Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-Finance H NO 36 F SIMOLDA WADA REVORA BARDEZ GOA | SOUTH GOA | GOA | 403712 | ₹11.6 L | L1 | Accepted-Finance ACCEPTED |
| 2 | L2₹12.9 L+₹1.3 L (11.2%)Rejected-Finance GOA | ₹12.9 L+₹1.3 L (11.2%) | L2 | Rejected-Finance REJECTED |
| 3 | L3₹14.2 L+₹2.6 L (22.5%)Rejected-Finance 4 155 28 2 SHOP NO C 24 GROUND FLOOR BUILDING C RAJ KRISHNA TOWERS DURGABHAT PONDA GOA | PONDA | GOA | ₹14.2 L+₹2.6 L (22.5%) | L3 | Rejected-Finance REJECTED |
Tender Value
₹14.5 L
EMD Value
₹28,976
Closing Date
26 May 2026, 1:00 pmClosed
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER, CIVIL DIV-XV(N), ELECTRICITY DEPARTMENT, GIDC BUILDING, VI FLOOR, PATTO - PLAZA, PANAJI - GOA.
Urgent renovation to the enclosed terrace of Control room building at 33/11 KV Karaswada sub-station for housing office of Sub Division - I (U), Div. VI, Mapusa.
2026_ED_29244_1
EE/XV/ED/ Notice-08(26-27)/225 Dated 15/05/2026
Open Tender
Civil Works
Percentage
60 days
Mapusa Goa
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,000
₹28,976
11 Jun 2026
18 May 2026
27 May 2026
18 May 2026
26 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Laterite masonry in neatly dressed stones for 23 cms thick masonry walls in cm. 1 : 5 (1 cement : 5 coarse sand) in foundation upto plinth level | 1 | cu.m | 6,346 | ₹6,339.65 |
| 2 | Extra for laterite masonry in all sizes in superstructure from floor I level upto floor V level. | 1 | cu.m | 929 | ₹928.07 |
| 3Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) | |||||
| 3.01 | In beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases upto floor five level | 1 | cu.m | 8,109 | ₹8,100.89 |
| 4Centering & shuttering including Strutting, Propping & removal of forms for : | |||||
| 4.01 | Suspended floors, roofs landings, shelves & their supports | 1 | sq.m | 644 | ₹643.36 |
| 5 | Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. | - | kg | 105 | - |
| 6Half brick masonry in cement mortar 1:4 (1 cement : 4 coarse, sand) with bricks of class designation 75 kg/ sq. cm upto floor five level . | |||||
| 6.01 | Upto floor V level. | - | sq.m | 1,168 | - |
| 7 | 12mm cement plaster 1:4 (1 cement : 4 fine sand) | 1 | sq.m | 223 | ₹222.78 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Tendernotice_2.pdf
PDF • 0.22 MB
BOQ_29672.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .