| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-AOC | ₹6.1 L | L1 | Accepted-AOC LER |
| 2 | L2₹6.1 LRejected-Finance | ₹6.1 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | DHEERAN L2 | R.Krishnamurthy L1 |
|---|---|---|---|---|---|
| 1.00Providing CC Pavement With Culvert @ Pudupettai MGR Nagar in Randam Panchayat | |||||
| 1.01 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 46.74 | Cu.m | 222 ₹10,376.28 | 220 ₹10,282.80 |
| 1.02 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete. | 8.13 | Cu.m | 5,058 ₹41,121.54 | 5,057 ₹41,113.41 |
| 1.03 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened | 153.73 | Sqm | 476 ₹73,175.48 | 474 ₹72,868.02 |
| 1.04 | Cement Concrete 1:3:6 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc. | 54.31 | Cu.m | 5,390 ₹2.9 L | 5,391 ₹2.9 L |
| 1.05 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works | 0.35 | MT | 88,955 ₹31,134.25 | 88,955 ₹31,134.25 |
| 1.06 | cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 6.66 | Cu.m | 6,430 ₹42,823.80 | 6,428 ₹42,810.48 |
| 1.07 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 3.31 | Cu.m | 8,695 ₹28,780.45 | 8,695 ₹28,780.45 |
| 1.08 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 93,626 ₹93,626 | 93,559 ₹93,559 |
Tender Value
₹6.3 L
EMD Value
₹6,300
Closing Date
8 Mar 2024, 3:00 pmClosed
The Block Development Officer (V.Pt), Thruinjapura
The Block Development Officer, Thruinjapuram Block
Providing CC pavement With Culvert at Pudhupettai MGR Nagar Street in Randam Panchayat
2024_RDTN_432565_1
AS No A13-3/1245/2024 Dt 28.02.2024
Open Tender
Civil Works - Others
60 days
The Block Development Office, Thruinjapuram Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,300
Yes
2 Mar 2026
1 Mar 2024
8 Mar 2024
1 Mar 2024
8 Mar 2024
1 Mar 2024
Amount
Providing CC Pavement With Culvert @ Pudupettai MGR Nagar in Randam Panchayat
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened
Cement Concrete 1:3:6 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
DHEERAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid