| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 CrAccepted-AOC 26 DHAWAN COLONY FEROZPUR CITY FEROZPUR PUNJAB | ₹4.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.6 CrRejected-AOC 1704 SECTOR 21 PANCHKULA | PANCHKULA | HARYANA | 133301 | ₹4.6 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹4.6 CrRejected-AOC 2030 A BLOCK NO 22 SECTOR 63 CHANDIGARH | NA | NA | 160001 | ₹4.6 Cr | L3 | Rejected-AOC L3 |
| 4 | L4₹4.7 CrRejected-AOC | ₹4.7 Cr | L4 | Rejected-AOC L4 |
| 5 | L5₹4.8 CrRejected-AOC 1954 BELA CHOWK ROPAR | ₹4.8 Cr | L5 | Rejected-AOC L5 |
Tender Value
₹5.4 Cr
EMD Value
₹10.7 L
Closing Date
20 Jan 2026, 10:00 amClosed
Executive Engineer
Construction Division No.1, PWD B and R, Mohali
Left over Rural Link Roads under S/R Programme NIDA Project 2022-23, 23-24 and 24-25 Majri Khijrabad Bindrakh Road Length 9.85 Km. in MC Kurali District SAS Nagar (including Routine Maintenance work for 5 years (1st year will be considered as DLP)
2026_CEPW_157266_1
Bid No.67 Dated 27.11.2025
Open Tender
Civil Works - Roads
180 days
MC Kurali
Please refer Tender documents.
9 documents required · 9 mandatory
₹30,000
Yes
₹10.7 L
Yes
6 Feb 2026
6 Jan 2026
20 Jan 2026
6 Jan 2026
20 Jan 2026
6 Jan 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: EXECUTIVE ENGINEER CONSTRUCTION DIVISION No. 1, PWD B&R BR., MOHALI
Tender Inviting Authority: EXECUTIVE ENGINEER CONSTRUCTION DIVISION No. 1, PWD B&R BR., MOHALI
Name of Work: Left over Rural Link Roads Under S/R Programme NIDA Project 2022-23, 2023-24, 2024-25 Majri Khijrabad Bindrakh Road (Road Code SAS005027) length 9.85 Km. in MC Kurali District SAS Nagar (including Routine Maintenance work for 5 years (1st year will be considered as defect liability period)
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Work Name Item Code / Make Quantity Unit Rate Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 Dismantling of Granular material ag1 Cum Excess(+) Full Conversion INR INR Ninety Two Thousand Two Hundred & Sixty and Paise Ninety Nine Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
2 Compaction of earth work & Preparation of sub grade including loosening, leveling of earth 225mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 300-2 as per Technical clause 305 of MORT&H specifications. (In case of link roads earth work to be done by villagers) ag2 sqm Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
3 Relaying of recovered material obtained from dismantled road material obtained from road crust ag3 cum Excess(+) Full Conversion INR INR Forty Three Thousand Eight Hundred & Fifty Four and Paise Three Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
4 Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.( Only Labour Rate) ag4 Cum Excess(+) Full Conversion INR INR Two Lakh Forty Two Thousand &Thirteen and Paise Ninety Two Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
5 Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per technical clause 406 of MORT&H specifications ag5 Cum Excess(+) Full Conversion INR INR Sixteen Lakh Fifty Six Thousand Nine Hundred & Five and Paise Sixty Four Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
6 Prime Coat @ 0.85kg per sqm Providing and applying primer coat with bitumen emulsion SS on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85kg/sqm complete as per technical clause 502 of MORT&H specifications ag6 sqm Excess(+) Full Conversion INR INR One Lakh Four Thousand Eight Hundred & Sixteen and Paise Twenty Five Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
7 Providing and applying tack coat with penetration grade bitumen VG- 10 using bitumen pressure distributor at the rate of 0.40 kg per sqm on the prepared bituminous surface/granular surface treated with prime coat after cleaning the surface complete as per technical clause 503 of MORT&H specifications ag7 Sqm Excess(+) Full Conversion INR INR Eleven Lakh Twenty Two Thousand Two Hundred & Seventy Five Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
8 Providing and laying Dense Graded Bituminous Macadam 50mm to 75mm thick with batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.5%, carriage of mixed material to site of work, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of MORT&H specifications ag8 cum Excess(+) Full Conversion INR INR Two Crore Thirty Seven Lakh Seventy Eight Thousand One Hundred & Fifty Three and Paise Forty Four Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
9 Providing and applying tack coat with penetration grade bitumen VG- 10 using bitumen pressure distributor at the rate of 0.40 kg per sqm on the prepared bituminous surface/granular surface treated with prime coat after cleaning the surface complete as per technical clause 503 of MORT&H specifications (For BC) ag9 sqm Excess(+) Full Conversion INR INR Twelve Lakh Fifteen Thousand Nine Hundred & Four and Paise Eighty Only
10 Bituminous Concrete 30mm to 45mm thickness (Grading II) Providing and laying bituminous concrete 30mm to 45mm thick with batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.40%, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 509 of MORT&H specifications ag10 cum Excess(+) Full Conversion INR INR One Crore Seventy Eight Lakh Forty Four Thousand Seven Hundred & Sixty Five and Paise Fifty One Only
11 Taking out existing CC interlocking paver blocks from footpath/ central verge/pavement, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in- Charge. (CSR 8.43) ag11 sqm Excess(+) Full Conversion INR INR Three Lakh Five Thousand One Hundred & Eighty One and Paise Five Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
12 Credit of old paver block ag12 sqm Excess(+) Full Conversion INR INR Minus Two Lakh Fifty Nine Thousand Two Hundred & Seventy Nine and Paise Thirty One Only
13 Providing and laying 80 mm thick factory made cement concrete interlocking Paving blocks of M-35 grade manufactured by block making machine equipped with steel mould clamped to a strong vibratory table with hydraulic pressure for compaction of concrete as per IRC SP 63 -2014 and of approved size and design / shape laid in Ordinary Grey Colour and pattern over and including 40 mm thick compacted bed of coarse sand, filling the joints with fine sand etc, all complete as per directions of Engineer-in- Charge. ag13 sqm Excess(+) Full Conversion INR INR Twenty Lakh Seventy Four Thousand Two Hundred & Fifty Four and Paise Five Only
14 Providing and Fixing of Kerb on Side of Road as per CSR 24.41 b ag14 mtr Excess(+) Full Conversion INR INR One Lakh Sixty Three Thousand Five Hundred & Ten and Paise Forty Only
15 Videography of road ag15 nos Excess(+) Full Conversion INR INR One Thousand Only
16 Road Structure :- Reinforced cement concrete M-15 grade village board of standard design fixing in position including painting and printing etc. complete as per PWD specifications ag16 No Excess(+) Full Conversion INR INR Seventeen Thousand Six Hundred & Forty Three and Paise Seventy Eight Only
17 Reinforced cement concrete M-15 grade boundary pillars of standard design as per IRC 25-1967 fixing in position including painting and printing etc. complete as per technical clause 806 of MORT&H specifications ag17 No Excess(+) Full Conversion INR INR Sixty Six Thousand Six Hundred & Twenty Three and Paise Eighteen Only
18 Road Safety Measures :- Road marking with hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 0.25kg per sqm area as per IRC:35 1997 complete as per technical clause 803 of MORT&H specifications ag18 Sqm Excess(+) Full Conversion INR INR Two Lakh Seventeen Thousand &Fifteen and Paise One Only
19 Add extra cost of Cutlural Cess @ 1% on Total cost as items mentioned above on 1 to 18 ag19 Percentage Excess(+) Full Conversion INR INR Four Lakh Eighty Seven Thousand &Seventy Nine and Paise Twenty Two Only
20 PART-II Add Maintenance Cost ag20 2 Construction of chamber for 100mm sluices valve item3 10 Nos
21 Routine Maintenance of construction work as per periodicity to routine maintenance mentioned in the technical specifications. (For 2nd Year) ag21 0.000 Per Km Excess(+) Full Conversion INR INR Four Lakh Ninety Five Thousand One Hundred & Ninety Seven and Paise Twenty Eight Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
22 Routine Maintenance of construction work as per periodicity to routine maintenance mentioned in the technical specifications. (For 3rd Year) ag22 0.000 Per Km Excess(+) Full Conversion INR INR Seven Lakh Ninety Seven Thousand Five Hundred & Forty Two and Paise Ninety Two Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
23 Routine Maintenance of construction work as per periodicity to routine maintenance mentioned in the technical specifications. (For 4th Year) ag23 0.000 Per Km Excess(+) Full Conversion INR INR Thirteen Lakh Seventy Nine Thousand Five Hundred & Eighty Six and Paise Forty Eight Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
24 Routine Maintenance of construction work as per periodicity to routine maintenance mentioned in the technical specifications. (For 5th Year) ag24 0.000 Per Km Excess(+) Full Conversion INR INR Seventeen Lakh Eighty Two Thousand Four Hundred & One and Paise Sixteen Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
25 Add extra cost of Cutlural Cess @ 1% on Total cost as items mentioned above on 21 to 24 ag25 Percentage Excess(+) Full Conversion INR INR Forty Four Thousand Five Hundred & Forty Seven and Paise Twenty Eight Only
Total in Figures INR Five Crore Thirty Six Lakh Ninety Four Thousand Two Hundred & Seventy Six and Paise Forty Five Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
SBD67.pdf
Tender Documents • 22.73 MB
BOQ_318794.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid