRejected-Finance | ₹15.1 L | l2 | Rejected-Finance high |
| Sl No | Description | Qty | Unit | BALAKUMAR R L1 | R SURESH L2 |
|---|---|---|---|---|---|
| 1.00 | Construction of 3.0 m RCC Slab Culvert and Retaining Wall near Kamatchipuram IMSC @ Kamatchipuram Road in Kamatchipuram Panchayat .
Dismantling the RCC , clearing away and carefully stacking the material for re-use for any thickness of wall including all labour and other incidental charges etc, complete. | 5 | Cum | 4,304.39 ₹21,521.95 | 4,306.54 ₹21,532.70 |
| 2.00 | Dismantling the RR Stone masonry , clearing away and carefully stacking the material for re-use for any thickness of wall including all labour and other incidental charges etc, complete. | 29.7 | Cum | 282.85 ₹8,400.65 | 282.99 ₹8,404.80 |
| 3.00 | Extra for every additional 10m lead or part there of over the initial lead for blasted materials etc., complete (Conveyance 5KM+ Loading Charges) | 34.7 | Cum | 103.12 ₹3,578.26 | 103.17 ₹3,580 |
| 4.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B etc | 54.81 | Cum | 246.27 ₹13,498.06 | 246.39 ₹13,504.64 |
| 5.00 | Filling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete. | 4.99 | Cum | 1,798.43 ₹8,974.17 | 1,799.33 ₹8,978.66 |
| 6.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water
providing etc., complete as per standard specification | 4.99 | cum | 5,238.89 ₹26,142.06 | 5,241.51 ₹26,155.13 |
| 7.00 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Foundation | 33.72 | cum | 5,565.4 ₹1.9 L | 5,568.19 ₹1.9 L |
| 8.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Superstructure | 31.97 | cum | 6,625.71 ₹2.1 L | 6,629.03 ₹2.1 L |
| 9.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Superstructure | 3.9 | cum | 6,625.71 ₹25,840.27 | 6,629.03 ₹25,853.22 |
| 10.00 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs | 8.1 | Cum | 9,174.32 ₹74,311.99 | 9,178.91 ₹74,349.17 |
Tender Value
₹15.3 L
EMD Value
₹15,350
Closing Date
4 Jun 2025, 2:00 pmClosed
Block Development Officer( Vpts)
Block Development Officer( Vpts) Panchayat Union Office Uppiliyapuram
Construction of 3.0 m RCC Slab Culvert and Retaining Wall near Kamatchipuram IMSC at Kamatchipuram Road in Kamatchipuram Panchayat at Uppiliyapuram Block in Tiruchirappalli District. Uppiliyapuram Block in Tiruchirappalli District.
2025_RDTN_562138_2
AA2/801/2025 Dt 21.05.2025
Open Tender
Civil Construction Goods
30 days
Uppiliyapuram
PleaseReferDocuments
5 documents required · 5 mandatory
₹0
₹15,350
Yes
16 Jun 2026
27 May 2025
4 Jun 2025
27 May 2025
4 Jun 2025
27 May 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid