Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.8 LAccepted-AOC | ₹10.8 L | 1 | Accepted-AOC Tender Awarded |
| 2 | 2₹10.9 LRejected-AOC | ₹10.9 L | 2 | Rejected-AOC Tender Rejected |
| Sl No | Description | Qty | Unit | MUTHUPANDI L2 | MANIAKANDAN.G L1 |
|---|---|---|---|---|---|
| 1.00Providing Interlocking Paver Block Road at Mutharamman kovil street in Pudhupatti village and panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m 1 in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 10.31 | Cum | 200 ₹2,062 | 197 ₹2,031.07 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS 2|HBG metal including cost and conveyance of all materials and all labour charges etc., complete. | 10.31 | Cum | 5,280 ₹54,436.80 | 5,255 ₹54,179.05 |
| 4.00 | Centering charges for all concrete works 3including cost and conveyance of all materials and all labour charges etc., complete | 124.92 | Sqm | 375 ₹46,845 | 360 ₹44,971.20 |
| 5.00 | Cement concrete 1:3:6 mix using 20mm ISS |metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10cum | 9.59 | Cum | 6,010 ₹57,635.90 | 6,007 ₹57,607.13 |
| 6.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC 5/HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity_ index | 110.45 | Cum | 2,110 ₹2.3 L | 2,100 ₹2.3 L |
| 7.00 | Providing and Laying Paver Block of 60mm thick approved design made out of 12mm and 6mm HBGS chips in M30 mix properly cured to attain the required strength, Laying and interlocking 6|block and well compacted using 1-3 ton capacity compressor, the cost inclusive of all materials for manufacturing, interlocking block loading transportation to work site unloading and labour charaes for fixina over Sand bed of 30mm thick | 736.3 | Sqm | 700 ₹5.2 L | 697 ₹5.1 L |
| 8.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm. | 39.8 | Sqm | 285 ₹11,343 | 281 ₹11,183.80 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,65,741 ₹1.7 L | 1,64,721 ₹1.6 L |
Tender Value
₹10.9 L
EMD Value
₹10,950
Closing Date
9 Mar 2026, 3:00 pmClosed
President
Panchayat Office Pudupatti
Providing Inter blocking paver block road at Mutharamman Kovil Street Pudupatti Village and Panchayat
2026_RDTN_669223_1
Pudupatti - 1
Open Tender
Civil Works - Roads
Pudupatti
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,950
Yes
27 Apr 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
Providing Interlocking Paver Block Road at Mutharamman kovil street in Pudhupatti village and panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m 1 in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS 2|HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Centering charges for all concrete works 3including cost and conveyance of all materials and all labour charges etc., complete
Cement concrete 1:3:6 mix using 20mm ISS |metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10cum
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC 5/HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity_ index
Providing and Laying Paver Block of 60mm thick approved design made out of 12mm and 6mm HBGS chips in M30 mix properly cured to attain the required strength, Laying and interlocking 6|block and well compacted using 1-3 ton capacity compressor, the cost inclusive of all materials for manufacturing, interlocking block loading transportation to work site unloading and labour charaes for fixina over Sand bed of 30mm thick
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_804128.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.91 MB
BOQ_804128.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid