| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.8 CrAdmitted-Finance | -33.40% | ₹32.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹34.9 Cr+₹2.1 Cr (6.46%)Admitted-Finance | -29.10% | ₹34.9 Cr+₹2.1 Cr (6.46%) | L2 | Admitted-Finance |
| 3 | L3₹35.3 Cr+₹2.5 Cr (7.52%)Admitted-Finance | -28.39% | ₹35.3 Cr+₹2.5 Cr (7.52%) | L3 | Admitted-Finance |
| 4 | L4₹37.5 Cr+₹4.7 Cr (14.3%)Admitted-Finance AT COLLEGE ROAD KARADAPALI GOBARA TALCHER PO SOUTH BALANDA PS COLLIERY DIST ANGULA STATE ODISHA PIN 759116 | TALCHER | ANGULA | ODISHA | 759116 | -23.86% | ₹37.5 Cr+₹4.7 Cr (14.3%) | L4 | Admitted-Finance |
| 5 | L5₹37.8 Cr+₹5.0 Cr (15.1%)Admitted-Finance | -23.33% | ₹37.8 Cr+₹5.0 Cr (15.1%) | L5 | Admitted-Finance |
Tender Value
₹49.3 Cr
EMD Value
₹49.3 L
Closing Date
30 Mar 2026, 5:00 pmClosed
Chief Engineer, Bridges, Odisha
Nirman Soudha, O/o EIC (Civil), Odisha, Bhubaneswar
Improvement such as widening and strengthening of Turubudi PWD Road to Kuanpada via Limigam- Jhagadapalli- Kendigumma, Banibasa (ODR) from 0/000 km to 17/437 km in the District of Ganjam for the year 2025-26
2026_EICCL_127014_1
CE-BRIDGES-17/2025-26
Open Tender
Civil Works - Roads
Percentage
457 days
in the District of Ganjam
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹49.3 L
Yes
25 May 2026
9 Mar 2026
31 Mar 2026
9 Mar 2026
30 Mar 2026
9 Mar 2026
9 Mar 2026 - 20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 95,659.76 | Sqm | 8.45 | ₹8,08,324.97 |
| 2 | Earth work in excavation in all kinds of soil for road works with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and technical specification, including setting out, dressing of section to correct line, level, grade & camber for road work or dressing of sides and bottom for foundation of structures and loading into tippers, transporting to embankment site within all lifts and lead upto 1000mtr. and utilising the surplus earth locally for road work wherever required, backfilling the excavation earth to the extent required etc complete in all respect as per clause 301 & 304 of Specification for road & bridge work of MORT&H (5th Revision) & Direction of Engineer in charge. | 5,19,490.96 | Cum | 74.79 | ₹3,88,52,728.9 |
| 3 | Excavation for road work by mechanical means in medium hard rock (can not be scapped or peeled with knife, hanheld specimen can be broken with single moderate blow with pick, crushing strength between 100 to 250 kg/ sqcm) in canal, foundation & cutoff trenches of earth dam & other deep cutting by means of Rock Breaker with all lifts , delifts including trimming the bed & slopes to designed finished section loading into & transportation by transport vehicle within 1 Km lead & depositing the excavated materials neatly in specific dump yard as directed by the Engineer-in-Charge | 2,11,199.68 | Cum | 597.8 | ₹12,62,55,168.7 |
| 4 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction as per Technical Specifications and as per Clause - 305.3.4 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 15,111.62 | Cum | 36.04 | ₹5,44,622.78 |
| 5 | Scarifying and removing existing Bituminous surface to the required depth and disposal of scarified material within all lifts and lead upto 1000metres, as per clause No. 305.4.3, 305.8, 305.9.6, 501.8.3.2, 501.8.7.2, 501.8.8.1 and Section 900 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost of all materials, labour, T&P, taxes, royalty etc. complete in all respect and as per direction of the Engineer-in-charge. | 30,470 | Sqm | 6.03 | ₹1,83,734.1 |
| 6 | Reworking and compacting the scarified surface with Stone screened Dust passing through 2.36 mm sieve and retained on 0.075 mm sieve to line and level as per Clause 501.8.3.2 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge | 30,470 | Sqm | 19.88 | ₹6,05,743.6 |
| 7 | Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC SP - 63:2018 and as per direction of Engineer-in-Charge | 600 | Sqm | 608.4 | ₹3,65,040 |
| 8 | Construction of embankment with approved materials deposited at site from road-way cutting and other structures with all lifts and leads graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 1,57,099.37 | Cum | 35.83 | ₹56,28,870.43 |
| 9 | Fine dressing and providing, laying turfing with live sods of perennial turf forming grass on embankment slope, verges or other locations including preparation of ground, fetching of sods with all lifts and leads upto 5 Km and watering complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 307 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 8,569.8 | Sqm | 28.91 | ₹2,47,752.92 |
| 10 | Providing compacted shoulder with granular materials by using moorum of approved quality, watering and compacting with PRR to achieve the required density in OMC complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 408 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 3,569.18 | Cum | 2,502.63 | ₹89,32,336.94 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
DTCN_TURUBUDI.pdf
Tender Documents • 0.89 MB
BOQ_584392.xls
BOQ • 0.73 MB
9953.pdf
PDF • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .