Tender Value
₹76 L
EMD Value
₹76,000
Closing Date
30 Sept 2020, 3:00 pmClosed
Additional Director / Project Director
DRDA Salem
Package No.76/2020-21 - Sankari Block - No. of Road Works 03 - Salem District -TNRRIS- 2020-21
2020_RDTN_180322_8
Roc.No.2347/2019/A3
Open Tender
Civil Works - Roads
Item Wise
180 days
DRDA Salem
As per tender Schedule
3 documents required · 3 mandatory
₹0
₹76,000
DRDA Salem
13 Oct 2020
21 Sept 2020
30 Sept 2020
21 Sept 2020
30 Sept 2020
21 Sept 2020
28 Sept 2020
Amount
1.) Valayachettipalayam Road Km 0/0-2/070
Clearing Scrub jungle including cutting all trees and other vegetation and depositing them beyond the road as directed by the departmental officers Including all labour charges etc., complete. KM 0/0-2/070
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction . Km 0/0-1/0
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m. KM 0/0-2/070
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm. Km 0/0-1/0
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site Km 0/0- 1/0
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site Km 0/0-1/0
Applying TACK COAT over WBM surface at 4Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp..Km 0/0- 1/0
Applying TACK COAT over BT surface at 3 Kg of RS-1 Bitumen Emulsion/ 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp..Km 0/0- 1/0
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete . Km 0/0- 1/0
Hectametre Stone
Kilometre Stone
Sign Board
2.) Thanneerpandal Palayam Road Km 0/0-2/400
Clearing Scrub jungle including cutting all trees and other vegetation and depositing them beyond the road as directed by the departmental officers Including all labour charges etc., complete. KM 0/0-2/400
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction . Km 0/0-1/0
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m. KM 0/0-2/400
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm. Km 0/0-1/0
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site Km 0/0- 1/0
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site Km 0/0-1/0
Applying TACK COAT over WBM surface at 4Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp..Km 0/0- 1/0
Applying TACK COAT over BT surface at 3 Kg of RS-1 Bitumen Emulsion/ 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp..Km 0/0- 1/0
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete . Km 0/0- 1/0
Hectametre Stone
Kilometre Stone
Sign Board
3.) Chinnagoundanur to Muniappan Koil Road Km 0/0-2/000
Clearing Scrub jungle including cutting all trees and other vegetation and depositing them beyond the road as directed by the departmental officers Including all labour charges etc., complete. KM 0/0-2/00
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction . Km 0/0-1/0
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m. KM 0/0-2/0
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm. Km 0/0-1/0
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site Km 0/0- 1/0
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site Km 0/0-1/0
Applying TACK COAT over WBM surface at 4Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp..Km 0/0- 1/0
Applying TACK COAT over BT surface at 3 Kg of RS-1 Bitumen Emulsion/ 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp..Km 0/0- 1/0
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete . Km 0/0- 1/0
Hectametre Stone
Kilometre Stone
Sign Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Phoenix and Co
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .